Search Documents

Sort by

  • SME
    Gob Wells—Is There a Way to Predict Water Makers?

    By Julian Brown, Steve Hicks, Zach Agioutantis, Zachary Wedding

    Analysis of Coal Pillar Stability (ACPS) software, released in 2018, integrates numerous empirical pillar design techniques. The ACPS program incorporates methodologies originally available as design

    Jun 25, 2024

  • DFI
    Goethals Bridge Replacement Foundation Design Modifications Due to Field Conditions

    By John P. Turner, Mark Jen, Bobby Daita

    "The Port Authority of New York and New Jersey is replacing the existing Goethals Bridge built in 1928 which is deemed to be functionally obsolete. The replacement bridge will consist of a dual cable-

    Jan 1, 2016

  • DFI
    Goethals Bridge Replacement Project - Performance-Based Design of the Drilled Shaft Foundations

    By Chunli Wei, Mark Jen, Xiaojun Wang

    "After more than 85 years of service, a critical link between New York and New Jersey, the Goethals Bridge over the Arthur Kill waterway, is being replaced with two new parallel bridges. Each bridge i

    Jan 1, 2016

  • AUSIMM
    Going beyond design at Newmont Boddington Gold

    By K Blay, C McCamley, P Petrucci

    The Newmont Boddington Gold (NBG) processing plant was designed for 35Mt/y with ball mills expected to deliver a combined new mill feed rate of 4837 tonnes/hr. Since beginning commercial production in

    Aug 29, 2018

  • SME
    Going Hard at Soft Ground in Buenos Aires

    By Stephen P. E. Redmond

    A 15 km water supply tunnel is being constructed in Buenos Aires, Argentinata expand the capacity of the existing system. Two 4.3 meter diameter Earth Pressure Balance (EPB) tunneling machines operati

    Jan 1, 1999

  • SME
    Golconda Cyanide Regeneration Process

    By Peter W. Willcocks

    The Cyanide Regeneration Process (CRP) was developed by Golconda Engineering and Mining Services and installed at Golconda's Beaconsfield Gold Tailings Retreatment Project situated in Tasmania, Austra

    Jan 1, 1998

  • IMPC
    Gold Adsorption and Elution in Thiosulfate Leaching System Using Functionalized Magnetic Nanoparticles

    By N. D. Ilankoon

    "The use of thiosulfate as an alternative lixiviant for cyanide to treat complex refractory ores followed by the use of ion exchange resins (IX resins) for gold recovery has become an industrial reali

    Jan 1, 2018

  • AUSIMM
    Gold and Base Metal Mineralisation in the Central Pine Creek Geosyncline

    By Butler I. K, Nicholson P. M

    There are four main types of base metal and gold mineralisation recognised in the central Pine Creek Geosyncline. These are stratiform, polymetallic veins, stockwork/concordant gold-quartz veins and

    Jan 1, 1994

  • TMS
    Gold and Silver Mineral Processing Frontiers

    By Hans von Michaelis

    There has been a renaissance in gold and silver extraction and recovery that has taken place over the last fifteen years, since the price of gold was freed from the $3510~ level. Despite major advance

    Jan 1, 1993

  • AUSIMM
    Gold Concentrations at Waiotapu Geothermal Area and Deposition in Geothermal Systems

    By K L. Brown

    In the Waiotapu geothermal area only Champagne Pool, 109 ng/L, and Waiotapu Geyser, 7.6 ng/L, have dissolved Au concentrations greater than 5 ng/L and most springs have concentrations less than 2 ng/L

    Jan 1, 2004

  • AUSIMM
    Gold Deposits in Highly Metamorphosed Terranes

    By A G. Tomkins

    "Approximately 32 per cent of the worldÆs total gold production has come from greenstone belts (Frimmel, 2008). In these regions numerous small to large, quartz vein-associated gold deposits are hoste

    Sep 26, 2013

  • CIM
    Gold Deposits of the Matachewan Area, Ontario

    By W. D. Sinclair

    "Between 1934 and 1956, nearly 31 million grams of gold were produced in the Matachewan area from deposits on properties belonging to Young-Davidson Mines Limited and Matachewan Consolidated Mines Lim

    Jan 1, 1982

  • CIM
    Gold Eagle Mine

    By H. Clare Horwood

    "Two structures, a fracture zone and a shear zone, contained the two orebodies that yielded all the ore mined at the Gold Eagle mine. The orebodies are known as the Gold Eagle vein and the No. 1 shear

    Jan 1, 1954

  • CIM
    Gold exploration in northern saskatchewan by biogeochemical methods

    By Colin E. Dunn

    The high mobility of gold within the plant kingdom results in detectable accumulations of gold in many plants. Concentrations vary within individuals, among species, and with seasons. From an evaluati

    Jan 1, 1986

  • CIM
    Gold Exploration in the Timmins District Using Field and Lithogeochemical Characteristics of Carbonate Alteration Zones

    By J. H. Crocket, J. Andy Fyon

    "All gold deposits within the Tisdale Group are spatially associated with carbonate alteration zones; however, not all carbonate alteration zones are host to gold mineralization.Within the komatiitic

    Jan 1, 1982

  • AUSIMM
    Gold Extraction at the Gwynfynydd Mine, North Wales, United Kingdom: A Case Study of Environmentally Sustainable Mineral Processing Within a National Park

    By R F. G Phelps

    The former Gwynfynydd gold mine is located within the heart of the Snowdonia National Park, North Wales, United Kingdom. The black shale-hosted quartz reefs have intermittently produced more than 50 0

    Jan 1, 2002

  • CIM
    Gold Extraction with Halogens

    By B. Dubreuil, J. -M. Lalancette, D. Lemieux, C. Chouinard

    The extraction of gold and silver has been examined via the use of mixed halogens: chlorine and bromine. The reaction was performed in a brine of sodium chloride with a small amount of sodium bromide

    Jan 1, 2011

  • SME
    Gold Heap Leach Project At Stibnite, Idaho

    By W. L. Josey

    The Stibnite Project is an open pit/cyanide heap leach gold property located in the Yellow Pine mining district of central Idaho. The gold ore is in an oxidized zone of an epithermal deposit which is

    Jan 1, 1984

  • SME
    Gold Heap Leach Simulation And Optimization Using A Multiphysics Model

    By S. Garcia

    The Minera Yanacocha operation presents various operating challenges, due to the complex structure of several heaps interconnected with ponds and gold recovery plants. A comprehensive process model ha

    Jan 1, 2010

  • CIM
    Gold in carbon-rich rocks: improbable protores

    By Janet S. Springer

    Anomalous gold concentrations in carbonaceous material have given rise to misconceptions about the role of carbon in gold depo its. Some hydrocarbon and carbon-rich black muds may how gold contents ra

    Jan 1, 1986