Fracture in Ductile/Brittle Graded Composites
By Keith Rozenburg, Ivar Reimanis, Jesus Chapa
"Experiments in conjunction with finite element analysis (FEA) are used to better predict crack propagation in ductile/brittle graded composites. Cu/W graded composites were fabricated by stacking dis
Jan 1, 2000
-
Fracture Plane Control with a Ligamented Split-Tube Charge
By W. L. Fourney, D. C. Holloway, J. W. Dally
Introduction Improvements in the process of rock excavation by blasting involves better control of one or more phases of the fracture process immediately after detonating the ex- plosive charge. Tota
Jan 1, 1977
-
Fractured Bedrock Investigation by Using High-Resolution Borehole Images and the Distributed Temperature Sensing Technique
By R. Charlier, G. Radioti, J. -P. Radu, S. Delvoie, F. Nguyen
"In order to investigate the fracturing of the bedrock and its possible heterogeneous distribution in situ, four boreholes equipped with double-U geothermal pipes of 100 m long were installed on the c
Jan 1, 2015
-
Fractured Vertical Wells Versus Horizontal Boreholes for Methane Drainage in Advance of Mining U.S. Coals
By Mahyera A, Sakashita B, Ahmed U, Abou-Sayed AS
Gas in U.S. coals is primarily composed of 90 to 99 percent methane and up to 10 per- cent carbon dioxide. In composition and heat- ing value, this coal-bed gas is similar to natural gas and can be
Jan 1, 1982
-
Fragmentation a Vital Link in the Drill to Mill Process Information System
By John Hansen
This paper has been written for presentation at the 103rd Annual General Meeting of the Canadian Institute of Mining, Metallurgy, and Petroleum, April 29 to May 02, 2000. The paper addresses blast pat
May 1, 2001
-
Fragmentation by Blasting through Precise Initiation: Full Scale Trials at the Aitik Copper Mine
By E Novikov, D Johansson, U Nyberg, A Beyglou, N Petropoulos
Fragmentation is an important factor for improving downstream processes in mine operations. Six trials have been conducted at the Aitik copper mine to investigate the effect of ultra-short inter-hole
Jan 1, 2014
-
Fragmentation Improvement at the Mitsubishi Higashitani Limestone Mine
By N Ozawa, R Kaneko, M Arimit
The Mitsubishi Higashitani limestone mine is a ten million tonne per annum operation located near the city of Kitakyushu on JapanÆs western island of Kyushu. Higashitani is one of the largest limeston
Jan 1, 2004
-
Fragmentation Mill Throughput Improvement Through a Dual-Salt Sodium Nitrate Emulsion Product
By Khushaal Popli, Vanessa Roeland, Brian Hall, Carl Diederichs
Highland Valley Copper (HVC) has embraced an integrated Mine to Mill approach to comminution since the late 1990s. Previous blasting optimization was carried out through adjustments to blast pattern g
Feb 6, 2023
-
Fragmentation modeling using the Multiple Blasthole Fragmentation (MBF) model at an openpit mine
By C. McAllister, D. Preece, J. Berendzen
"The Multiple Blasthole Fragmentation (MBF) model models multiple explosive charge contributions and the effect on fragmentation of delay timing with its associated scatter for each blasthole. The mod
Oct 1, 2016
-
Fragmentation of Sandstones and Quartzites
By Lewis L. Oriard
Some two million cubic yards of sandstone and orthoquartzite were blasted and excavated at Upper Stillwater Dam, located high in the Uinta Mountains in northern Utah. The material was processed to pro
Jan 1, 1993
-
Fragmentation Optimisation – Adopting Mine to Mill for Reducing Costs and Increasing Productivity
By V M. Silva, P A. A Martins, V O. Matthew, A L. S Fonseca, E B. Cunha, A J. D Ferrari, E M. S Silva, A C. Silva, D R. T Vilela
The Anglo American phosphate mine is located in the Brazilian state of Goiás and possesses one of Brazil’s most important phosphate rock deposits, with the site being the country’s second largest
Aug 24, 2015
-
Fragmentation Optimization Techniques using 5.5 inch Hole Plugs at the Holcim Cement – St. Genevieve Quarry
By Douglas Bartley
As the economy continues to slowly recover, our industry continues to finds ways to increase productivity while being forced to cut costs. The drilling and blasting process is the starting point of an
Jan 1, 2012
-
Fragmentation Prediction and Assessment at the Ridgeway Deeps and Cadia East Cave Operations
By J L. Lett, I Brunton, T Thornhill
Block cave fragmentation has been documented in the literature to have a significant impact on mine design, performance and downstream material handling and comminution processes. Due to this impact,
May 9, 2016
-
Fragmentation Studies In A Georgia Granite
By Douglas Castleberry
The degree of fragmentation obtained in primary quarry blasting has always been a factor in the speed of digging' the muckpile This paper will discuss a case history of increased production and a
Jan 1, 1960
-
Framework for ergonomic design of control centres in underground coal mines—A Serbian experience
By M. Grozdanovic, D. Marjanovic, M. Ilic
We present a framework for solving the problem of functional compatibility between process control equipment in control centres at underground mines and operator capabilities. The equipment incorporat
Jun 10, 2024
-
Framework for Risk-Based Electric System Deep Foundation Design
By Steve Davidow, Ashely E. Evans, Peter M. Kandaris
"Annually thousands of deep foundations are constructed across North America supporting high voltage transmission line structures. However, a recent state of the practice survey by the Deep Foundation
Jan 1, 2017
-
Framework for Strategic Water Management in the Minerals Industry
Access to secure and reliable water resources is fundamental to the minerals industry. In recognition of that requirement, and cognisant of extensive contemporary public water debate and reform initia
Jan 1, 2006
-
Francoeur Mine
By J. E. Hawley
"The property of Francoeur Gold Mines, Limited, lies directly west of the Armfield mine in Beauchastel township, Abitibi district, and 12 miles west and slightly south of Noranda. The gold deposits ar
Jan 1, 1954
-
Franklin Industrial Minerals -Mica Operations in New Mexico
By Gary L. Nelson
An overview is provided of Franklin Industrial Minerals mica mine and plant operations located near Velarde, New Mexico. Operated by Franklin Industrial Minerals since July of 1990, several process an
Jan 1, 1994
-
Fraser Heights Bridge – Comparison between PDA Tests and Pile Capacity Estimation Methods
By Ali Azizian, Brian Hall
"Driven piles were selected to support the Fraser Heights Bridge bents. Piles were a key component of the top-down construction approach, which was adopted for minimizing potential impacts on an envir
Jan 1, 2016