Search Documents

Sort by

  • SME
    Estimating Recoverable Reserves: Developments In Geostatistical Ore Reserve Estimation (6233c2f1-d6b2-4041-9d9a-0a3cb963948b)

    The accurate estimation of ore reserves along with capital and operating costs are two key components to the successful outcome of any feasibility study. In recent years, there have been many project

    Jan 1, 1994

  • AUSIMM
    Estimating Reserves Of Stone And Sand For Use By The Construction Industry

    It is no longer possible to establish a quarry on the most convenient hill then abandon the site, leaving a scar if the stone or sand in the deposit is found to be unsatisfactory. Before approval i

    Jan 1, 1979

  • SME-ICGCM
    Estimating Rock Mechanics Parameters through Shear Wave Analysis with Well Cad

    By William R. Kohl, Craig B. Clemmens

    "Since 2010, North Central Resources, Bridgeport, WV, has been using the sonic log to estimate the rockmechanics properties of the coal and adjacent strata in their exploration drilling program. In 68

    Jan 1, 2015

  • AUSIMM
    Estimating Sampling and Analytical Errors of Multiple Source Mine Output Blended into a Shipping Product

    Most internationally traded iron ore resources are derived from multiple mine sites, transported to a port facility where they are blended and possibly further processed prior to shipping. Provided th

    Mar 1, 2010

  • SME
    Estimating Secondary Mining Potential Of Inactive And Abandoned Appalachian Highwalls

    By D. E. Hinkle

    Past surface-mining operations in Appalachia primarily followed mountain con-tours. It is estimated that about 18,000 mi. of highwalls are exposed throughout Appalachia. An evaluation procedure for de

    Jan 1, 1989

  • SME
    Estimating Site Closure Costs A Critical Tool For Reclamation Planning

    By T. Hawthorne, H. Barnes

    Homestake Mining Company has developed an estimating model, based on other closed projects, to audit and prepare new estimating plans. The results of recent closure audits reveal that the original bu

    Jan 1, 2000

  • NIOSH
    Estimating the Crush. Zone Size under a Cutting Tool in Coal

    By R. Karl Zipf, Z. T. Bieniawski

    "SummaryAs part of an effort.to understand the mechanics of fine fragment formation in coal, which is important in studies of respirable dust due to mining, fracture toughness measurements and the str

    Aug 31, 1989

  • CIM
    Estimating the Energy Recovery Potential of Newmont’s Carlin Mine Dry Grinding Circuit

    By Aidan Giblett, Michael McGlynn, Peter Radziszewski

    "On the basis that 99% of the energy input into a mill is converted into heat, it is possible to estimate the amount of energy captured in the slurry, the amount that is lost to the environment as wel

    Jan 1, 2016

  • NIOSH
    Estimating the Hydrophobicity of Coal

    By J. A. Gutierrez-Rodriguez, R. J. Purcell, F. F. ApIan

    "Based on contact-angle measurements and the work of adhesion equation, the hydrophobicity of a wide variety of coals was found to decrease with decreasing rank, fixed carbon and total carbon content

    Jan 1, 1989

  • AUSIMM
    Estimating the Rock Mass Strength of Hawkesbury Sandstone

    By R Bertuzzi

    "This paper presents preliminary results of ongoing research being carried out at the University of New South Wales Australia (UNSW) into improved methods for estimating rock mass strength. In this pa

    Nov 5, 2014

  • AUSIMM
    Estimating the thickness of the Martian subsurface layer based on the fault pattern

    By B Bradák, D Asahina, S Saydam, S Akdag

    Human exploration of Mars has been on the horizon of scientific goals for decades now, and as part of the objectives of human missions to various planets, one of the possible goals is opening new econ

    Sep 1, 2024

  • SME
    Estimating the Unconfined Compressive Strength (UCS) of Emplaced Cemented Rockfill (CRF) from QA/QC Cylinder Strengths

    By M. J. Raffaldi, L. A. Sandbak, K. K. Dehn, S. N. Warren, J. B. Seymour

    "Confidence in the design and stability of an undercut cemented rockfill (CRF) span requires a thorough understanding of its emplaced material properties. The unconfined compressive strength (UCS) of

    Jan 1, 2018

  • SME
    Estimating Tunneling Costs Using An Interactive Computer Model

    By William E. Little, William R. Sharp, Edward R. Kennedy

    Cost o f mechanical tunneling requires the knowledge of many machine/rock parameters such as rock types, machine power, penetration rate, cutter life, maintenance schedule, etc. Capital investment, la

    Jan 1, 1983

  • IMPC
    Estimating Water Demand and Availability for Open Water-based Mill Cooling Systems

    Mineral processing is an energy and water intensive activity. Mill comminution equipment usually has high energy requirements which necessitate extensive cooling to remove heat. Cooling requirements a

    Jan 1, 2014

  • SME
    Estimation And Control Of Ground Water Inflow And Discharge From Underground Mines

    By R. E. Snow

    The analysis of ground water inflow and discharge from underground mines has received increased attention in recent years due to environmental issues which must be addressed under current state regula

    Jan 1, 1990

  • CIM
    Estimation and Planning Tool for Industrial Construction Scaffolding

    By C Kumar

    Scaffolds are temporary structures built to facilitate construction activities on site. A considerable amount of resources are allocated to scaffolding on industrial projects. Variability in geometric

    Aug 1, 2013

  • DFI
    Estimation Of Compressibility And Consolidation Characteristics Of Lightly Overconsolidated Soils From In-Situ Time Settlement Plots

    By Lenin T., Madhav M. R., Padmavathi V.

    Use of PVDs and preloading on the ground can significantly reduce the time taken for ground to consolidate. Many soils in situ are lightly overconsolidated, with overconsolidation ratios (OCR) ranging

    Sep 1, 2022

  • SME
    Estimation of Fines Generation in Blasting Using Dynamic Rock Properties and a Near-Field PPV Damage Model "Mining, Metallurgy & Exploration (2020)"

    By Kwangmin Kim, Junnhyeok Park

    In the hard-rock mining industry, the generation of fines during blasting is an important issue because it has a significant effect on production processes. Although various approaches have been used

    May 16, 2020

  • AUSIMM
    Estimation of Flyrock Travel Distances: A Probabilistic Approach

    By M F. L Gibson

    The issue of flyrock is very important in the operation of all mineral extraction sites that use blasting. Unlike the other environmental effects of blasting, ground vibrations and air overpressure, f

    Jan 1, 2001

  • DFI
    Estimation of Foundation Design Loads for Liquefaction Induced Lateral Spreads Using Strain Wedge Method

    By Jogeshwar P. Singh, Mohamed Ashour

    The Soil-Foundation-Structure-Interaction (SFSI) problem involves Kinematic Soil- Foundation Interaction occurring during large (cyclic and permanent) ground deformations as well as Inertial Foundatio

    Jan 1, 2015