Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Developing A New Process Design For The Southwestern Oregon Industrial Mineral Bearing Placer System Via Practical Study Of The Unique Deposition, Mineralogy, And Dry Tailing Requirements - Introduction - Preprint 09-038
By J. Drew
Oregon Resources Corporation (ORC), an industrial minerals mining company, is currently engaged in the development of a new process design that will allow the unique paleo-beach placer deposits of sou
Jan 1, 2009
-
Developing a process flow for the recovery of gold ores in the Philippine small-scale mining industry
By Reinol Compañero, Ivy Gonzales, Herman Mendoza, Brian Buenaventura
"The extraction of gold in the Philippines has been a significant challenge for the past decades. Around 70-75% of gold mined in the country can be accounted from the small-scale mining industry which
Jan 1, 2014
-
Developing a Production Scheduling Model for Large Area Mines
By Amy McBrayer, Andrea Brickey
Limited research has been conducted related to the development of mathematical optimization models for production scheduling at large surface coal mines using the area, i.e., strip, mining method. Inc
Jun 25, 2023
-
Developing a regional data catalogue to support the technical assessment of post-mining land use
By C M. Côte, P Bolz, L Pagliero, M Edraki, M Shaygan, P Erskine
Mines in Queensland must now prepare a Progressive Rehabilitation and Closure (PRC) plan, with the requirement to justify the selection of the post-mining land use (PMLU) for each rehabilitation domai
Aug 2, 2023
-
Developing a Standardized Approach to Shaft Inspections
By S. Hopkins, R. Preston, S. Gillis
"This paper examines typical visual inspections of operational soft rock mine shafts and discusses some of the challenges involved, many of which are associated with inconsistent inspection practices.
Jan 1, 2019
-
Developing a TSF design concept – experience helps but numbers don’t lie
By L D. Munro, S A. Jackson
This paper provides a logical approach to developing a TSF design concept through: • Identifying key properties of tailings and containment structures; • Reviewing underlying principles for effective
Jul 1, 2021
-
Developing a Virtual Reality Environment for Mining Research
By J. Navoyski, B. Macdonald, W. J. Helfrich, J. L. Bellanca, B. Demich
DISCLAIMER The findings and conclusions in this paper are those of the authors and do not necessarily represent the official position of the National Institute for Occupational Safety and Health, Cen
Jan 1, 2019
-
Developing A Virtual Reality Model Focusing On Reducing The Environmental Impact Of Deep-Sea Mining
By Jayne Holden
Development of a deep-sea mining system is a new and interesting field of research. Commercial mining of the ocean floor for SMS deposits is yet to occur, and while exploration of the undersea has bee
Jan 1, 2002
-
Developing a Water Accounting Framework for the Australian Minerals Industry
By K Ringwood, J Cummings, C J. Moran
The development of a water accounting framework that enables consistent and contextual reporting of minerals operationsÆ water use, represents a key sustainable development objective that many Austral
Jan 1, 2009
-
Developing an Artisanal Buying Centre System Meeting Ethical Sourcing Criteria
By G. Bezuidenhout, N. C. Steenkamp
Buying centres are the first point of contact that determines whether ore will be considered as having sufficient provenance to be considered ethically sourced. The information that needs to be captur
Jan 1, 2023
-
Developing An Environmental Effects Monitoring Protocol For Small-Scale Marine Placer Mining: A Reconnaissance Survey Of Pine Cove, Bale Vertex Newfoundland
By Ian B. Clark
In October-November 1993, the Centre for Cold Ocean Resources Engineering, Memorial University of Newfoundland and University of Victoria jointly carried out reconnaissance surveys at Pine Cove, Baie
Jan 1, 1994
-
Developing an Evaluation Model for Economic Feasibility Analysis of Using Mechanical Boring Machines (TBM vs Roadheader) in one of the Largest Coal Reserves in Iran "Mining, Metallurgy & Exploration (2021)"
By Sadegh Elyasi
TBMand roadheader are two dominating excavation machines in underground tunnelling projects. The performance of these two tunnelling machines has been reviewed and analysed individually by many resear
Feb 12, 2021
-
Developing an Information System to Choose Abandoned Mine Sites for Reclamation
By E. K. Albert
Title IV of the 1977 Surface Mining Control and Reclamation Act (SMCRA) provides for an abandoned mine reclamation fund. This fund, taken from fees collected from operating coal mines, provides capita
Jan 1, 1990
-
Developing an Interactive, Collaborative Virtual Underground Mine to Support Mine Emergency Response Excercises
By Tony Szwilski
Using Unity 3D as a collaborative multi-user virtual on-line environment, an interactive virtual underground mine platform (IVUMP) is being developed to provide on-line access to mine safety preparedn
Aug 1, 2013
-
Developing and Evaluating Pit Truck Safety Devices
By W. C. Yates
Lack of visibility from large, open-pit haulage truck cabs has become a serious safety problem. Anaconda conducted a research program to develop a low cost system to alert haulage truck operators to s
Jan 7, 1982
-
Developing and Implementing Ore-Specific Targets for the Rosebery Concentrator
Production targets are the basis for almost every decision made by operations personnel in the daily operation of a concentrator. It is the production targets that determine how the plant is operated
Oct 29, 2012
-
Developing and maintaining mine site ventilation capability and new trends in mine ventilation career paths
By D J. Brake
The importance of mine ventilation to health and safety in both coal and metalliferous mines has been long recognised. The primary and secondary ventilation systems in most metalliferous mines incur 5
Oct 12, 2022
-
Developing Assessment Methods and Remediation Protocols for New Zealand Sites Impacted by Acid Mine Drainage
By A Black, A de Jo, J Cavanagh, J Harding
Acidic and metal-rich waters have been discharging from Sullivan Mine, West Coast, New Zealand since the closure of the mine during the early- 1990s. This has resulted in a decrease in pH from a backg
Jan 1, 2003
-
Developing Australia's First Block Caving Opeartion at Northparkes Mines - Endeavour 26 Deposit
The introduction of a new mining method to Australia is not without its risks and challenges. This paper discusses the processes of planning a new operation, with particular emphasis on block caving
Jan 1, 1995
-
Developing Declines Under a Moving Glacier - The Kumtor Underground Access Story
By Darren Medd
Kumtor Gold Company (KGC) currently operates the 500,000 tonnes per day Kumtor open pit gold mine located in the Issyk-Kul region of the Kyrgyz Republic at an elevation of more than 4,000 m. To supple
Aug 1, 2013