Search Documents

Sort by

  • SME
    Design Strategies For Selective Flocculants

    By G. R. O?Neil

    The justification for a "ligand- selective' approach to fine mineral beneficiation via flocculation is established initially. Special emphasis is placed upon the need to identify non-selective, i

    Jan 1, 1983

  • AUSIMM
    Design to closure – construction of detailed rehabilitation designed iron ore waste rock dumps based on upfront site specific assessment

    By A Kemp, I Taylor, S C. Lamoureux

    Detailed landform designs were completed for six (integrated) iron ore waste rock dumps at a Western Australian iron ore mine site to meet closure objectives and to optimise material movements for clo

    Jul 24, 2017

  • AUSIMM
    Design, Commissioning and Operation of Elura's Larox Pressure Filters

    By Jagger ND

    Pressure filters were found to be necessary to produce Elura silver/lead and zinc concentrates at sufficiently low moisture contents for bulk cargo shipment by sea to smelters.The difficulty in obtain

    Jan 1, 1985

  • CIM
    Design, Commissioning, Start-Up and Performance of Vale’s Long Harbour Stirred Media Detritor Ultrafine Grinding Circuit

    By Adam Moore, Ryan Gillespie, Jarrett Quinn, Audrey Walters, Peter Radziszewski

    "Vale Long Harbour Processing Plant (LHPP) was designed to process Voisey’s Bay nickel concentrate into finished nickel and associated copper and cobalt products. The plant includes a secondary grindi

    Jan 1, 2016

  • DFI
    Design, Construction and Design Validation through High Strength Testing (PDA) of CFA and DD Foundations

    By Stefano Pirrello

    "Sydney’s booming real estate market has pushed property developers to invest in historically “no-go” areas, which were previously too expensive to develop. These areas are usually near rivers where t

    Jan 1, 1900

  • CIM
    Design, Construction and Initial Operation of the Tailings System at Brenda Mines Ltd.

    By H. Tetu, F. Pells

    "The copper-molybdenum property of Brenda Mines Limited is located in the Okanagan district of British Columbia, approximately 25 miles west of Kelowna. The Okanagan Valley is a resort and fruit-growi

    Jan 1, 1971

  • AUSIMM
    Design, Construction and Performance of a Passive Treatment System for the Reduction of Acidity and Dissolved Metals in Acid Sulfate Soil Waterways

    By M D. Melville, B C. T Macdonald, T D. W

    The surface waters in regions with acid sulfate soils (ASS) can contain high concentrations of acidity and dissolved metals. These soils cause problems for agriculture, construction and development. T

    Jan 1, 2003

  • CIM
    Design, Construction and Performance of PKC Dams on Northern Terrain

    By James W. Cassie

    The Snap Lake Diamond Project is located approximately 220 km northeast of Yellowknife, NT, Canada at an approximate latitude of 63?35?. The project location is within the zone of continuous permafros

    May 1, 2003

  • DFI
    Design, Construction And Verification Of Temporary Working Platforms – Australian And New Zealand Good Industry Practice

    By Martin D. Larisch, Ronald Damen

    The design and construction of temporary working platforms for cranes and piling rigs is a high-risk activity. It requires the careful selection of the appropriate input parameters to obtain the corre

    May 1, 2022

  • DFI
    Design, Construction Challenges and Quality Control of a Deep Soil Mixing System for Waterfront Slope Stabilization

    By Yan Lap J. Kan

    "A waterfront stabilization system consisting of Deep Soil Mixing (DSM) columns, vinyl sheet pile fascia, and concrete flood walls supported on shallow footings was designed and constructed for a high

    Jan 1, 2016

  • CIM
    Design, Construction, and Commissioning of Air Separation Units in Remote Locations

    By K. van Warmerdam, M. Pearson, C. Kember, D. McMullen, M. Thayer, C. Ugarenko

    In July 2012, Hatch Ltd. and Air Products & Chemicals Inc. completed construction and commissioning of a 4000 tpd O2 cryogenic air separation unit (ASU) for Barrick Gold’s Pueblo Viejo Project located

    Jan 1, 2014

  • DFI
    Design, Construction, And Instrumentation Of An Atypical A-Frame Micropile Wall In Aspen, Colorado

    By Kyle Kershaw

    Micropiles are routinely used in the United States for foundation support and stabilization of slopes. In recent years, several retaining walls have been constructed using micropiles in an A-frame ty

    Jan 1, 2007

  • DFI
    Design, Construction, and Long-Term Monitoring of a Pile-Supported LNG Tank in Savannah, Georgia

    By Cheng Lin, Guoming Lin

    "This paper presents a case history for the design, construction and long-term performance monitoring of a driven prestressed concrete (PSC) piled foundation supporting a large liquefied natural gas (

    Jan 1, 1900

  • DFI
    Design, Construction, and Performance of the Temporary Earth Retention System at No. 9 Walton

    By Joel B. Dellaria, Justin R. Lewis

    "No. 9 Walton is a new high-rise condominium building located in the Gold Coast area of Chicago. The adjacent building, Walton on the Park, featured 4 levels of below grade parking and utilized a seca

    Jan 1, 2017

  • CIM
    Design, Construction, and Start-up of Stillwater Mining’s East Boulder Concentrator

    By P. Lefebvre, J. Sargent, K. Major, B. Darnton

    "Stillwater Mining commenced mining operations at Nye, Montana in 1987 for the recovery of platinum and palladium. Exploration identified that the J-M Reef extended for 43 km. In 1998 Stillwater Minin

    Jan 1, 2003

  • AUSIMM
    Design, implementation and field performance of a face destress blasting method for mine development

    By E Villaescusa, C Drover, I Onederra

    Development face destress blasting is a construction technique in deep mining, which aims to prevent, reduce the frequency, or manipulate the timing of violent, stress-driven rock mass instability at

    Nov 29, 2022

  • CIM
    Design, Implementation, and Commissioning of the Gibraltar Development Plan 3

    By S. A. H Tyrrell, R. Rotzinger

    "Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G

    Jan 1, 2014

  • DFI
    Design, Installation And Performance Of Earth Retention System To Limit Ground Movements Around Sensitive Structures In Washington, Dc

    By Douglas R. Hardin, Stanley L. Worst, Joanna Mason

    A challenging earth retention project presented itself in Washington, DC in the backyard of the historic House of the Temple (The Scottish Rite of Freemasonry, Supreme Council 33°). Located at 15th St

    Oct 1, 2022

  • DFI
    Design, Installation, and Testing of Hollow Bar Tiebacks Used as Excavation Support

    By Marco D. Boscardin, Kenneth A. Pidgeon, Adriane G. Boscardin

    "Hollow bar tiebacks can offer an economical alternative to conventional solid bar and strand tieback systems for use in temporary excavation support construction. However, the limitations associated

    Jan 1, 2016

  • AUSIMM
    Design, Installation, Commissioning and Operation of Fine Grinding Technology at the Kevitsa Mine

    By B Nielsen, H Lehto, B Musuku

    "The demand for fine and ultra-fine grinding associated with the processing of more challenging, finer grained orebodies and the global driver of minimising energy consumption has been an increased fo

    Oct 10, 2016