Search Documents

Sort by

  • SME
    Design Considerations For Subsidence Control

    By M. Karmis

    Subsidence planning and control must be an integral part of mine design in order to minimize the economic impact of underground mining on the surface. Pre-calculation of surface deformations which may

    Jan 1, 1990

  • DFI
    Design Considerations For Underground Subway Station - Introduction

    By Mohammed Z. Islam

    As cities are growing all over the world, the need for urban transportation facilities are on the rise. Designers (of these facilities) today are faced with a number of constraints for their design, o

    Jan 1, 1993

  • TMS
    Design Construction and Commissioning of the Nchanga Tailing Leach Plant

    By J. A. Holmes

    Due to varying and complex mineralogy, the flotation tailings from the Chingola Concentrator have, for some years, contained upwards of 0.4% acid soluble copper. In 1968, an investigation was initiate

    Jan 1, 1976

  • SME
    Design Criteria For In-Situ Mining Of Hard Rock Ore Deposits - 1.0 Introduction

    By C. R. McKee

    In-situ mining of hard rock deposits will only become successful as we understand the engineering parameters involved and the design limitations they impose. As recognized by Wadsworth1 the most criti

    Jan 1, 1981

  • SME
    Design Criteria Of Mined Land Reclamation

    By Charles V. Riley

    While the late 1960's are known as the years of the public recognition of impending environmental crises, the 1970's will be known as the decade of public concern for improving the quality

    Jan 1, 1972

  • SME
    Design Criteria: The Formal Basis of Design

    By John W. Scott

    INTRODUCTION The design criteria for a particular concentration and dewatering project will provide the formal basis for design of the process, equipment and facilities. These criteria will specif

    Jan 1, 1986

  • DFI
    Design Development & Installation Of Glass Fibre Reinforced Polymer (GRP) "Soft Eyes" In Diaphragm Wall Reinforcement Cages.

    By Paul M. Wiltcher

    This paper discusses how benefits in engineering design can be achieved from combining existing GRP concrete design guidelines with carbon steel design codes primarily made possible due to the increas

    Jan 1, 2006

  • SME
    Design Development of the Brushy Creek Regional Utility Authority Phase 2 Raw Water Delivery System Project - RETC2021

    By Aaron Archer, James Parkes

    This paper presents design considerations for the major underground elements of the pending BCRUA Phase 2 Raw Water Delivery System Project. These elements include two Lake Taps; an 8,800 LF, minimum

    Jun 13, 2021

  • SME
    Design Development of the I-35 Capital Express Central Drainage Tunnels - NAT2024

    By Joseph Goessling, Mark Kroncke, James Parkes

    The I-35 Capital Expressway (CapEx) Central Drainage Tunnels will serve as a stormwater collection system for the forthcoming I-35 Capital Express Central reconstruction project through downtown Austi

    Jun 23, 2024

  • SME
    Design Diagrams for Estimating Tunnel Face Stand-Up Time in Water-Bearing Ground

    By R. Schuerch, G. Anagnostou, R. Poggiati

    "The paper presents dimensionless design diagrams for estimating the stand-up time of a tunnel face in saturated ground of medium-low permeability. The diagrams cover a wide range of ground parameters

    Jan 1, 2016

  • AIME
    Design Examples of Open Pit Slopes Susceptible to Toppling

    By Alan F. Stewart, Douglas R. Piteau, Dennis C. Martin

    Three examples of open pits where toppling failure controls the stability and design of the slopes are described. Two examples involve the design of overall slopes in base metal mines. The third examp

    Jan 1, 1983

  • DFI
    Design for Installation of Suction Piles in Sand Deposits for Mooring of Floating Offshore Structures

    By Chul Soo Park, Juhyung Lee, Duhyun Baek

    "In this study the preliminary design of suction pile as the supporting system of the concrete floating structures was performed at the offshore pilot project area in Korea. The suction pile of the fl

    Jan 1, 2017

  • CIM
    Design for Safety

    By Philip J. Bangerter, Chris Twigge-Molecey

    Design for safety is critical to metallurgical plants, due to the inherently dangerous nature of their processes. Two significant areas of concern are: 1. preventing catastrophic process failures that

    Jan 1, 2015

  • SME
    Design for the Bolted and Gasketed Segment Lining for the Bypass Tunnel with High Head Conditions

    By Paolo M. Brion, Z. Bade Sozer

    "The Bypass Tunnel has high head conditions ranging from a minimum of 600 feet (183 m) under the Hudson River to a maximum of 875 feet (267 m) on the west side. The ground cover ranges from 425 feet t

    Jan 1, 2016

  • AUSIMM
    Design for Tunnel Fire Life Safety – Working Together in the New Zealand Context

    By E Claridge

    There are a number of major infrastructure tunnelling projects currently underway or proposed in New Zealand, including construction of new road and rail facilities and the refurbishment of existing r

    Mar 8, 2011

  • CIM
    Design Guidelines for Permanent Tunnel Plugs

    By Brennan Lang

    Why Seal Tunnels? ?Restore groundwater levels to pre-mining conditions. ?Saturate rock mass to reduce acid rock drainage. ?Reduce discharge flow to the environment. ?Reduce or regulate flows to a

    May 1, 2002

  • AUSIMM
    Design Investigations for a Steel Lined Pressure Tunnel in the King River Power Development, Tasmania

    The King River Power Development on the West Coast of Tasmania has involved the storage of the waters of the King River in the new Lake Burbury and their diversion through a 7 km tunnel to a 144 MW po

    Jan 1, 1993

  • DFI
    Design Issues for Mini-Caissons in the NYC Area

    By Caciola Jr. Joseph J., Nidal M. AbiSaab

    "Thanks in great part to the geology of the New York City Metropolitan area, mini-caissons are a popular choice for deep foundations. These drilled elements are readily available, easy to install with

    Jan 1, 2016

  • CIM
    Design Methodology for Large Underground Powerplants

    By R. Plassart, F. Laigle

    "As a powerhouse, a transformer or a valve chamber, large underground caverns are a major element of hydropower plant. On the contrary to galleries and shafts which are linear and long underground str

    Jan 1, 2015

  • DFI
    Design Methodology for Multi-Facetted, Winged Steel Foundations

    By Phillip E. Glogowski, N. Catherine Bazan-Arias

    Steel foundations can be designed to cross-sectional configurations ranging from triangular and square to other multi-side shapes. Adding lateral extensions (hereby called wings) along the length of t

    Sep 8, 2021