Search Documents

Sort by

  • SAIMM
    A Holistic Approach To Control And Optimization Of A PGM Concentrate Flash Drying Unit ? Synopsis

    By D. J. de Clerk

    Global trends stipulate the need to optimize existing assets while reducing environmental impacts. This paper illustrates the procedure that was followed to achieve such goals at one of the coal burni

    Jan 1, 2012

  • ISEE
    A Holistic Approach to Developing a Narrow Cutback at an Open Cut Copper Mine

    By Stephen Mansfield, Nathan West, El Khalil Seyed

    In October 2017, a multi-bench failure occurred in the east wall of the Guelb Moghrein copper and gold mine in Mauritania. The failure extended 100 m (328 ft) vertically and horizontally and resulted

    Jan 21, 2025

  • AUSIMM
    A Holistic Approach to Managing Blast Outcomes

    By D Genge, E Martin, T Goswami, M Rothery

    Rio Tinto’s Hunter Valley Operations is a large open pit coalmine situated in the heart of the Hunter Valley in Australia. The Riverview West Pit has faced increasing production challenges in recent t

    Aug 24, 2015

  • ISEE
    A Holistic Approach to the Drill and Blast Process

    By Tom BoBo, Seth Gering, Jeff Loeb

    Presenting a D&B feedback loop built on a well-designed blast, proven fragmentation analysis and blast monitoring solutions, underpinned by technology that not only increases profit from every blast,

    Feb 1, 2020

  • SME
    A Holistic Assessment Of Slope Stability Analysis In Mining Applications - Introduction - Preprint 09-046

    By K. Sample

    Slope stability analysis plays an integral role in the design of various mining applications including waste dumps, heap leach piles, solution ponds, and tailings dams. Generally, limit equilibrium an

    Jan 1, 2009

  • SME-ICGCM
    A Holistic Examination of the Geotechnical Design of Longwall Shields and Associated Mining Risks

    By Russell C. Frith

    This paper examines the design of longwall shields, focusing on those aspects that are critical to either their successful application or contribution to failure during longwall extraction. In many i

    Jan 1, 2013

  • AUSIMM
    A Holistic Viewpoint for Selecting the Vertical Haulage System – Shafts and Conveyors

    By R M. Krek

    The haulage system used to convey ore from an underground mine to a surface stockpile at the mine process plant is a vital component of the mine’s overall infrastructure and economic viability. The sy

    Mar 24, 2014

  • SME
    A Holistic Vision for a Systems Approach to Resource Governance - SME Annual Meeting 2024

    By H Arvidson, Rondinelli Sousa, Nic Pollock, Cesar Carrasco, Boz Elloy

    Global public mineral reporting codes have driven strong governance of public disclosures of minerals information. Recently, we have seen an increase in disclosure of information related to Environmen

    Feb 1, 2024

  • CIM
    A Human Body Posture Sensor for Monitoring and Diagnosing MSD Risk Factors

    By A. Alwasel

    Musculoskeletal disorders (MSDs) threaten the wellbeing and livelihood of a large number of construction workers incurring a significant cost to society. We present a new method to monitor and diagnos

    Aug 1, 2013

  • NIOSH
    A Human Component To Consider In Your Emergency Management Plans: The Critical Incident Stress Factor

    By Kathleen Madland Kowalski

    In recent years the issue of human stress response in emergency workers has begun to receive attention. This paper presents a rationale for considering human stress as a significant factor in the mana

  • NIOSH
    A human component to consider in your emergency management plans: the critical incident stress factor

    By Kathleen Madland Kowalski

    In recent years the issue of human stress response in emergency workers has begun to receive attention. This paper presents a rationale for considering human stress as a significant factor in the mana

    Aug 1, 1998

  • AUSIMM
    A Hybrid Life Cycle Assessment and Geographical Information System Model for Sustainable Recycled Aggregate Chain Management in Turin (Italy)

    By E Garbarino, P Molina, V Badino

    Given the ever increasing quantity of construction and demolition waste (C&DW), one of the most challenging issues presently facing policymakers and public administrators in Italy concerns how to

    Jan 1, 2009

  • SAIMM
    A Hybrid Location Methodology

    By S. M. Spottiswoode

    The aim of the hybrid location method is to improve seismic event locations by reducing the effects of errors in the wave velocity of ray paths between each event and each recording site. We report on

    Jan 1, 2005

  • SME
    A Hydrocyclone Demonstration System For The Recovery Of Coal From GOB

    By P. K. Davis

    The results of a previous basic study of the flow and design characteristics of the hydrocyclone has shown that a recovery as high as 99% with a product rating of 0.95 can be achieved on a "batch?2 ba

    Jan 1, 1989

  • SME
    A Hydrometallurgical Process For Beryllium Recovery From Spors Mountain Ores, Utah

    By J. K. Grunig

    A process consisting of leach, continuous countercurrent decantation, resin-in-column ion exchange, evaporative crystallization of beryllium sulfate, and decomposition of the sulfate was developed for

    Jan 1, 1982

  • TMS
    A Hydrometallurgical Process For Recovery Of Vanadium And Molybdenum From Wasted Catalysts For Hy-Drotreating Desulfurization Of Heavy Oil

    By Toshiaki Akahoshi

    Keywords: Wasted catalyst, Hydrodesulfurization, Ammonium vanadate, Ammonium molyb-date, Hydrometallurgical process. The fundamental reactions have been investigated in order to develop a hydrometa

    Jan 1, 2005

  • SME
    A Jouney to Zero Harm; Montana Resources Sets the Standard in Mine Safety

    By William Gleason

    "It has been more than 10 years since Montana Resources’ copper/molybdenum mine has had a lost-time injury at its site in Butte, MT. With more than 350 employees and an average production of about 15.

    Oct 1, 2019

  • ISEE
    A Kinematic Approach for Blast Modeling

    By Ruilin Yang

    Kinematic approach of blast modeling refers to using the velocity, strain, or displacement as controlling parameters to model blasting, rather than the stress and the material constitutive relations.

    Feb 1, 2020

  • SME
    A Kinematic Approach For Blast Modeling - SME Annual Meeting 2022

    By R. Yang

    This paper presents a kinematic approach for blast modeling with examples of blast models that were developed previously. A kinematic approach was applied successfully in developing blasting models th

    Mar 2, 2022

  • SME
    A Kinetic Model For Dissolution Of Metals - The Role Of Heterogeneous Reaction And Mass Transfer

    A kinetic model for leaching of various metals with different lixiviants in a batch system has been developed. Material balances for reactants and products at the solid/liquid interface were formulate

    Jan 1, 1992