Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Continuous Dust Monitoring For Improved Worker Protection
By J. H. Daniel
Dust-related respiratory disease remains the major health concern in mining, and health agencies are proposing more stringent standards. The U.S. Bureau of Mines (USBM) is investigating techniques to
Jan 1, 1995
-
Continuous Evolution of Porcupine Joint Venture (PJV) Dome Mine's Effluent Treatment Plant
By T. Y. Chong, J. A. Folinsbee
Since milling began in 1909, the PJV Dome mill has been expanded several times, to the current throughput of 11,500 tonnes per day. PJV recovers free gold using crushing and grinding followed by gravi
Jan 1, 2005
-
Continuous Flight Auger Piles In The Blue Ridge: A Case Study Using Instrumentation In Pile Design
By Jesse R. Jacobson
A large casino complex in Cherokee, North Carolina recently underwent a $633 million expansion that involved substantial foundation challenges. The site is located in a valley on the southern edge of
Jan 1, 2011
-
Continuous Grouting In Embedding Of Sheet Piles
By Jouko L. Lehtonen
Sheet pile walls can be sealed watertightly using various methods. The objective of this paper is to introduce a new innovation comprising the use of continuous cement grouting during embedding. The m
Jan 1, 2006
-
Continuous High Gradient Magnetic Separation Pilot Plant: Machine Description And Mineral Processing Results
By Bo Arvidson
SALA MAGNETICS, INC. is now operating a 15 tph continuous high gradient magnetic separator, the SALA-HGMS® Mark III Carousel, as part of a complete mineral processing pilot plant installed at Sala&apo
Jan 1, 1976
-
Continuous Improvement And Teamwork Are The Keys To Success At Phoenix Mine
By Scott Ellenbecker
The formation in Newmont Mining?s Phoenix Mine near Battle Mountain, NV contains high levels of abrasive quartzite as well as gold, copper and silver. Newmont started mining operations at Phoenix (for
Jan 1, 2009
-
Continuous Improvement Initiatives at the Newmont Ghana Gold Limited Ahafo Gold Mine
By J. van Huyssteen, M. Cantor
Newmont Ghana Gold Limited's Ahafo Operation has matured from its project ramp up stage into steady state operations after three years of operation. Management focus has shifted from addressing c
Jan 1, 2011
-
Continuous Improvement of the Return Air Raise Silencer System at Totten Mine
By Andrew Dobson, Cheryl Allen, Enrique Acuña
"Totten Mine return air raise was designed with two parallel fans equipped with silencers to reduce the noise emitted from the outlets into the environment. As development and production of the mine p
Jan 1, 2019
-
Continuous Improvements In Mine Ventilation And Fire Simulation
By Rudolf E. Greuer
Modeling a mine ventilation system is a formidable mathematical problem requiring the solution of twice as many equations as there are airways with half of these being quadratic equations. The additio
Jan 1, 1994
-
Continuous Improvements of Porcupine Joint Venture (PJV) Dome Mine's Gravity Circuit
By T. Y. Chong, J. A. Folinsbee, M. Fullam
PJV Dome Mine has used some form of gravity concentration since start of milling operation in 1909 to recover free milling gold. Amalgamation and conventional jigs were first used and were replaced wi
Jan 1, 2005
-
Continuous loading at Brunswick Mining
By J. Jerome MacDonald, Stephen B. Flewelling
"In the base metals industry of today, operations required to continuously improve productivity and reduce unit production costs. Consistent with these goals is the improvement of the muck haulage cyc
Jan 1, 1989
-
Continuous Measurement Of Working Level Exposure Of Uranium Miners ? Objective
Continuously monitor air-borne radon daughters that are a hazard to underground miners. Approach A beta detector continuously counts beta activity collected on a filter paper to allow calculatio
Jan 1, 1979
-
Continuous Miners With Integral Roof Bolters
By Tedd B. Bodimer
Why complicate an already complex machine such as a continuous miner by adding roof drills? Immediate permanent roof support is an immediate thought of the mining engineer just as elimination of frequ
Jan 1, 1981
-
Continuous Mining - A pilot study of the role of visual attention locations and work position in underground coal mines
By John R. Bartels
Jan 1, 2009
-
Continuous Mining Dust Levels in 20-Foot Cuts With and Without a Scrubber Operating
Flooded-bed scrubbers on continuous miners have been shown to be an effective respirable dust control technology, traditionally used during the extraction of extended cuts of up to 12.2 m (40 ft). To
Feb 23, 2014
-
Continuous Monitoring Of Natural Ventilation Pressure At The Waste Isolation Pilot Plant
By Ian M. Loomis, Keith G. Wallace
The Waste Isolation Pilot Plant (WIPP) is a U.S. Department of Energy research and development facility designed to demonstrate the permanent, safe disposal of U.S. defense-generated transuranic waste
Jan 1, 1993
-
Continuous Monitoring Techniques for Environmental Control of Waste Water Discharge at Northern Territory Mine Sites
By Mine F. J, Woods P. H
The Top End of the Northern Territory lies in the monsoonal zone and receives rain during the November-April period. Initially, at the start of the wet season, rain storms are localised, but, follow
Jan 1, 1994
-
Continuous Personal Dust Monitor Accuracy Testing 6/23/08 ? Introduction
New Continuous Personal Dust Monitors (CPDM) submitted to NIOSH for approval to sample coal mine dust must accurately measure respirable coal mine dust in mine environments. There are two steps in the
Jan 1, 2009
-
Continuous Pilot Scale Testing Of Column Flotation For Recovery Of Fine Coal (Preprint 90-153)
By J. G. Groppo
A series of performance studies have been conducted using counter-current column flotation to recover a marketable clean coal product from existing preparation plant fine waste streams. The test work
Jan 1, 1990
-
Continuous pilot-scale testing of column flotation for recovery of fine coal
By J. G. Groppo, B. K. Parekh
A series of performance studies were conducted using countercurrent column flotation to recover a marketable clean coal product from existing preparation plant fine waste streams. The test work was co
Jan 1, 1991