    Considerations In Sample Preparation Methods For Cyanide Shake Assay Of Gold: A Case Study Of Laboratory Optimization At The Aurora Partnership -Aurora Project

    By W. M. Colwell

    When it comes to the analysis of gold bearing ore, there are literally dozens of variables that contribute to the final "true value" of a given sample. Initial sample selection, splitting size and met

    Jan 1, 1993

  • AUSIMM
    Considerations on Quality Assurance/Quality Control and Sample Security

    By G Gosson

    An important requirement in every geological quality control program is that the identity and grades of the control samples (duplicates, certified reference materials (CRMs), and blanks) must remain æ

    Jan 1, 2008

  • SME
    Considerations On The Selection Of A System Of Long Distance Transport By Conveyor Belt ? Introduction

    By J. M. Rios

    This paper exposes the reasons that led the Empresa Nacional Minera del Sahara, S.A. (ENMINSA) to the selection of a conveyor belt system for the transport of phosphate rock over a distance of 100 kil

    Jan 1, 1968

  • SME
    Considerations Regarding Sustainable Development in the Vietnamese Coal Mining Industry

    By Naoko Shimazaki, Andre Xavier

    Over 10 million tourists have visited Vietnam in 2016. Travel and tourism accounted for 9.3% of the country’s Gross Domestic Product (GDP) in 2014. At the same time, as with many other resource-rich d

    Jan 1, 2017

  • CIM
    Considerations regarding the definition of remotely located integrated cogeneration plants. Part 1

    By D. Berkley

    "The competitive pressure, the increasing energy costs and the environmental regulations impose substantial challenges to the definition of power plants serving industrial facilities. Primary mining a

    Jan 1, 2003

  • CIM
    Considerations regarding the definition of remotely located integrated cogeneration plants. Part 2

    By D. Berkley

    The competitive pressure, the increasing energy costs and the environmental regulations impose substantial challenges to the definition of power plants serving industrial facilities. Primary mining an

    Mar 1, 2003

  • SAIMM
    Considering the action of degrading water quality on the electrochemical response of sulphide minerals, N. Ndamase, M. Tadie, and K.C. Corin

    By K. C. Corin, M. Tadie, N. Ndamase

    Fresh water conservation efforts and strict environmental regulations have forced the mining industry to reduce freshwater consumption and effluent discharge. This is achieved by recycling process wat

    Jan 1, 2020

  • AUSIMM
    Considering the action of water quality on the electrochemical response of Galena

    By K C. Corin, N Ndamase, M Tadie

    Mining operations in arid regions are compelled to reduce their consumption of fresh water. Closed water circuits are an attractive solution and, in addition to reducing freshwater consumption, have t

    Aug 24, 2022

  • SAIMM
    Considering the impact of water quality on flotation response, K.C. Corin and M.S. Manono

    By K. C. Corin, M. S. Manono

    The drive to reduce water usage globally has led to the mining industry reassessing its water usage - owing to past environmental degradation due to effluent discharge, tailings disposal and process w

    Jan 1, 2020

  • SME
    Consol's Bailey Mine Complex: Avoiding Permitting And Compliance Problems Through Proper Planning And Design ? Introduction

    By Jonathan M. Pachter

    The Bailey mining complex is located in Greene County, PA in the valley of Talley Run, a small stream tributary to the Enlow Fork of Wheeling Creek as shown on the location map insert found on Figure

    Jan 1, 1985

  • SAIMM
    Consolidated Backfill At O'Okiep Copper Company

    By J .. F. Brownrigg

    In the mining method used at O'Okiep Copper Company (OCC), vertical crater retreat, the prime requirement for the fill is that it should be sufficiently strong to be free-standing to a height of

    Jan 1, 1988

  • TMS
    Consolidation and Annealing Studies of Rapidly Solidified 304 Stainless Steel

    By Jong-Jip Kim, J. G. Byrne, W. Kim, In-Ok Shim, John E. Flinn

    "Two rapid solidification processes for 304 stainless steel were studied: centrifugal atomization (CA) in a helium atmosphere and atomization by exposing argon-containing melt to vacuum (VGA). Positro

    Jan 1, 1988

  • AUSIMM
    Consolidation and shear strength testing and stability analysis of coal mine spoil degraded to mud

    By L Bergin, D J. Williams, S Islam, T A. Vangsness

    The flooding of open strip coal mines in the Bowen Basin and Hunter Valley Coalfields of Eastern Australia has the potential to soften the spoil and floor materials to produce “mud”. This mud can act

    Jul 23, 2018

  • CIM
    Constancia Project Process Plant Design and Start Up

    By David Stephenson, Hugo Granados, Steven Klohn

    "HudBay’s Constancia project is a copper molybdenum concentrator located in southern Peru. In 2010 Ausenco was contracted to perform a feasibility study optimization review which resulted in an improv

    Jan 1, 2016

  • TMS
    Constant Permeability of Fe-B-Si-Nb Crystal-Glassy Composite Bulk Alloy by B2O 3 Flux Melting and Casting

    By Teruo Bitoh, Shogo Izumi

    "The effect of B203 flux melting on the structure and the soft magnetic properties of the (Feo.1sBo.20Sio.os)96Nb4 bulk metallic glasses prepared by casting has been investigated. The ringshaped bulk

    Jan 1, 2013

  • SME
    Constant Torque Results Of A Medium Voltage Afd Using Output Transformer - SME Annual Meeting 2022

    By T. A. Farr, I. A. Gibbs, F. Guevara, S. R. Simms, G. Nojima

    This paper describes an installation of a medium-voltage adjustable frequency motor drive (AFD) on a high starting torque regrinding mill. This type of application is typically found in the mineral in

    Mar 2, 2022

  • SME
    Constraints To The Use Of Coal Ash In Eastern Coal Mines

    By T. A. Gray

    There are several potential large-volume uses for coal ash in mining-related applications that could be environmentally and economically beneficial to mining companies. Actual usage, however, may be c

    Jan 1, 1995

  • CIM
    Constructability Challenges for Perimeter Control Blasting and Slope Development in Shale and Other “Weak” Rocks

    By D. J. Scarpato

    "Slope construction in shale can present some interesting challenges for geotechnical design engineers and contractors alike. There are challenges that can be expected and designed-for; however, all t

    Jan 1, 2015

  • CIM
    Constructed Wetlands that Emphasize Sulfate Reduction: A Staged Design Process and Operation In Cold Climates

    By T. R. Wildeman

    "At the Big Five wetland, which was built to treat drainage from a metal mine, encouraging results have attributed to sulfate reduction. Cu and Zn were reduced to below detection limits of 0.50 mg/L,

    Jan 1, 1992

  • SME
    Constructing A Project In Mexico

    By K. A. McDonald

    This paper will describe the experiences of Hibernia Holdings, Inc. in constructing a mineral processing facility in Mexico. It will attempt to set forth a guideline on what companies attempting to op