Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
BHP Billiton Iron Ore Car Dumper 4 - Temporary Works
By D Ford
BHP BillitonÆs new rotary iron ore car dumper installation at Finucane Island (Port Hedland) was constructed to increase the total capacity of the port facility from 110 Mtpa to 120 Mtpa and to allow
Jan 1, 2007
-
BHP Billiton Underground Ground Control Fatal Risk Control Protocol ? Development and Application
By Dan Payne
Roof falls and other ground control incidents make up a significant portion of fatal accidents in underground mines. BHP Billiton has undergone a review of all fatalities in their operations and divid
Jan 1, 2006
-
BHP Diamonds Inc. - Ekati Diamond Mine
By Jim Excell, Jim Rothwell, Mike Rylati
"LocationThe Ekati Diamond mine is located at Lac de Gras, Northwest Territories.Brief Description of OperationBHP Diamonds Inc. has developed Canada's first diamond mine in the Northwest Territories
Jan 1, 2000
-
BHP Iron Ore Protocol for Mine Closure
By Hillis R
As part of BHP Iron Ore's policy and goal of achieving a high standard of environmental management within its operations, a protocol for mine closure has evolved. The need to demonstrate sound
Jan 1, 1996
-
BHP Iron Ore Pty Ltd Protocol for Mine Closure Goldsworthy, Western Australia
Background BHP Iron Ore Pty Ltd is one of the major iron ore producers in the Pilbara Region of North Western Australia. The company manages three separate joint ventures; the Newman, Goldsworthy a
Jan 1, 1994
-
BHP Port Hedland wind fence – innovations in dust control
By R Peiffer, L van Wyk
The Port of Port Hedland is the largest bulk export terminal in the world and is one of Australia’s most important pieces of economic infrastructure. BHP is the largest Port user to support the export
Sep 18, 2023
-
Bi-directional Load Testing Using Donut Super Cells For Hangzhou West Railway Station
By Antonio Marinucci, Robin Mao
The new Hangzhou West Railway Station, which is currently in the early stages of construction, will be located in the city of Hangzhou, China. To accomplish the ambitious goals of the project, the con
-
Bi-Directional Testing Using Super Cells for the Jiaxing-Shaoxing River Crossing Bridge
By Diane Reid, Antonio Marinucci, Robin Mao
Super Cells are an innovative, open-shaped bi-directional static load testing device used to promote concrete flow during placement while utilizing greater cross-sectional area of the pile to achieve
Jan 1, 2019
-
Bibliography of Canadian Contributions in the Field of Rock Mechanics
By F. L. Casey
"Part 1 – Published Papers Baria, G., and Boshkov, S., ""Insights into Undercuttingin Block Caving"", Proc. 5th Rock Mech. Symp.,Mines Br. - Information Canada, 41-58, 1970.Barron, K., Coates, D. F.,
Jan 1, 1971
-
Bibliography Of Petroleum And Allied Substances 1922 And 1923 - Introduction
By H. Britton
This bulletin is the seventh in the series of petroleum bibliographies published by the Bureau of Mines, Bulletins 149, 165, 180, 189, 216, and 220 being compilations for the years 1915, 1916, 1917, 1
Jan 1, 1929
-
Bibliography Of Pressure Hydrogenation (In Three Parts) I. Review And Compilation Of The, Literature On The Pressure Hydrogenation Of Liquid And Solid Carbonaceous Materials - Introduction
By J. L. Wiley
THIS REVIEW contains abstracts of the technical literature and patents dealing with the history, development, and commercial application of the Bergius and related processes for the hydrogenation, und
Jan 1, 1950
-
Big Bell Coming Back for Seconds, Thirds and Fourths
In October 1993 it was decided to undertake the fourth phase of mining at Big Bell. This decision followed the exhaustion of open pit reserves in January 1993. Two stages of mining were proposed for t
Jan 1, 1998
-
Big data and the IoT platform architecture design for the mining industry APCOM 2021
By H. Dudycz, A. Skoczylas, P. Stefaniak, P. Pyda
In the era of Industry 4.0, technologies such as Big Data (BD) and the Internet of Things (IoT) play a key role, especially for multi-site manufacturing companies. In such companies, the challenge is
Sep 1, 2021
-
Big Data in Design-Build: Hampton Roads Bridge-Tunnel Expansion Supplemental Site Investigation - NAT2024
By Martha Gross, Amanda Wachenfeld, Brian Keaney, Jean-Michel Charpentier, Frank Perrone
The Hampton Roads Bridge-Tunnel (HRBT) Expansion widens the existing four-lane bridgetunnel corridor to eight lanes through construction of two parallel tunnels, interstate widening, and bridge expans
Jun 23, 2024
-
Big Hole Drilling -- The State Of The Art
By M. D. Lackey
The "Art" of Big Hole Drilling has been in a continual state of evolution at the Nevada Test Site since the start of underground testing in 1961. Emplacement holes for nuclear devices are still being
Jan 1, 1983
-
BIM for Conventional Tunneling: The Sotra Link Project in Norway - NAT2024
By Andrea Biagi, Elisa Comis, Gianluca Bella, Enrico De Panicis, Guido Barbieri, Matteo Giani
The Sotra Link Project is a major infrastructure project in Norway involving the design, construction, financing and maintenance of several underground and surface structures between Sotra island and
Jun 23, 2024
-
Binacional Hydro Power Plant Thrust Bearing Design Optimization For Higher Efficiency
By Piotr Pajaczkowski
Hydro generators installed in Itaipu Binacional power plant with 824/737 MVA rated output power (50/60 Hz) belong to the largest ones in the world. Among many unique features the generators are equipp
Jul 31, 2018
-
Binding of Bisbenzylisoquinoline Alkaloids to Phosphatidycholine Vesicles and Alveolar Macrophages: Relationship between Binding Affinity and Antifibrogenic Potential of these Drugs
By Vincent Castranova, Jane Y. C. Ma, Joseph K. H. Ma, Chang-geng Mo, Carl J. Malanga
"A group of bisbenzylisoouinoline alkaloids has been shown to exhibit various degrees of effectiveness in preventing silica-induced fibrosis in animal models [1, 2]. The objective the present study wa
Mar 1, 1992
-
Bingham Canyon Mine – from adversity to excellence
By M Robotham
In April 2013, Rio Tinto Kennecott Copper’s (RTKC) Bingham Canyon mine experienced what is arguably the world’s largest ever in-pit slope failure. The failure initiated along a major, continuous, low-
Nov 30, 2018
-
Bingham Canyon Mine-Blasting Through and Next to Active Underground
By Robert Cefalo
Drill and Blast Engineer Abstract In 2019, the Bingham Canyon Mine, owned by Rio Tinto Kennecott Utah Copper Company, mined through the active underground that dewaters the pit. The active underground