Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Journal: You Be the Judge - A Study on Ethics (789e5c3c-8c01-4005-9710-845a93dd4cf9)

    In the March/April 2006 issue of the Journal, we published an ethical dilemma called “Blowing the Whistle.” We received many interesting responses to the article as requested. Some of the responses ar

    Jan 1, 2007

  • ISEE
    Highly Accurate Concrete Pile Cropping

    By Alain Duchesne, Dominique Fonfrede, Alan Broca

    The technique involves the removal, in one piece, of an unwanted concrete pile section, exploiting the principle of crack propagation induced using gas pressure. The device, or pod, is made of a conta

    Jan 1, 2012

  • ISEE
    Safety Talk - Training If It's Worth The Time, It's Worht Documenting

    By Ann Barron, Paul Downing

    Those employed in the explosives industry must have a keen familiarity of the explosives products they handle, the safety pro c e d u res they must follow, and the increasing number of laws and regula

    Jan 1, 2004

  • ISEE
    Ontario Hydra T.G.S. Chimney Demolition Thunder Bay, Ontario, Canada

    By Ray Jambakhsh, Gabrielle Bourget

    In the summer of 1998, Ontario Hydro awarded a contract to demolish an obsolete and inefficient chimney by blasting. The Ontario Hydro Thunder Bay Thermal Generating Station (T.G.S.), is a fully opera

    Jan 1, 2000

  • ISEE
    Urban Tunneling for the MWRA's Boston Harbor Clean Up

    By Gordon C. Petersen, Gary A. Almeraris

    This paper describes the controlled blasting techniques required to mine a rock tunnel section of a main interceptor located in the Boston Metropolitan area. The 3m (10 ft) x 2.8m (9.25 ft) horseshoe

    Jan 1, 1991

  • ISEE
    Drill and Blast Digitalization

    By Ricardo Dr. Chavez, Mathieu Lachamp, Rob Dr. Farnfield

    Pueblo Viejo is an open pit gold mine in the Dominican Republic which is always looking forward to implement the newest technology in the industry to improve all processes. Focusing on one of the pill

    Jan 1, 2019

  • ISEE
    Blasting soft, plastic mineral inside a silo at a copper mine

    By Benjamin Cebrian

    Metallurgical testing at Cobre Las Cruces prior to production at the mill was done with overburden gossan. Some of that test gossan was a very fine material, wet by the water conditions at the bottom

    Jan 1, 2010

  • ISEE
    Study of Vibrations in Far and Near Field to Determine the Technical Feasibility of Massive Blasting.

    By Raúl Mondaca Aracena

    Mantoverde mine requires increasing its production level to double. EMTS - Projects performs far and near field vibration studies to make changes to the D&B design and sequences, in order to equalize

    Feb 1, 2020

  • ISEE
    Signature Hole Analysis and Vibration Modeling: An Indonesian Case Study

    By Wawa Jaka Sungkawa, Slamet Rachman Jaka, Tom Dermody

    A project was undertaken to research and develop a method to confidently predict vibration. It was decided that the scaled distance formulas were not adequate to predict vibration when using non-elect

    Feb 1, 2020

  • ISEE
    Shotrock Fragmentation Improve in Complex Lithology Condition

    By M. Syafiq Isnaya, Rahma Norfaeda, Slamet Rachman Jaka

    This paper is about project improvement to maximize energy distribution while ensuring beneficial blast results (reduce boulder condition). The main problem is how to manage complex lithology conditio

    Feb 1, 2020

  • ISEE
    Determination of Blast Vibration Limits by Direct Strain Measurement

    By Adrian Moore, Alan Richards, Andrew Brodbeck

    Structural blast vibration limits should be based on the strength of the structure, the stress induced by blasting, and a responsible factor of safety. In this paper a methodology that uses direct str

    Feb 1, 2020

  • ISEE
    Improving stope productivity with wireless initiation.

    By Luan Monteiro, Francisco Biulchi

    The AngloGold Ashanti - Cuiaba mine sought innovative approaches to minimize lateral development and stope extraction time while maintaining optimal gold recovery and minimizing dilution. The stope 8G

    Jan 21, 2025

  • ISEE
    Monitoring Concrete Block Damage at the Fultondale School

    By John Babcock, Gregory Poole, Ron Hudson

    In January 2007, Fultondale Alabama opened a new elementary school. Site work at the old school location included blasting activities and the old school building was scheduled for demolition. With hel

    Jan 1, 2009

  • ISEE
    Efficient Blasting for Bench Stability and Fragmentation Results Improvement

    By Javier Illanes Pizarro, Gustavo Huerta Valer, Jorge Cárdenas Miranda

    Bench stability is the basis of sustainability in an open pit mining operation. Taking care of the pit walls while maintaining fragmentation results can prove a challenge. In this study, technical pro

    Feb 6, 2023

  • ISEE
    An Unusual Accident Re-created

    By James Stuart

    A man died when the primed charge he was holding against his chest exploded. He was doing legitimate explosive work, and he was following all the safety procedures he had been taught. He and his colle

    Jan 1, 2007

  • ISEE
    Blasting Overhangs Close to a Vibration Sensitive Structure

    By R. Franfield

    This paper describes a situation that many drilling and blasting contractors have found themselves in – a client?s fear of the use of explosives. In the summer of 2007 Blasting Services Ltd was asked

    Jan 1, 2009

  • ISEE
    The Testing of Structures and Structure-combinations to be Applied as Explosive-proof Enclosure

    By C. Heiss, A. Hofmann

    Due to an explosion in an Austrian steel works during the basic oxygen process, the Chair of Mining Engineering and Mineral Economics at the Montanuniversitaet Leoben was assigned with the set-up of a

    Jan 1, 2012

  • ISEE
    Danger Tree Blasting In BC

    By Dave Weymer

    Falling timber in BC has always been a hazardous job. Huge, often rotting trees and steep, rugged terrain combine to create difficult and dangerous conditions. Death and injury rates are among the hig

    Jan 1, 2013

  • ISEE
    Moving 50’(15.3m) of Burden with a 4½” (115mm) Hole

    By Keith Henderson

    An open pit quarry operation in West Central Illinois provided a challenging proposition regarding the removal of a rock wall that once separated two pits, but was now in the middle of the north wall

    Jan 1, 2012

  • ISEE
    S-Load Cartridge

    By Marco Larghi, Jurg Knobel, Braden Schmidt

    Remote Avalanche Control Systems (RACS) which uses solid explosives has been used in Europe since 1996 and North America since 1999. With large destructive avalanches in transportation corridors, vari

    Feb 1, 2020