Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Arctic Emergency Operation: Deception Bay Rehabilitation

    By Jeff Starchuck, Harald Kullmann

    "In 2005, an inspection showed that the Deception Bay Wharf in the Canadian Arctic was at the end of its service life. Although Deception Bay is closed with landfast ice up to 5 ft thick, shipping ope

    Jan 1, 2009

  • DFI
    Using Multiple Pile Types On A Single Project To Maximize Benefits

    By James F. Davis, Matthew A. Conte, Robert F. Tonning

    This is a paper demonstrating the steps taken to combine multiple types of piles for a single site to maximize the benefits and characteristics of each method. We intend to discuss the use of grouted

  • DFI
    Data Management Guide Specification

    By Laurel E. Blackman

    The DFI Project Information Management Systems (PIMS) Committee cooperated with the US Army Corps of Engineers (USACE) to develop a specification for PIMS used on USACE projects. Once completed the Co

    Jan 1, 2021

  • DFI
    A Fully Connected Jobsite is a Must for the Future

    By Christian Hoyme, Jochen Maurer

    Most of the current foundation projects are suffering from disconnected information silos. In the first silo there is the planning of the project with corresponding data, presented by paper or digital

    Jan 1, 2019

  • DFI
    Seepage Barrier Mix Design Development, Installation, and Evaluation

    By George W. Little, John Councilman

    "The selection, evaluation, and modification of contractor mix designs for self-hardening seepage barriers, completed by the slurry trench excavation method, can be one of the most critical and challe

    Jan 1, 2016

  • DFI
    Instrumented Hybrid Shoring System for a Deep Temporary Excavation Incorporating Cutter Soil Mixing in Vancouver, BC, Canada

    By Nadir Ansari, Brian W. Wilson, Marina S. W. Li

    "A hybrid shoring system consisting of cast-in-place soldier piles with Cutter Soil Mixing (CSM) infill panels was constructed for temporary support of a 19.8 m (65 ft) deep excavation in Vancouver, B

    Jan 1, 2017

  • DFI
    Innovative Foundation Support and Liquefaction Mitigation Using Deep Soil Mixing and Micropiles

    By Leo Panian, Ryan Nagle, Priyanshu Singh, Gina Carlson, Wayne Magnusen

    "This case study presents the design and construction of an integrated foundation and ground improvement solution utilizing deep soil mixing (DSM) and micropiles. 270 Brannan is a midrise office build

    Jan 1, 2017

  • DFI
    BRING YOUR A-GaME! THE BENEFITS OF ADVOCATING FOR ADVANCED GEOTECHNICAL EXPLORATION METHODS

    By Derrick Dasenbrock, Mary C. Nodine, Benjamin Rivers

    Up to 50 percent of major infrastructure projects suffer impacts to schedule or cost due to geotechnical issues, many of which correspond to risks related directly or indirectly to the scope and quali

  • DFI
    Monitoring of an Embankment Project Using Rigid Inclusions and Vacuum Consolidation During and After Construction

    By Stephen Buttling, Zhong Rui

    "A single unit gas fired power station was being built on the edge of the Gulf of Thailand in 2001. The soil conditions consisted of very soft to soft Holocene Marine Clay, and the site was part of a

    Jan 1, 1900

  • DFI
    Geotechnical Challenges of Pile Driving in a Marginally Stable Slope Terminal 46 Apron Upgrade, Port Of Seattle, WA (18615664-0169-4e91-aa2b-8ec5994bb0a0)

    By Monique Nykamp

    "INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the

    Jan 1, 2007

  • DFI
    Geotechnical Challenges of Pile Driving in a Marginally Stable Slope TERMINAL 46 APRON UPGRADE, PORT OF SEATTLE, WA

    By Monique Nykamp

    "INTRODUCTIONTerminal 46 is located just south of downtown Seattle, and is one of the Port of Seattle’s busiest container terminals. The Terminal 46 Redevelopment Project was undertaken to replace the

    Jan 1, 2007

  • DFI
    Construction Considerations For Ground Modification Projects ? Synopsis

    By J. P. Welsh

    Ground Modification construction is rapidly evolving in the United States. An assessment of the construction status of Ground Modification methods with their dates of introduction and general acceptan

    Jan 1, 2010

  • DFI
    Fogg Museum Expansion - Support of Excavation Design and Construction

    By James L. Christensen, Gregory Sanchez, Michael P. Walker

    The Fogg Museum expansion project required excavation and construction in a congested urban area in Cambridge, Massachusetts. A soldier pile tremie concrete (SPTC) wall provided the support of excavat

    Jan 1, 2015

  • DFI
    Innovative Driven Pile Solution for the Rhode Island Route 6/10 Interchange Project

    By Seth H. Hamblin, Leo J. Hart, John E. Regan

    The Route 6 /10 10 Interchange Design/Build project, located in Providence, Rhode Island, involves the design and construction of five (5) new elevated bridge structures to replace and reconfigure the

    Jan 1, 2019

  • DFI
    Performance of Cement Deep Mixing Method in 2011 Tohoku Earthquake

    By Shoji Higashi, Nobuhiro Honda, Takeo Asanuma, Tatsuo Nagatsu, Masaki Kitazume, Sachihiko Tokunaga, Shigeru Kubo, Hidenori Takahashi, Tsuneyasu Onishi, Yoshiyuki Morikawa

    "Various kinds of civil engineering structures and facilities were seriously damaged in the earthquake in Tohoku and Kanto regions of Japan on 11 March 2011 due to the greatness of its magnitude. In c

    Jan 1, 2015

  • DFI
    Ultimate Bearing Capacity of Small-Diameter Pin-Piles and the Influence of Driving Penetration Resistance

    By Glen Mann, H. G. Vestberg, Robert D. Holtz

    "Underpinning of residential and commercial structures is often accomplished using a number of driven-in-place small diameter steel pipe piles. These piles, at least in the Seattle area, are typically

    Jan 1, 2005

  • DFI
    Design and In-Construction Geologic Characterization of Micropiles to Support a Historic Transmission Line Upgrade in the Steep Talus and Basalt Slopes of the Columbia River Gorge

    By Brian J. Olson, Kevin Haiar

    Originally constructed between 1939 and 1941 as part of Franklin D. Roosevelt’s New Deal programs, the Bonneville to Hood River 115 kV Transmission Line required an infrastructure upgrade to remain re

    Sep 8, 2021

  • DFI
  • DFI
    Sustainable Products For Geotechnical Works

    By Marcus Daubner, Karsten Beckhaus, Florian Bauer

    The construction industry can and needs to contribute to a more sustainable world. Accordingly, geotechnical works potentially have a significant share. In this context, Bauer understands “sustainable

    May 1, 2022

  • DFI
    Deep Mixing Ground Improvement Design to Support Large MSE Walls for Kitimat LNG, BC

    By Randy R. Williams, Roberto R. Olivera, Brian W. Wilson, Marina S. W. Li

    "An extensive, deep mixing (DM) ground improvement program using the Cutter Soil Mixing (CSM) technique was designed and constructed in 2013 to support up to 20 m (66 ft) high Mechanically Stabilized

    Jan 1, 2017