Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Peer Review at Golden Cross Mine, Coromandel
By D Crequer
A Peer Review Panel for the Golden Cross Mine in the upperWaitekauri Valley, Coromandel was initiated in December 1989, before mining, as a requirement of the conditions of the Mining Licence and Wate
Jan 1, 1998
-
Martha Mine Tailings Storage Facilities ù How Do They Stack Up?
By K M. Brodie, D I. K McLeod, J Ruddock
Environmental incidents involving mine tailings and waste rock inevitably become highly publicised and serve to damage the credibility of the entire industry. The recent serious incident involving a s
Jan 1, 2002
-
Orogenic Gold Deposits – A Two-stage Process of Gold Enrichment
By R R. Large
"An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The formation of orogenic gold deposits is commonly a two-stage process. The first stage in
Mar 18, 2015
-
Lessons from the S11D Truckless Mining Project
By T Atchison
The Vale Ferro Carajßs S11D project in northern Brazil is based on the movement of unprecedented volumes of waste and ore for mobile in-pit crushing and conveying or ætrucklessÆ systems. In peak years
Aug 12, 2013
-
A Geochemistry Database for the Coromandel Peninsula
By A G. Mitchell
Stream sediment geochemical analyses were collated from open-file mining company reports and assembled in the REGCHEM computerised database at the Institute of Geological and Nuclear Sciences Limited.
Jan 1, 1992
-
Scientific and Technological Developments in Extractive Metallurgy - Copper and Nickel Extraction
By Flavelle IV
A survey is made of changes in the technical status of a number of western world copper extraction and refining operations over the past 20 years. Specific developments in pyro- and hydro-metallurgy a
Jan 1, 1985
-
Concentration of Silver-Lead Ores
The following brief paper is intended, to apply to the concentration of the silver-lead ores at Broken Hill, New South Wales, generally, but more particularly to the process as applied to the ores in
Jan 1, 1904
-
Contrasting Ephithermal Gold Mineralisation in Andesitic and Rhyolitic Terranes
Two types of low-sulphidation epithermal mineralisation may be recognised in volcanic terranes. Chalcedonic Silica- Adularia-Illite type mineralisation is most common in rhyolitic terranes, whereas
Jan 1, 1991
-
Application of Mine Records to Reduce Project Risk During the Evaluation of Historical Goldfields
By W B. Edgar, I M. Platten, C A. J Towsey, B W. Cuffley
The evaluation of historical goldfields has been common over the past 15 years, reflecting changing economic conditions, improvements in knowledge and technology and lack of greenfield sites. Many gol
Jan 1, 2009
-
Resources versus Reserves – Towards a Systems-based Understanding of Exploration and Mine Project Development and the Role of the Mining Geologist
By J P. Sykes, A Trench
"World-class mine projects are increasingly failing to become world-class mines. Non-technical, socio-political and environmental problems seem, in part, to be the cause. However, the intangible and q
Aug 18, 2014
-
An Overview of New Integrated Geometallurgical Research
The emerging discipline of ægeometallurgyÆ is not new but is becoming increasingly recognised as a discrete and high-value activity that reflects an ongoing commercial and cultural trend towards more
Jan 1, 2008
-
Construction Methods for Remote Locations
Projects to be undertaken in remote locations require special attention with regard to constructability from the very first stages of design. This is to ensure not only that the project is compat
Jan 1, 1986
-
The Need for Quality Control in Sampling Due to Evaluation Advances at Anglo Platinum
Anglo Platinum recognised with its expanded operations the need to change its evaluation strategy due to increased sample volumes and the pressure it created at laboratories. The sender/receiver analy
Jan 1, 2008
-
Selection of Passive AMD Treatment Systems û Flow Chart for New Zealand Conditions
Passive systems for the treatment of acid mine drainage (AMD) are typically more economic in the long term than active systems. Various flow charts for treatment selection have been prepared by scient
Jan 1, 2007
-
Dugald River Deposit: Metallurgy
A major high grade zinc deposit, Dugald River has fine-grained and complex mineral associations which provide considerable metallurgical challenges for both mineral dressers and downstream processor
Jan 1, 1993
-
Getting People Involved-or, Business and People Factors in Installing a Major On-Line Data Base Mining Operation System
By Roberts JD
The design and installation of a major on-line stores and purchasing system, with built-in maintenance reporting and plant register capabilities, needs more than just close attention to computer d
Jan 1, 1983
-
The Greenvale Mine and Railway
Development of the Greenvale orebody, containing 40,000,000 tonnes of nickel ore, began in 1971 and production commenced in 1974. Annual capacity is 2,800,000 wet tonnes. The variations in ore grade
Jan 1, 1974
-
Metallurgical Testing for the Feasibility Study of the Rapu-Rapu Polymetallic Deposit
By R Grogan
The Ungay-Malabago polymetallic deposit, currently owned by Lafayette Mining, is located on the eastern end of the island of Rapu-Rapu which lies east of the city of Legazpi in the Philippines. The is
Jan 1, 2002
-
Steam Outburst in a Hot Mine in Japan
This paper describes a steam outburst in a metal mine which occurred in December 1992 in Japan, resulting in two fatalities. The outburst occurred just after blasting in a heading face 600 m below sur
Jan 1, 2005
-
Lode Structures and Ore Shoots at Vatukoula, Fiji
Vatukoula is a gold mining township situated at the south-west periphery of a Tertiary caldera which measures 3 miles by 4 miles. Erosion of the caldera resulted in the formation of a topographic depr
Jan 1, 1967