Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Dense media separation – a valuable process for preconcentration

    By I Grewal, M Lundt

    Dense medium separation (DMS) is one of several preconcentration methods used for early waste rejection from run-of-mine ores at relatively coarse particle sizes prior to additional milling and benefi

    Sep 11, 2017

  • AUSIMM
    Life-of-Mine Planning in a Dynamic Environment

    By I Manege, S M. Bennett

    The PT Kaltim Prima Coal (KPC) operation is a large scale coalmine operating on the east coast of Kalimantan (Borneo), Indonesia. Originally developed under a coal contract of work (CCOW) with the Ind

    Jul 16, 2014

  • AUSIMM
    Measured and Modelled Response of a Multistory, Urban Structure to High-frequency Blasting Excitation

    By C Dowding, C Aimone-Martin, P Abeel

    This paper presents measurement and analysis of the dynamic response of a five-storey building to very high frequency excitation (>100 Hz) from blasting vibrations originating from a contiguous exc

    Aug 24, 2015

  • AUSIMM
    Isasmelt and IsaMills ù Models of Successful R&D

    MIM Holdings Limited has acquired a reputation for the successful application of R&D to develop break-through technologies for the mining industry. The Isa Process tank-house technology has been licen

    Jan 1, 2002

  • AUSIMM
    Effect of Gravity Recovery on Overall Plant Recovery, Sadiola - A Case Study

    An enhanced gravity concentrator was installed in conjunction with an intensive leach reactor at the Sadiola plant in Mali last year and commissioned in December 2007. There has been much debate over

    Aug 1, 2010

  • AUSIMM
    Integrated Landforms for the Storage of Tailings and Waste Rock at Magnetite Mines in Western Australia

    By D R. Anstey

    The mining of magnetite iron ore in Western Australia will generate large volumes of waste rock and tailings over many decades. The need to dispose of these materials will result in massive waste land

    Jan 1, 2009

  • AUSIMM
    Mercury Sorption on Clinoptilolite

    By K Friese, H P÷llmann

    Clinoptilolites, modified with sodium, produced a material which has been tested for the ability to remove Hg (II) from aqueous nitric acid. The amount of adsorption depends on contact time, acid conc

    Jan 1, 2008

  • AUSIMM
    Use of Pre-injection and Spiling in Front of Hard Rock TBM Excavation

    Hard rock TBMs are very often open machine layouts, with just a part roof shield over the front of the machine. The whole system is designed for fast face advance and the economy of the project often

    Jan 1, 1999

  • AUSIMM
    Lihir Gold Five Years On ù Maximising Throughput and Capital Utilisation

    During the first five years of operation, the Lihir gold mine has steadily increased plant throughput rate to over 4 Mtpa, well above the original design capacity of 2.8 Mtpa. Understanding how future

    Jan 1, 2003

  • AUSIMM
    The History of Ore Reserve Classification and Reporting in Australia

    By Glasson K. R

    The history of Ore Reserve classification and reporting in Australia is largely a history of the Australian mining industry itself. In the late 1800s, when the industry was dominated by small scale,

    Jan 1, 1992

  • AUSIMM
    Dressing of Carbonates by Decrepitation

    By Stevak D, Plesingerova B, Ellias K, Tkacova K

    This paper presents information on the processing of minerals by decrepitation that can be an integral part of their mineral dressing. In the case of carbonates, processing by decrepitation is a spe

    Jan 1, 1993

  • AUSIMM
    Reconciliation of the McKinnons Gold Deposit, Cobar, New South Wales

    By Snowden D. V, Standing C. A, Ryba A, Bywater A

    McKinnons open pit gold mine, located within the Cobar Basin in New South Wales, is characterised by complex mineralisation controlled by the intersection of steep faults in the hinge zone of an ant

    Jan 1, 1997

  • AUSIMM
    A Methodology for Geometallurgical Mapping and Orebody Modelling

    By L Keeney

    Geometallurgy is not a mechanism designed to replace current geological and metallurgical deposit characterisation but an added component required to understand orebody variability. Current geological

    Sep 5, 2011

  • AUSIMM
    Analysis of Twin Road Tunnels Using Numerical Modelling Techniques

    By D R. Wines

    The design of near-surface civil infrastructure requires detailed consideration of the geological/ geotechnical conditions, excavation geometry and sequence and ground support measures to ensure stabi

    Mar 8, 2011

  • AUSIMM
    Fast, Safe and Fully Mechanised Installation of High-Tensile Chain-Link Mesh for Underground Support

    By V Louchnikov

    Ever increasing depth of mineral extraction presents a challenging environment for hard rock underground mines. High in situ stresses and associated seismicity with potential rock burst hazards are th

    Mar 21, 2011

  • AUSIMM
    Microplaty Haematite of the High-Grade Iron Ores – Its Nature and Genesis

    By R C. Morris

    Secondary microplaty haematite in its variety of styles and generations is the defining component of the high-grade banded iron-formation (BIF)-hosted iron ores of the world that are dominated by mart

    Jul 11, 2011

  • AUSIMM
    A Local Authority's View of Mining and the Resource Management Act

    Mining is still a significant economic activity within the Hauraki District. The Martha project is particularly significant. Estimates are that in the order of 850 direct and indirect jobs are derived

    Jan 1, 2000

  • AUSIMM
    Developing Australia's First Block Caving Opeartion at Northparkes Mines - Endeavour 26 Deposit

    The introduction of a new mining method to Australia is not without its risks and challenges. This paper discusses the processes of planning a new operation, with particular emphasis on block caving

    Jan 1, 1995

  • AUSIMM
    Derivation of a Backfilling Strategy for Tabular, Deep, Scattered Mining on Vaal Reefs (Minefill '98)

    By Laas JJ, Spearing AJS

    Considering the capital outlay, running costs and inherent difficulties of backfilling operations at depth the benefits need to be clearly established, quantified and then exploited. Expansion of Va

    Jan 1, 1998

  • AUSIMM
    Olympic Dam open stope observations, tactics and characterisation

    By G Capes, L Morizzi, N Mitkas, E Jones, D Grant

    This paper describes the mining setting for the sub-level open stoping (SLOS) mining method used at Olympic Dam (OD), and investigates the range of stope performance conditions encountered over 30 yea

    Mar 15, 2021