Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Improving Drive Stability through Efficient Development Blasting Design and Practices
By P Klaric
Drive stability is critical in block/panel cave mining. The production levels of these mines are required to remain operational for the entire life-of-mine which can be in excess of 30 years. It is th
Aug 24, 2015
-
Cost Management Optimisation
By B King
Processing expansion options and mining fleet purchases are major cost items that receive due focus in most cost management analyses. If these items are not needed, they can significantly reduce a pro
Nov 24, 2014
-
Performance of the IsaMills in the George Fisher Flowsheet
By M Gao
Six new IsaMills were installed for the George Fisher flowsheet in the Lead/Zinc Concentrator of Mount Isa Mines to produce a product P80 as fine as seven microns. The objective was better liberation
Jan 1, 2000
-
An Advanced Modelling Technique for Scale-Up of Batch Flotation Results to Plant Metallurgical Performance
By O N. Savassi
A rigorous methodology for prediction of flotation plant performance is presented, which is based on a standardised batch flotation test called the MFT. The work is part of the FLEET program, develope
Jan 1, 2005
-
The Influence of Vacation Employment upon Career Paths
As students progress further into a degree, the decision of vocation selection, and even more importantly û securing employment in a particular industry sector, can become quite daunting. However, wit
Jan 1, 2005
-
An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and Structures
By L Cain, C Every, S Mirlatifi, J Ashley
This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor
Sep 17, 2014
-
Benefits of Advanced Technology in Underground Mining
By M Edhammer
In 2007, Atlas Copco introduced an integrated tunnel scanner/profiler. The tunnel scanner, which is integrated into the control system, is mounted on the drill rigs, and replaces the previous variants
Mar 21, 2011
-
Fluid Bed Roasting at Mount ISA
By Casley G. E, Pritchard J
A single slurry fed fluosolids roaster was chosen to replace six multiple hearth roasters in the Copper Smelter at Mount Isa as part of the overall program to increase production from 100 000 to 15
Jan 1, 1974
-
Quantification of Drill Hole Deviation – Century Mine Case Study
By C D. Pocock
Maintaining catch berm capacity in open pit mines through controlled blasting prevents production delays associated with managing risks associated with wall instability. A method has been developed to
Nov 8, 2011
-
Are Tennant Creek Style Ironstone-Related Gold-Copper-Bismuth Deposits Unique? A Review of Available Data and a Comparison with Possible Analogous Deposits
By P A Ferenczi
The Proterozoic iron oxide related Au-Cu-Bi (Tenant Creek style') deposits at Tennant Creek can be classified as syntectonic polymetallic hydrothermal replacement type mineralisation. These dep
Jan 1, 1994
-
Developing Mineral Reporting Competency
By J Coombes
The JORC Code lists the three core principles of Transparency, Materiality and Competency as fundamental to how mineral estimates are publicly reported. But where the principles of Transparency and Ma
Aug 22, 2011
-
Factors Affecting Acid Generation and their Relevance to the Mines of the Northern Territory
By Jiaxin Zhou
Acid mine drainage is a serious and chronic environmental problem of mining. This paper discusses the factors affecting the rate of acid generation by mine rocks and illustrates the relevance of the
Jan 1, 1994
-
What Have we Learnt About Managing Rock Burst Risks?
By Y Potvin
Underground mines in Australia are progressively operating at greater depth, sometimes in conditions where mine induced stresses are very high. In such conditions, the seismic activity often becomes i
Mar 21, 2011
-
ROES® – Automated Rock Extraction
By I Gipps
A vision of what the future mine involves all aspects of mining, ie orebody access, ore stoping, material transport, processing and waste material disposal. This paper examines one aspect of the futur
Nov 22, 2011
-
Coal Seam Gas in New Zealand - Perspective from New Zealand's Most Active CSG Explorers
By S Hayton
While coal seam gas is considered to be an unconventional gas, the proliferation of areas under exploration and development mean that it is rapidly becoming main stream. The potential of New Zealand&a
Jan 1, 2003
-
Harnessing data complexity – how machine learning applies all project data for accurate resource modelling
By S Sullivan
A recent review of resource reports lodged to statutory bodies found geological models with oversmoothed or unrealistic lithological boundaries, many of which do not represent geological appearance in
Mar 22, 2022
-
Decision Support for an Underground Gold Mining Operation - A Case Study using the Schedule Optimisation Tool
By B Maybee, L Fava, D Millar
In the context of a case study for an underground gold mine, the value generated by a schedule optimisation tool (SOT) is assessed. SOT is a software tool for underground mine planning that maximises
May 24, 2012
-
Challenges and Opportunities for Constructed Stream Diversions in the Bowen Basin, Central Queensland
By K White, R Hardie, J Merritt, B Kirsch, R Lucas
Constructed stream diversions are a common element of mine sites across Australia. A review of constructed stream diversion performance in the Bowen Basin funded by the Australian Coal Association Res
Nov 26, 2013
-
The 2,600 Feet Level Exploratory Drive North at North Broken Hill Limited
CONTENTSIntroductionNorthern ExplorationDrive ConceptionGeneralDriving CrewDrive Cross Section and Track DetailsVentilation by Electrically Driven FanTemperatures and HumidityFan PerformanceRock Drill
Jan 1, 1946
-
Sampling and Grade Control Pratices at Misima Mines
The Misima open pit gold mine is a 20Mt per annum operation. Blasthole drilling is used to sample all material at a uniform 5m square pattern, and representative sub- sampling of the blast holes en
Jan 1, 1991