Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Breakage Characteristics for Ores for Ball Mill ModellingBy Whiten W. J
An investigation on the breakage characteristics of closely sized orc samples at different levels of input energy was carried out to determine an appearance function for possible use in ball mill mode
Jan 1, 1983
-
SmartEXEC Implementation Goldcorp Eleonore ProjectBy Michel Massé
Eleonore Project- Agenda ? Purpose and Technical Overview ? SmartEXEC Control Capabilities ? SmartEXEC System Archetecture ? SmartEXEC System Advantage Eleonore Project- Purpose and Technical O
Aug 1, 2013
-
Personal Skills: Economic Analysis of Mineral and Energy InvestmentsBy Franklin J. Stermole
L. Alan Weakly, member SME, is a senior staff engineer, Exxon Co. Weakly chaired a Mining Engineering committee formed to solicit materials for six planned "personal skills" articles, to be used in ME
Jan 2, 1984
-
Invensys Showcase Highlights Process Control TechnologiesBy Steve Kral
In a lagging economy where profits are tight, businesses cut costs. No revelation there. The mining industry, though, has always looked for ways to reduce production costs — no matter the state of t
Jan 1, 2002
-
The Washing of Calcine to Remove Soluble Salts at Great Boulder Gold Mines Limited (add9b255-f732-4157-b8bc-50ff50a1fd29)At Great Boulder Gold Mines Ltd. a number of attempts were made to remove water soluble copper and iron salts from calcined pyritic concentrates but variou~ problems arose and the methods were abandon
Jan 1, 1964
-
An Overview of Optimizing Strategies for Flotation BanksBy M. Maldonado, J. A. Finch
"A flotation bank consists of a serial arrangement of cells. How to optimally operate a bank remains a challenge. This article reviews three strategies for optimizing bank performance: air profiling,
Jan 1, 2012
-
Pin Piles For Seismic Rehabilitation Of BridgesSince the 1989 Loma Prieta Earthquake in the San Francisco Bay Area, the California Department of Transportation (CALTRANS) has accelerated seismic upgrading of their bridges. Many structures can be i
Jan 1, 1993
-
Time Dependent Roof Deterioration At A Central Ohio Coal Mine (b0f3bbeb-91e8-4a62-8116-5f9e444a047e)By Ted Klemetti
Roof deterioration in weak moisture-sensitive rock leads to roof falls in coal mines. An observation site was set up in intake air at an underground coal mine in central Ohio to evaluate the time-dep
Jan 1, 2009
-
Lateral Capacity Of Rigid Piles In Clays Based On Earth Pressure Concepts - SynopsisBy S. Narasimha Rao
Significant amounts of lateral load may act on pile foundations supporting structures such as transmission line towers, tall structures, bridge abutments, offshore platforms, quay wails, harbour struc
Jan 1, 1996
-
Helical Pile Foundation Anchors As A Practical AlternativeBy Dilip Khatri
Helical pile anchors have gained acceptance over the past sixty years. Most recently they have been commonplace in the 20th century for the power utility industry in anchoring transmission towers, equ
Jan 1, 2003
-
Risk Management of the Canada Line Transit Tunnels ? IntroductionBy Brendan Henry
The Canada Line is a 19km long automated light rapid transit system with 16 stations in Vancouver, BC, Canada. The Concession was awarded to InTransitBC to design, build, partially finance, operate, a
Jan 1, 2008
-
Monitoring Used as an Alarm System in TunnelingBy M. Perolo, A. Contini, E. Ramelli, G. Borgonovo, L. Locatelli
This paper presents the ground settlement monitoring system used during the construction of two tunnels bored by two EPB TBMs, beneath the existing and active railway embankment in Bologna (Italy). Th
Jan 1, 2007
-
Fortrac® Geogrids For Mine Roof ControlBy Ray Brandon
The recent introduction of polymer geogrids for ground control purposes in underground mines allows mine operators more flexibility in choosing improved products for several applications. This is evid
Jan 1, 1996
-
Phelps Dodge, Caterpillar Use Technology to Lower CostsBy Steve Kral
For the past several years, copper producers have faced a tough business climate. Nagging low prices forced many them to reduce their production and make other drastic cutbacks just to breakeven. An
Jan 1, 2004
-
Durban Harbour Tunnel—First Use of a Slurry Tunnel Boring Machine in South AfricaBy Andrew K. hg` Officer, A. L. Griffiths, J. Andrew Hindmarch, Gert Wittneben
Durban Harbour in South Africa is one of the continent’s busiest ports however the harbor entrance is currently too small for the new generation of container ships. There-fore it is to be deepened and
Jan 1, 2007
-
Geotechnical And Structural Design Challenges Of The Fremont Central PARK Subway For The Bart WARM Springs ExtensionBy Mitchell L. Fong
The Bay Area Rapid Transit (BART) District will be extending BART service south along an 8.7-km (5.4-mile) -long corridor in the city of Fremont, California as part of the Warm Springs Extension (WSX)
-
Installation, Design, And Quality Control Of Augercast Piles ? IntroductionBy William J. Neely
Augercast piles are formed by drilling a continuous-flight auger into the ground and, on reaching the required depth, sand-cement grout or concrete is pumped down the hollow stem as the auger is withd
Jan 1, 1990
-
Gas-Phase Fluorination Kinetics Of Ta2O5 With Elemental Fluorine - SynopsisBy A. D. Pienaar
The aqueous chemistry of niobium and tantalum compounds with hydrofluoric acid is a mature field of investigation. In contrast, very little attention has been paid to reactions of these compounds in n
Jan 1, 2012
-
Refining Testwork On Crude Magnesium Produced In The Mintek Thermal Magnesium ProcessBy M. Abdellatif
Keywords: Magnesium, pyrometallurgy, Mintek Samples of crude magnesium produced by the Mintek Thermal Magnesium Process were refined in two stages. The first stage consisted of co-melting of batc
Jan 1, 2006
-
Mine Waste Management Planning for an Arctic EnvironmentBy William J. Purdy
Successful design, operation and completion of a surface waste management facility for a diamond mine located in Canada?s northern environment requires careful planning to minimize short and long term
May 1, 2004