Search Documents

  • DFI
    Design Of The Drilled Shaft Foundations For The Cooper River Bridge

    By Liang Shen

    The Cooper River Bridge, the longest cable-stayed bridge in North America, replaces two existing bridges along U.S. Highway 17 and connects the City of Charleston and the town of Mount Pleasant, South

    Jan 1, 2013

  • DFI
    Augered Cast-in-Place Pile Manual, Second Edition, 2003

    The development of Augered Cast-In-Place (ACIP) piles started in the late 1940's when several projects were performed by Intrusion-Prepakt, Inc. utilizing various techniques to place the piling.

    Jan 1, 2003

  • ISEE
    Analysis and Design of Blastwalls to Protect Public Structures From Malevolent Explosions

    By Dale Preece, Steven Sobolik, Richard Jensen

    Recent events demonstrate that civil and government facilities and structures face an ever-increasing need to be designed for protection against malevolent explosions. Modification of existing public

    Jan 1, 2000

  • SME
    Design and Construction of the DLR Extension to Woolwich Arsenal, London, UK

    By Andy Alder

    The Docklands Light Railway (DLR) Extension to Woolwich Arsenal provides a much-needed public transport link to this area of London. The project includes construction of 5.3mID running tunnels under t

    Jan 1, 2008

  • DFI
    Emplacement Techniques: Impervious And Pervious Wall Construction ? Summary

    By Fred C. Schmednecht

    For years, the strategy was to contain waste and in many applications, is still the recommended method. Recently, it has become acceptable to create filters below ground for the in-situ treatment of w

    Jan 1, 1999

  • SME-ICGCM
    Integrated Instrumentation Method of Stress State, Material Property, and Deformation Measurement for Stress Control Method of Mining

    By Shosei Serata

    The application of conventional rock mechanics methods to complex ground is very difficult. Yet. In most underground mining, the ground is complex. Therefore. conventional methods are not only difficu

    Jan 1, 1986

  • ISEE
    "Synchronized Blasting Demolition of Workshop and Chimney under ComplicatedConditions"

    By Jun Yang, Zongshan Zou, Mei Qu, Jianjun Zuo

    For technical renovation of the thermal plant, one frame structure workshop of 50,000 m2 (59,800 yd2) construction area and one reinforcement concrete chimney of 150m (492 ft) height shall be demolish

    Jan 1, 2016

  • IIMP
    Using integrated GPS, Wireless Communication and Computing Technologies to Lower Mining Costs

    By Javier A. Llano

    GPS, wireless communications and on-board and off-board computing capabilities provide today’s mining companies with unprecedented process improvement and cost reduction opportunities. All aspects of

    Jul 17, 2000

  • AUSIMM
    VertiMill« - Development of Circuit Survey and Performance Evaluation Protocols

    By K Kermanshahi, J Allen, MáHilden, M Powell, S Mwansa, S Palaniandy

    Approximately 420 VertiMills« (VTM) have been installed in mineral processing plants throughout the world, mainly in tertiary and regrind applications plus several in secondary grinding duties. Metso

    Jul 15, 2013

  • SME
    Efficiency Of Copper Supported Vermiculite Nano-Antibacterial Material Against Escherichia Coli

    By S. Shi, J. Y. Hwang, B. Li

    Silver, copper, and zinc are commonly known elements with antibacterial and antifungal capabilities. Attempts have been made to dope silver on minerals, glass, and ceramics and the resulting materials

    Jan 1, 2002

  • ISEE
    Presplitting Techniques for Conventional, Air Deck and Dimension Stone Applications

    "The objective in controlled blasting is to reduce overbreak to control the final pit wall slope, shaft, drift ditch, bench, etc. to the final planned excavation limit. The six main types of controlle

    Jan 1, 1994

  • SME
    Developing Trees Tolerant to Degraded Mine Soils in an Underground Greenhouse Mining, Metallurgy and Exploration

    By Michael Kukay, Paul Conrad, Cosmas Opoku-Ware

    This project is exploring the potential for developing trees tolerable to degraded un-reclaimed mine site soils and tailings as a solution to re-establishing long-term tree growth on those sites. The

  • SME
    De Beers, Sandvik Team Up On Underground Automation

    De Beers? Finsch diamond mine began operation in the 1960s as a surface project using the latest technology available. During the 1990s, the operation, located about 160 km (100 miles) west of Kimber

    Jan 1, 2008

  • AIME
    Rock Mechanics - Theory of Similitude as a First Approximation in the Design of Coal Pillars

    By Phillip E. Deering, Robert M. Cox

    A model pillar study was conducted in which the engineering principles of dimensional analysis were applied to the problem of coal mine pillar design. The paper reviews the theory of similitude as app

    Jan 1, 1969

  • ABM
    Caracterização Do Efluente Da Etapa De Filtragem De Um Concentrado De Minério De Ferro

    By Larissa Carolina Ferreira

    O impacto das atividades do setor de mineração sobre o meio ambiente tem levado a estudos visando, tanto à utilização racional dos recursos naturais, quanto o tratamento de efluentes gerados durante o

    Aug 16, 2017

  • SME-ICGCM
    Hydraulic stowing - A solution for subsidence due to underground mining in the USA

    By Kausik M. Sinha

    Hydraulic stowing, which is being practiced in several major coal producing countries to deal with adverse mining conditions, usually permits almost 100% coal recovery from underground mines with mini

    Jan 1, 1989

  • SME
    Planning and Fast Track Tunnel Design in Historical Downtown Charleston

    By James McKelvey, Larry Drolet, Jason Swartz

    INTRODUCTION When divers discovered that sections of a tunnel housing the pipeline that conveys wastewater from the Charleston Peninsula to the Plum Island Wastewater Treatment Facility had caved

    Jan 1, 2005

  • IIMP
    Minería responsable en zona de amortiguamiento de áreas naturales protegidas: caso de Poderosa en Parque Nacional Río Abiseo

    By José Calderón

    Poderosa tiene sus concesiones en las provincias de Pataz y Bolívar en la región La Libertad y son parte de la zona de amortiguamiento (ZA) del parque nacional Río Abiseo (PNRA) y de la zona de transi

    May 22, 2019

  • IIMP
    Recuperación del oro de lodos anódicos de electro-refinación de cobre en la refinería de Ilo

    By Valentín Pamo Caytano

    La electrorefinación en un electrolito de CuSO4 - H2SO4 es usado universalmente para producir cobre de alta pureza a partir de los ánodos impuros. Aunque una parte de las impurezas se disuelve durante

    Sep 12, 2011

  • SME
    The Mine Safety And Health Act: Legislative, Policy, And Enforcement Initiatives Following The Upper Big Branch Explosion ? Introduction

    By L. E. Beverage

    In 2006, the Mine Improvement and New Emergency Response Act (?2006 MINER Act?), Pub. L. No. 109-236, 120 Stat. 493 (2006) was enacted in a bi-partisan move to strengthen the 1977 Mine Safety and Heal

    Jan 1, 2011