Search Documents

  • DFI
    Mitigating Settlement with Pile-Supported Approach Slabs

    By Reda M. Bakeer

    "An approach slab is the roadway segment that immediately follows a bridge intended to provide a smooth transition between the two elements. Some approach slabs have developed rough rideability with t

    Jan 1, 2017

  • CIM
    Low PH Trial in the Ernest Henry Mining Copper Rougher Flotation Circuit (db4a4353-e70f-4fb2-9b3d-7daf6f017863)

    "The Ernest Henry Mining (EHM) ore body is an iron oxide copper gold deposit with an average grade of 1.1 percent copper, 0.5 g/tonne gold and 22 percent magnetite. At the end of 2009, EHM converted t

    Jan 1, 2014

  • DFI
    The Effectiveness Of The Monotube Pile Taper At The Highway 280 Pile Uplift Test Site ? Introduction

    By Samuel J. Kosa

    The Monotube is a uniformly tapered high-strength steel shell pile manufactured for friction pile applications. The Monotube pile was developed in the early 1920's in Canton, Ohio. Its first comm

    Jan 1, 1993

  • SME-ICGCM
    On Rock Failure Criteria for Coal Measure Rocks

    By Murali Gadde

    Design of underground excavations in coal mines involves two major tasks: estimation of stresses and determination of rock mass strength. Owing to the complicated nature of rock mass, progress in its

    Jan 1, 2007

  • CIM
    Coarse Gold Recovery Using Flotation in a Fluidized Bed

    By Eric Bain Wasmund, Lance Christodoulou, Julio Jairo Carmona Franco, María Fernanda Castillo, Jose Concha

    "A number of technologies are in practice for selectively removing coarse gold from conventional grinding circuits. These circuits are often designed so that the grinding mill output is size classifie

    Jan 1, 2015

  • AUSIMM
    Optimising carbon reactivation kiln operation

    By R Bezuidenhout, J K. Claflin, S R. La Brooy, G M. Wardell-Johnson, A M. Claflin

    Best practice gold (Au) recovery is not an accident. It is the result of proper operation of the adsorption circuit using good quality activated carbon. A conventional carbon ‘regeneration’ kiln canno

    Sep 11, 2017

  • IIMP
    Sistema de control maestro para sopladores en paralelo

    By Richard Manrique

    "La implementación del proyecto de modernización de la fundición de cobre de Southern Peru Copper Corporation requiere cambiar la metodología de funcionamiento de los sopladores para la etapa de conve

    Sep 19, 2006

  • DFI
    Vessel Collision Design - Risk Analysis And Deep Foundation Issues For Bridges Over Navigable Waterways

    By Michael A. Knott

    Large lateral forces on bridge foundations due to extreme events such as vessel collisions, earthquakes, and wave forces on storm surges during hurricane events are often the controlling design condit

    Jan 1, 2013

  • SAIMM
    Rapid Installation Of Support In A Partially Raise Bored Shaft Using Sky Jacks. ? Synopsis (80e0c6d7-bb8a-4f50-8633-f573ee75745a)

    By D. Strachan

    Installation of support in known poor ground intersections during reaming operations requires rapid access to stabilize the shaft wall and thus to prevent the loss of the shaft through scaling. This i

    Jan 1, 2009

  • IIMP
    Mejora de la productividad aplicando la mejora continua

    By Eder Salazar

    El presente texto describe la optimización de la productividad en la empresa minera a través de la mejora contínua en la cadena de valor en SMEBSAA, los siete pasos de la calidad, proceso de mina, pla

    Sep 12, 2005

  • CIM
    Stope Sequence Optimization for Narrow Vein, Long Term Mine Planning

    By André van Wageningen

    Long term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    Oct 1, 2004

  • CIM
    10th Anniversary of First Installed HPGR Replacing Tertiary Crusher

    By Frank van der Meer, Jorge Portocarrero, Alexandra Gruendken

    "The number of High Pressure Grinding Rolls (“HPGRs”, also called Roller Press) installations instead of tertiary crushers is rapidly increasing. The technology has been largely accepted in the minera

    Jan 1, 2009

  • AIME
    Sand Filling through Pipes and Boreholes

    By Lucien Eaton

    THE use of filling in mines is less common in the United States than it is in Europe, where in some places it is required by law. In most cases the filling is placed by hand, and the material used for

    Jan 1, 1932

  • DFI
    Deep Mixing Method: An International Overview Of Technology, Testing And Product

    By D. A. Bruce

    The Deep Mixing Method is a very valuable tool for combating problems related to in situ soil treatment, improvement, and retention. Many different variations are used throughout the world, and there

    Jan 1, 2001

  • DFI
    Drilled Piers In The Piedmont - Introduction

    By Stanley A. Schwartz

    In the Piedmont, heavily loaded structures are generally supported by either drilled piers or one of several pile types. The choice of drilled piers or piles is typically one of comparative costs. The

    Jan 1, 1988

  • SME
    Columbus Circle Station Complex - History and Rehabilitation

    By Aram Grigoryan

    This paper addresses historical aspects and construction sequencing of the subway complex under Columbus Circle in Manhattan; the structural elements of the rehabilitation and new construction; and th

    Jan 1, 2008

  • AUSIMM
    Sustainability, Made Easy - A Business Improvement Case Study

    By N Currey, G Corder, G Becker

    "The SUSOP« Framework is a new technique that helps incorporate sustainable development principles and objectives into the design and operation of businesses. Developed through the Co-operative Resear

    Jul 15, 2013

  • ISEE
    A Numerical and Experimental Study of Static and Dynamic Behavior in Cemented Elastic Disks

    By V. Petr, G. G. W. Mustoe, T. G. Rozgonyi

    We introduced a numerical method that is applicable for the analysis of static and dynamic deformations of elastic media. In this numerical study, each elastic body is modeled with a system of several

    Jan 1, 2000

  • ISEE
    Fire and Explosion of a Mobile Explosive Manufacturing Unit

    By Jose a. Sanchidrian, Ramon G. Eguren, Javier L. Amigo

    On December 2013 a MEMU exploded at a blasting site in Norway, after burning for more than two hours. This paper describes the analyses made to determine the actual yield of the explosion, the lessons

    Jan 1, 2016

  • CIM
    Les Terrains Auriferes Site -Site Closure and Rehabilitation, Conceptual to Construction

    By R. Knapp, R. Firlotte

    "Les Terrains Auriferes (LIA) Property, formerly the Malartic Goldfield (Goldfield) mine, ceased its remaining milling operations in the fall of 1994. During the early years of mining, the mill proces

    Jan 1, 1997