Search Documents

  • NIOSH
    High Stress Mining Under Shallow Overburden In Underground U. S. Stone Mines

    By Thomas P. Mucho, Dennis R. Dolinar, Anthony T. Iannacchione

    The Chestnut Ridge Anticline is a prominent structure in southwestern Pennsylvania, USA. This structure has brought two economically valuable limestone formations to the surface, where they are easil

  • TMS
    Thermodynamic Modeling Of Desilversing Of Lead Bullion By Zinc During Lead Refining

    By Pengfu Tan

    A thermodynamic model has been developed to model the desilverising process of lead by the addition of zinc during lead refining, whereby silver-zinc solid solutions are formed, and floats out of the

    Jan 1, 2005

  • DFI
    Capacity Of Large Diameter Bored Piles Determind By Stress-Wave Theory ? Synopsis

    By S. X. Liang

    In China, the bearing capacity predictions of the pile with Stress-Wave Theory have been developed rapidly in recent years. This paper recommended a DZH-3 Pile Driving Analyzer and its relevant comput

    Jan 1, 2010

  • AUSIMM
    Points on Patents

    Amongst the unavoidable studies of the mining engineer who desires to reach the maximum efficiency, is the subject of patents. With the fundamental principles of the patent laws of this and other lead

    Jan 1, 1901

  • SME
    Loosening And Face Stability With Shallow Overburden In The ?Sitina Tunnel,? Bratislava, Slovakia

    By Chikaosa Tanimoto

    INTRODUCTION Bratislava is located at the intersection of important traffic routes, including motor-ways, roads, railways, air traffic, trading, and inland waterway with an important harbour. The con

  • DFI
    Piling The Gateway To Europe

    By Howard Roscoe

    Linking Ashford International Station to the new Channel Tunnel Rail Link required over 5000 rotary bored and CFA (continuous flight auger) piles to form tunnel walls and viaduct foundations and to su

    Jan 1, 2002

  • SME
    Numerical Analyses Of Stability Of Three-Way And Four-Way Coal Mine Intersections In Illinois

    Roof falls in coal mines typically occur in or around intersections and this has not changed in the last two decades. This research develops an improved scientific understanding of stress distribution

    Feb 27, 2013

  • CIM
    Agnico-Eagle Laronde Plant: Metallurgical Challenges Present and Future

    By Jean Cayouette, Paul Blatter, Paul Cousin

    "The Laronde mill was commissioned in 1988 and has been treating the Laronde Penna ore since 2000. The Laronde plant, situated in the Abitibi region of Quebec, has experienced mill expansions to accom

    Jan 1, 2011

  • SME
    Landslides, Drought, And Brown Trout In The Red River, NM

    By D. Conklin

    Annual fish monitoring of the Red River, NM from the town of Red River to downstream of Questa, NM has been conducted since 1997. This long-term dataset, sponsored by the Chevron Mining Inc. Questa M

    Jan 1, 2011

  • NIOSH
    RI 9328 - Laboratory Testing of the CSE SR-100 Self-Contained Self-Rescuer for Ruggedness and Reliability

    By N. Kyriazi

    The U.S. Bureau of Mines subjected the CSE SR-lOO self-contained self-rescuer (SCSR) approved by the National Institute for Occupational Safety and Health (NIOSH) and the Mine Safety and Health Admini

    Jan 1, 1990

  • CIM
    In-Situ Recovery in Hard Rock Applications: Idealistic Notion or Realistic Future Processing Option?

    By L. Vollert

    In-situ recovery of metals is presently experiencing a revival not seen since early applications in amenable copper oxide deposits, uranium and generally applications where neither, porosity and perme

    Jan 1, 2019

  • AIME
    History of the Institute - I - 1871-1946

    By A. B. Parsons

    Jan 1, 1971

  • CIM
    Optimization of the paste backfill plant at Louvicourt Mine (930a856d-d697-4cc4-918f-5d8dfe68aeb0)

    By Jean Cayouette

    "In 1995, Louvicourt Mine started one of the first paste backfill operations in Canada. From 500,000 tonnes in 1995, the annual paste backfill tonnage produced reached 800,000 tonnes in 1999. The maxi

    Jan 1, 2002

  • SAIMM
    Pre-sink shaft safety analysis using wireline geophysics

    By N. Andersen

    During the preliminary design phases and feasibility study of a proposed vertical shaft, a vertical diamond drill-hole is normally drilled on the site. This paper outlines how rock mass characteristic

    Jan 1, 2015

  • IIMP
    Mejorando la eficiencia de la operación mediante el control avanzado en Molienda

    By Juan Kobashicawa, Bernardo Falcón

    En este trabajo se explican los controles automáticos desarrollados (In-House) e implementados en el circuito de Molienda de Compañía Minera Antamina, el cual abarca Molinos SAG, de Bolas y los Hidroc

    Sep 1, 2017

  • CIM
    Millpebs Testing at Brunswick Concentrator

    By Pierre Lacoste-Bouchet, Ian Orford, Mike Cooper

    "The Brunswick Mine ore requires fine grinding to achieve liberation of minerals. With 25mm slugs as the grinding media in the ball mill, there was a limitation of a P80 of 25 microns on the CuPb regr

    Jan 1, 2006

  • AUSIMM
    Sedimentary Structures in the Metamorphic Rocks and Orebodies of Broken Hill (7122c7bd-f6fa-43f0-828a-39df96a7a19e)

    B. P. Thomson (South Aust. Dept. of Mines): Dr. A. B. Edwards presents in the published discussion on the above paper, his interpretation of the dolerite dyke-lode relationship as a major objection to

    Jan 1, 1959

  • AUSIMM
    Atomic Absorption Analysis for Nickel Using a Resonance Detector

    Resonance re-emission from nickel vapour affords a convenient method for isolating the resonance lines at 3415A, 3515A, and 3524A. The vapour is generated by cathodic sputtering and is illuminated by

    Jan 1, 1968

  • DFI
    Overview Of Earth Retaining Systems And Their Selection

    By Raymond J. Castelli

    The paper provides a general overview of the numerous types of earth retaining systems currently available, and organizes these various systems by several classification methods. These classifications

    Jan 1, 2003

  • CIM
    Kansanshi Copper Smelter: The First Four Years of Operation

    By S. Hunt, D. de Vries

    Kansanshi Copper Smelter began operation in March 2015. The smelter features a single Isasmelt furnace for smelting, one 6-in-line electric furnace for matte-settling and slag-cleaning duties, four Pe

    Jan 1, 2019