Search Documents

  • ISEE
    Expansion of the Panama Canal

    By Tom Treleaven

    The widening of the Panama Canal to approximately 130 feet (40 m) for its entire length began just a few years ago. The original expansion program was slated for completion in 18 to 20 years, but has

    Jan 1, 1997

  • AUSIMM
    Enhancing the Business Environment for Prospecting, Exploration and Mining (Past and New Initiatives)

    By K L. Temel, W P. Player

    The underlying message of this paper is that investment in prospecting, exploration and mining in New Zealand is welcomed. The Government's policy with respect to Crown owned minerals is for cont

    Jan 1, 1997

  • SME
    Environmental Assessment Study For Extension Of Spadina Subway In Toronto

    By Verya Nasri, Scott Thorburn

    The City of Toronto and the Toronto Transit Commission (TTC) have conducted an Individual Environmental Assessment (EA) for a 6.2 km, 4-station underground extension of the Spadina Subway from Downsvi

    Jan 1, 2007

  • CIM
    Reflectance Spectroscopy with X-Ray Fluorescence for Rapid Slurry Analysis

    By Olli Haavisto, Juha Timperi

    "Accurate on-line assays of mineral slurries are the basis for effective operation of flotation circuits. Typically the elemental content measurements are obtained by an X-ray fluorescence (XRF) analy

    Jan 1, 2016

  • SME-ICGCM
    New Era in Longwall Top Coal Caving Geomechanics

    By Abouzar Vakili

    Longwall Top Coal Caving (LTCC), as the most attractive method for thick coal seams, has been suffering from insufficient geomechanical understanding for the past few years. Cavability without doubt

    Jan 1, 2007

  • SAIMM
    The Dual-Electrode DC Arc Furnace ? Modelling Insights

    By Q. G. Reynolds

    Keywords: Pyrometallurgy, furnace, DC, reverse polarity, dual-electrode The dual-electrode direct current (DC) arc furnace uses two graphite electrodes, one connected as cathode, and one as anode.

    Jan 1, 2011

  • TMS
    Morphological, Mechanical And Optical Characterizationof Flyash Filled Nylon 6

    By P. A. Mahanwar

    Flyash were melt mixed with nylon 6 at a 30wt% concentration. TYZOR® TPT, a coupling agent, was used to facilitate the link between filler and matrix. The morphological characterization, using SEM, re

    Jan 1, 2006

  • AUSIMM
    æCleanfillingÆ ù A Valuable Means of Rehabilitating Quarries in Auckland

    By A Hanna

    Quarries around Auckland have reached or are reaching the ends of their lives, which raises issues about rehabilitation. Significant volumes of 'cleanfill' are generated by the City, particu

    Jan 1, 2002

  • ISEE
    Prediction of Detonation Parameters (95f7a43f-745c-4ae7-ad4e-74c781870372)

    By P D. Katsabanis

    This chapter describes the principles for the derivation of the equations for a detonation wave. The importance of the equation of state for the detonation products is demonstrated and commonly used e

    Jan 1, 1991

  • NIOSH
    Ergonomic And Existing Seat Designs Compared On Underground Mine Haulage Vehicles

    By Chris Jobes, Alan Mayton, N. Kumar Kittusamy, Dean Ambrose

    NIOSH researchers conducted a study to compare seat designs on underground coal mine haulage vehicles. The objective of the study was to support prior findings that NIOSH-designed seats, which incorpo

  • CIM
    Performance of Large Low- and High-Aspect Ratio SAG Mills at Gold Fields’ Ghanaian and Australian Mines

    By Michael I. Brittan, Craig M. Sams

    "Economies of scale and the variable characteristics of many large ore deposits have resulted in grinding installations using very large SAG mills fitted with variable speed drives. Low-aspectratio si

    Jan 1, 2006

  • NIOSH
    Empirical Approaches For Weak Rock Masses (15cf9004-760f-47b2-8d56-8025fc15bd1d)

    By Rimas Pakalnis, Tom Brady, Lewis Martin

    A major focus of ground control research presently being conducted by the Spokane Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) is to incorporate weak rock m

  • SME
    Detection of Subtle Sensor Errors in Mineral Processing Circuits Using Data-Mining Techniques Mining, Metallurgy and Exploration

    By Rambabu Pothina, Rajive Ganguli

    The economics of a mineral processing circuit is dependent on the numerous sensors that are critical to optimization and control systems. The sheer volume of sensors results in mines not being able to

  • SME
    Detection of Subtle Sensor Errors in Mineral Processing Circuits Using Data-Mining Techniques Mining, Metallurgy and Exploration (388248c9-1aa9-4f25-8e7c-bbfe8ed3e46e)

    By Rambabu Pothina, Rajive Ganguli

    The economics of a mineral processing circuit is dependent on the numerous sensors that are critical to optimization and control systems. The sheer volume of sensors results in mines not being able to

  • SAIMM
    Mineralogical Solutions For Pyrometallurgical Problems

    By L. Andrews

    Keywords: mineralogy, phase-chemical, chemical-looping combustion, XRD, SEM, EDS, QEMSCAN, PGM, slag, matte, ilmenite Mineralogy, traditionally associated with concentrator studies, is being incre

    Jan 1, 2011

  • SME
    Application of Thermal Fragmentation in Australian Hard Rock Underground Narrow-Vein Mining Mining, Metallurgy and Exploration (1e34d89c-0565-45bf-a22d-0191b2dfefff)

    By Larissa Koroznikova, Steve Durkin, Bradley Drake, Michael Tuck

    This paper presents the results from the investigation of the application of thermal fragmentation in Australian hard rock underground narrow-vein mining. Two geologically similar samples from an unde

  • SME
    Application of Thermal Fragmentation in Australian Hard Rock Underground Narrow-Vein Mining Mining, Metallurgy and Exploration

    By Larissa Koroznikova, Steve Durkin, Bradley Drake, Michael Tuck

    This paper presents the results from the investigation of the application of thermal fragmentation in Australian hard rock underground narrow-vein mining. Two geologically similar samples from an unde

  • DFI
    Driven Piles In Glacial Deposits Exhibiting Time Dependent Capacity

    By Upendra L. Karna

    The pile capacity gain with time evaluated and implemented for the construction of the Route 21 Viaduct in Newark, NJ, U.S.A is discussed in this paper. The project consisted of the replacement of mor

    Jan 1, 2006

  • DFI
    Tied-Down Boat Section Construction

    By Romano J. Micciche

    One of the largest scale uses of a multiple, high-strength steel bar tiedown system is described. Tiedowns were installed to resist hydrostatic uplift forces acting on a section of the Interstate High

    Jan 1, 1994

  • AUSIMM
    The Development of a Non-Roasting Technology for Polymetallic Gold and Silver-Bearing Sulfide Concentrates Treatment

    The Development of a Non-Roasting Technology for Polymetallic Gold and Silver-Bearing Sulfide Concentrates Treatment

    Sep 13, 2010