Search Documents

  • SME
    Numerical Investigation of the Effect of a Novel Wet Scrubber on Dust Reduction in an Underground Coal Mine Mining, Metallurgy and Exploration (330345b3-631c-4721-bb65-792de9742b60)

    By Thomas Novak, Sampurna Arya

    Controlling dust generation and keeping it below permissible limits to meet federal dust standards at the working face of a roomand-pillar coal mine is a challenge for a mine operator. With the recent

  • CIM
    Antiscalants for Calcium Scale Control in Gold Process Circuits

    By Brad Wells, Wayne Bull, Wayne Dickinson

    "Antiscalants were evaluated for control of calcium carbonate (CaCO3) in gold processing applications. Under severely supersaturated conditions, 100 percent inhibition was achieved with 30 ppm antisca

    Jan 1, 2014

  • SME
    Numerical Simulation Studies on Effects of Explosion Impact Load on Underground Mine Seal Mining, Metallurgy and Exploration (5cd6bb51-d24c-4ceb-bdd2-327b1ac6637a)

    By Congling Shi, Marek Borowski, Yue Wang, Jianwei Cheng, Xixi Zhang, Xuan Xu

    As the first barrier to prevent accidents caused by explosions in underground coal mines, the integrity and stability of mine seals have great effects on mine workers’ lives and underground production

  • SME
    Numerical Simulation Studies on Effects of Explosion Impact Load on Underground Mine Seal Mining, Metallurgy and Exploration

    By Congling Shi, Marek Borowski, Yue Wang, Jianwei Cheng, Xixi Zhang, Xuan Xu

    As the first barrier to prevent accidents caused by explosions in underground coal mines, the integrity and stability of mine seals have great effects on mine workers’ lives and underground production

  • IIMP
    Improving the efficiency of grinding-classification and gravity separation. The use of Rheology Modifier

    By F. J. Sotillo

    The reduction in energy consumption has been always important for beneficiation plants. Also gravity separation processes have gained lately great importance due to environmental concerns, especially

    Sep 9, 2007

  • IIMP
    Como optimizar los métodos tradicionales de estimación de reservas con el análisis variográfico geoestadístico

    By Samuel Canchaya

    Los paquetes medianos y grandes de software a minería contienen en sus módulos de estimación de reservas alguna forma de análisis variográfico geoestadístico. En esa perspectiva, el presente trabajo s

    May 25, 1998

  • SME
    Analysis of the Hydro-fracture Potential Around Water Tunnels in Rock

    By Emad Iskander

    The seepage forces generated around pressurized water tunnels in rock are investigated using the analysis tools of geomechanics. The theoretical background of the two-phase material behavior is explai

    Jan 1, 2008

  • ISEE
    Report on the New Risk Criteria Proposed by the RCC Risk Committee

    By Tom Pfitzer, Alice Correa, Meredith Hardwick

    The past decade has brought significant changes in the use of risk-based criteria for safety within the U.S. Department of Defense. The Range Commanders Council (RCC) chartered a working group to deve

    Jan 1, 2007

  • CIM
    How Many Samples are Enough? Theoretical Determination of the Critical Sampling Density for a Greek Clay Quarry.

    By Konstantinos Modis

    According to recently established theoretical analysis and under certain conditions, a critical sampling density can be determined for an earth-related space-distributed natural variable. Sampling abo

    Oct 1, 2009

  • AUSIMM
    The 1999 JORC Code ù What Does it Mean for TodayÆs Mining Geologist?

    The 1999 edition of the Australasian Code for Reporting of Identified Mineral Resources and Ore Reserves (the æJORC CodeÆ) became effective in September 1999 and is the latest revision of a Code which

    Jan 1, 2000

  • SAIMM
    Bateman Mega DMS Modules- Successes And Challenges - Introduction

    By N September, R Abate

    Bateman Modular (previously Van Eck and Lurie) has been building and supplying the mining industry with modular DMS plants for the last 30 years. These DMS modules range in capacity from 1 tph to 200

    Jan 1, 2006

  • SME
    Sampling Methods for Seamount Cobalt-rich Crusts and Determination of the Minimum Reliable Assay Sample Quantity

    By Xuehua Zhang, Shengxiong Yang, Huiqiang Yao, Gaowen He

    "Seamount cobalt-rich ferromanganese crusts (hereafter crusts) are authigenic iron/manganese hydroxide/oxide deposits formed from direct precipitation of minerals from seawater onto a hard substrates

    Sep 1, 2014

  • TMS
    Converter Modernization And Operational Improvements At The Pirdop Smelter

    By William A. Enrico

    Umicore acquired the Pirdop Smelter in a privatization offering by the Bulgarian government in September 1997. Since that time, an investment program has been conducted to increase capacity to 225 00

    Jan 1, 2005

  • AUSIMM
    Is an 80th Percentile Design Point Logical?

    By D David

    Clearly a plant designed only to treat average ore at the nameplate rate will fail to achieve nameplate in any typical year. To insert the necessary capability to achieve nameplate it is common proces

    Jul 15, 2013

  • DFI
    Project Specifc Design Criteria I-880 Reconstruction Project, Oakland, California

    By Steve Thoman

    After the 1989 Loma Prieta Earthquake, the California Department of Transportation (Caltrans) initiated an overview of the Caltrans Bridge Design Specifications (BDS) and bridge seismic design practic

    Jan 1, 1996

  • SME
    Marine Minerals and Ocean Mining Potential in the North Atlantic

    By Steinar L. Ellefmo, Fredrik Søreide

    "The Norwegian University of Science and Technology (NTNU) and Nordic Ocean Resources AS, with support from Statoil ASA have carried out a project reviewing the knowledge about seabed mineral resource

    Sep 1, 2014

  • AUSIMM
    Settling Pond Design and Performance - The Malvern Hills Coal Mine Experience

    By J F. Seale

    The design of the settling pond for the Malvern Hills opencast coal project was based on a primary requirement to control runoff and sediment generated from the immediate 6 ha mine catchment, which in

    Jan 1, 2004

  • SAIMM
    Simulation-assisted plant design, A. Lebedev

    By A. Lebedev

    Application of dynamic simulation for a base metal processing plant is discussed. The plant receives ore of variable quality from two pits and blending had to be applied to maximise recovery. The plan

    Jan 1, 2020

  • SME
    Combined Effect of Operating Parameters on Separation Efficiency and Kinetics of Copper Flotation Mining, Metallurgy and Exploration

    By Yousef Ghorbani, Abolfazl Danesh, Fatemeh Kazemi, Ataallah Bahrami, Morteza Abdollahi, Mohammad Raouf Hosseini

    This study aims to investigate the effects of operational variables on concentrate grade, recovery, separation efficiency, and kinetic parameters of the copper flotation process. For this purpose, the

  • CIM
    The Challenges and Ramp op of Filtered Tails in a Modern Production Plant – Éléonore Project Experience

    By Andy Fortin, Jeet Basi, Simon Hille

    Goldcorp’s Eleonore mine is situated in Ell Lake area in the northeastern part of the Opinaca reservoir in the James Bay region of Quebec. The design of the 7000 t/d process plant includes crushing,

    Jan 1, 2016