Search Documents

  • AUSIMM
    Property Trends in Latrobe Valley Brown Coals and Implications for Future Utilisation

    By Wood W, Bell A

    Brown coal production in Victoria's Latrobe Valley Region (Figure 1) continues to rise and currently stands at around 50 Mt per annum. With the exception of around 2 Mt used to produce some 700

    Jan 1, 1992

  • DFI
    Residual Loads Measurements in Driven Steel H-Piles

    By Reda M. Bakeer

    "Measurements obtained during load testing of two steel H-piles driven at a site in Northeastern Mississippi are discussed. The general site conditions, equipment used, testing procedures and results

    Jan 1, 2017

  • AUSIMM
    Lessons Learnt and Performance – Installing and Commissioning an Ausenco Carbon Reactivation Kiln in Africa

    By D Preedy, J K. Claflin, S R. La Brooy

    A gold mine in north-eastern Africa has expanded throughput from 5 to 10 Mt/y in recent years. The original carbon regeneration kiln was incapable of achieving required throughput or meeting process c

    Sep 7, 2015

  • SME
    Design and Startup of Cortez Gold Mine’s Pipeline Mill

    By Randy N. Powell

    The Pipeline gold ore body was discovered in Lander County, NV in March 1991. Construction of the new mine and mill did not start until early March 1996. The $289-million project was placed on a fas

    Jan 1, 1999

  • AUSIMM
    The Brown Coal Geology of the Gippsland Basin

    By Holdgate G. R, Thompson B. R, Webster R. L, Bolger P. F

    The Gippsland Basin in south-eastern Australia has an area of approximately 46 000 sq km. It is one of the world's major coal and petroleum bearing basins, with most of the former occurring in

    Jan 1, 1992

  • CIM
    Optimizing performance of AG/SAG mills – A design approach

    By Sanjeeva Latchireddi, Travis Orser

    "Today’s high capacity semiautogenous grinding (SAG) mills expend vast amounts of energy and in doing so consume tons of shell liners and steel balls, while processing ore. The energy efficiency of th

    Jan 1, 2005

  • CIM
    Traitement des eaux contaminées - Mine Restigouche, Nouveau-Brunswick

    Plan de l?exposé ?? Présentation du site de la mine Restigouche et du mandat confié à Genivar ??Dénoyage de la mine ??Processus d?enlèvement des boues au fond de la fosse ??Utilisation de Géotubes

    Feb 1, 2008

  • AUSIMM
    29th Annual Conference 1996 - Field Notes

    Greymouth River Dredge û Birchfield Minerals Ltd Blackwater Gold Mine û Macraes Mining Company Ltd Globe Progress Gold Mine û Macraes Mining Company Ltd

    Jan 1, 1996

  • NIOSH
    RI 9426 - Dust Considerations When Using Belt Entry Air to Ventilate Work Areas

    By Robert A. Jankowski, J. Drew Potts

    In this U.S. Bureau of Mines study, four underground respirable dust surveys were conducted to determine factors affecting belt entry dust levels and how using belt air to ventilate work areas affecte

    Jan 1, 1992

  • CIM
    Real Time Performance Management in Metallurgical Operations

    By O. A. Bascur, J. Patrick. Kennedy

    "The lack of integration of mining and metallurgical information at sufficient detail to act is a problem. Without such data, mine cut-off grade can not be optimized on a per grade basis. It is diffic

    Jan 1, 2004

  • SME
    Lyon–Turin Long and Deep Railway Tunnel Project

    By P. Fauvel, V. Nasri

    In January 2001, French and Italian governments signed an agreement for the construction of a new Lyon-Turin railway line. This project includes a tunnel of 53.1 km length and a maximum of 2500 m over

    Jan 1, 2005

  • SME-ICGCM
    Optimised Layout And Roadway Support Planning With Integrated Intelligent Software

    By S. Kouniali

    Experience with knowledge-based systems for Layout planning and roadway support dimensioning is on hand in European coal mining since 1985. The systems SOUT (support choice and dimensioning, 1989), SO

    Jan 1, 1996

  • AIME
    Mining - Underground Mining - Methane Gas Detection Using a Laser

    By H. J. Gerritsen

    From presently available components a portable, rugged, reliable apparatus can be built which will be able to detect methane concentrations of 0.1% and lower in air. Sensitivity and design considerati

    Jan 1, 1967

  • SME
    Floodplain Aggregate Mining in Western Oregon

    By E. F. Schnitzer

    During 1996 and 1997, Oregon experienced flooding on a scale not seen in many years. Some gravel pits located near rivers experienced erosion. In several cases, breaches occurred between the gravel p

    Jan 1, 1999

  • SME
    Cribless Tailgates In The Pittsburgh #8 Coal Seam Employing Cable Trusses – Preprint 97-199

    By A. Wahab Khair, John G. Oldsen, John C. Stankus, Song Guo

    During the last several years, implementation of trusses, in lieu of wood cribs, has been successful for supplemental tailgate support in the Pittsburgh seam. This paper reviews, the truss support sys

    Feb 24, 1997

  • IMMS
    Deep Sea Exploration New Technologies - History Of Bauer

    By Leonhard Weixler

    The Bauer company was founded in 1790 by coppersmith Sebastian Bauer in Schrobenhausen, a small town north-west of Munich. The original workshop business carried out works including repairs to church

    Jan 1, 2011

  • DFI
    Holding Back The Watchung Mountains

    By Ryan C. Linthicum

    A system of steel sheeting and multiple levels of high capacity double corrosion protected soil anchors were used to restrain a major slope failure that occurred at the base of the Watchung Mountains

    Jan 1, 2003

  • AUSIMM
    A New Method for Coal Pillar Design

    By KEITH BARRONI

    In the proposed criterion for coal a distinction is made between brittle and "psuedo-ductile" failure. This criterion is the basis for the development of new equations for coal pillar streng

    Jan 1, 1988

  • AUSIMM
    Large Excavations in Weak Mudstone for the Porgera Mine Plant Development

    The plant and processing site at Porgera has been built on a levelled mudstone ridge about lkm E of the mine. Excavation of 7xl06m3 of soil and rock was necessary to achieve the required area. The

    Jan 1, 1991

  • AUSIMM
    Production of Nickel Bearing Pig Iron in Blast Furnace From Chromite Overburden

    By Kumar A, Mishra N. C

    For each tonne of chromite ore mined in Sukinda, approximately ten tonnes of fine overburden material is generated. The overburden typically contains about 30 - 60 per cent Fe2O3, 0.3 - 1.1 per cent

    Jan 1, 1999