Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Development of the 3D Numerical Modeling of Roof Bolts for Studying the Bolt/Rock Interaction

    By WenFeng Li

    A 3D roof bolt model with the consideration of rebar, resin, bearing plate, and resin/rock interface was developed for studying the bolt/rock interactions of the tensioned and fully-grouted resin bolt

    Jan 1, 2014

  • SME-ICGCM
    Analysis of a Stability Problem in an Underground Coal Mine Due to Floor Conditions

    By M Nombe

    Based on the analysis of a case study at POWELTON No.2 MINE, it was determined that mine stability problems had occurred due to floor softening. A fireclay (underclay) layer in the immediate floor was

    Jan 1, 2002

  • SME-ICGCM
    Support Strategy for Tailgates below Gob Edge Using Split-Level Longwall Panel Layout for Deep Inclined Coal Seams

    By Pengfei Wang, Guorui Feng

    With increase of cover depth, dynamic incidents, such as large gateroad convergences and coal bursts, are frequently encountered when mining deep longwall panels. It would be more adverse due to large

    Jan 1, 2018

  • SME-ICGCM
    Numerical Modeling Of "Stiff" Backfill in the Coeur D'Alene Mining District (17e85e0c-8155-492f-9c87-d2b9dd6611c4)

    By Ed Van Eeckhout

    As part of a U.S. Bureau of Mines-sponsored project on the utilization of "stiff' backflll to minimize potential rock burst hazards, a finite element study was undertaken to predict stresses and

    Jan 1, 1984

  • SME-ICGCM
    Development of a Risk Rating System for Use in Underground Coal Mining

    By Johann van Wjk

    Mandatory Codes of Practice to Combat Rock Fall Accidents came into force on South African Collieries in 1997. These were drawn up in accordance with guidelines issued by the Chief Inspector of Mines,

    Jan 1, 2002

  • SME-ICGCM
    Optimization Research on Flexible Shield Supports Mining Method in Steeply Coal Seam

    By Bingjie Huo

    "China is a major coal producer and consumer. It is necessary to mine the steeply pitching coal seams due to development of the coal industry to meet the increasing needs for coal. Flexible shield sup

    Jan 1, 2010

  • SME-ICGCM
    Investigations into the Corrosive Environments Contributing to Premature Failure of Australian Coal Mine Rock Bolts

    By Elia Elias, Alan Crosky, Paul Hagan, Damon Vandermaat, Serkan Saydam, Peter H. Craig

    "The University of New South Wales (UNSW Australia) had been involved in the study of premature failure of rock bolts in Australian coal mines from the initial identification of the problem in 1999 (C

    Jan 1, 2015

  • SME-ICGCM
    Mechanism and Prediction of Ground Surface Subsidence Due to Multiple-Seam Longwall Mining

    By Gang Ren, Behrooz Ghabraie

    "Observational data suggest that the ground surface subsidence profile from multiple-seam longwall mining is rather different from that of single seam. Despite the increase of coal production from mul

    Jan 1, 2016

  • SME-ICGCM
    Influence of Roof/Floor Interface on Coal Pillar Performance

    By Kyle A. Perry

    Pillar design formulae have existed for decades, and the guidelines for design stability factors are generally accepted by regulatory agencies and broadly used within the coal industry. Nearly all des

    Jan 1, 2013

  • SME-ICGCM
    Challenges of Mining the First Right-Handed Longwall Panel in a New Reserve Block in Pittsburgh Seam

    By Jun Lu, Greg Hasenfus

    "In this paper, the mining experience and challenges for the first right-handed longwall panel in the Pittsburgh seam are introduced. The longwall headgate T-junction experienced very high face conver

    Jan 1, 2018

  • SME-ICGCM
    What Factors Over and Above Those Included in the Existing Coal Mine Roof Rating (CMRR) Could Also Be Predictive of Roof Instability in Underground Coal Mines?

    By Elizabeth Holley, Meriel Young, Gabriel Walton

    "The coal mine roof rating (CMRR) was developed by Chris Mark and Greg Molinda to bridge the gap between geological variation in underground coal mines and engineering design. The CMRR accounts for th

    Jan 1, 2018

  • SME-ICGCM
    High Performance Longwall Production Based on Rag Experience in German Coal Mines

    By Bolger Witthaus

    "High performance production under challenging geological conditions is a product of several parameters. Main factors are the technical equipment and the knowledge in processing. The design and the su

    Jan 1, 2010

  • SME-ICGCM
    Development of An Enhanced Methodology for Ground Movement Predictions Due to Longwall Mining in the Illinois Basin

    By Zach G. Agioutantis

    The Illinois Basin has an extensive history with the use of mechanized longwall mining dating back to the early 1970?s. In recent times, technological advances have resulted in increased panel widths

    Jan 1, 2014

  • SME-ICGCM
    In Situ Stress Measurement and Stress Change Monitoring in a Longwall Mine to Monitor Overburden Caving Behaviour and to Design a Hydraulic Fracture Treatment Program

    By Rob G. Jeffrey, Ken W. Mills, Jesse W. Puller

    "A coal mine in New South Wales is longwall mining 300m wide panels at a depth of 160-180m directly below a 16-20 m thick conglomerate strata. As part of a strategy to use hydraulic fracturing to mana

    Jan 1, 2015

  • SME-ICGCM
    A Case Study of Multi–Seam Coal Mine Entry Stability Analysis with Strength Reduction Method

    By Ihsan Berk Tulu, Michael Sloan, Ted Klemetti, Michael M. Murphy, Gabriel S. Esterhuizen, Jame Sumner

    "In this paper, the advantage of using numerical models with the strength reduction method (SRM) to evaluate entry stability in complex multiple-seam conditions is demonstrated. A coal mine under vari

    Jan 1, 2015

  • SME-ICGCM
    Rock Characterization Using Time - Series Classification Algorithms

    By Soheil Bahrampour

    Development of measurement while drilling (MWD) systems for ground control applications in mining applications has recently been an active research topic. The main goal is to utilize the drilling info

    Jan 1, 2014

  • SME-ICGCM
    Spreading of Ground Pressure Fluctuation in the Gob

    By Katya V. Babenko, Victor V. Nazimko

    We address the problem of the stochastic nature of ground pressure manifestation. Stress distribution in a rock mass and ground irreversible movement are governed with a set of random factors that aff

    Jan 1, 2017

  • SME-ICGCM
    Barrier Pillar Design for Safe and Productive Longwall Mining

    By Stephen C. Tadolini

    Effective barrier pillar design is an essential component for safe and productive underground coal mining. Barrier pillar design methodologies that incorporate sound engineering judgment have been use

    Jan 1, 2013

  • SME-ICGCM
    Development of a Fault-Rupture Environment in 3D: A Numerical Tool for Examining the Mechanical Impact of a Fault on Underground Excavations

    By Bo-Hyun Kim, Mark K. Larson

    "While faults are commonly simulated as a single planar or non-planar interface for a safety or stability analysis in underground mining excavation, the real 3D structure of a fault is often very comp

    Jan 1, 2018

  • SME-ICGCM
    Panel?scale Modeling of a Deep Longwall Panel: the MULSIM Alternative

    By Mark K. Larson

    Panel-scale modeling of stress changes induced by longwall coal mining is a challenging problem, particularly in deep mines of the western United States. Two common approaches to this problem are the

    Jan 1, 2013