Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
High Pressure Grinding of Gold Ore HPGR Demonstration at Newmont’s Lone Tree Mine
By Polysius AG
"The Lone Tree demonstration was an important milestone in bringing High Pressure Grinding Roll (HPGR) technology into hard rock applications in the mining industry. HPGRs have become standard equipme
Jan 1, 2005
-
Recent Changes at the Sarcheshmeh Copper Mine Flotation Circuit
By S. Banisi, M. Pourkani, A. Kargar, D. Hamidi, M. Sarvi
"Flotation circuit of the Sarcheshmeh copper mine, which processes 40,000 t/d of ore at 0.9% Cu, consists of rougher, cleaning and recleaning stages. To study the stage recovery of copper, one of the
Jan 1, 2001
-
The Recovery of Gold From Low Grade and Refractory Ores What's Next?
By P. D. Kondos, J. R. Goode
Given the global inventory of low grade and refractory gold deposits, processes that could turn these challenged deposits into mines are of considerable interest. Such gold deposits have low value and
Jan 1, 2005
-
Water Management Design for Cigar Lake Uranium Mine
By Ken Dyck Sr.
"Construction of the Cigar Lake uranium mine in northern Saskatchewan is well under way. Production is anticipated to begin in the first half of 2007. When in full production, the mine is projected to
Jan 1, 2006
-
The Use of Aurix®100 Resin for the Selective Recovery of Gold and Silver from Copper, Gold and Silver Solutions
By Tim Hughes, A. H. (Sandy) Gray, Jennifer Abols
"The selective recovery of gold and silver from solutions containing other metals such as copper is possible using AuRIX®100 resin in conjunction with the Gekko Resin Column. Selectivity is driven by
Jan 1, 2006
-
New Technologies for Improved Processing of Base and Precious Metals Containing Ores
By J. Lee, M. Peart, T. Bhambhani, D. R. Nagaraj, P. Riccio
"Over the past decade or so, our efforts have focused on developing the rationale and concepts for new technology in reagent development and optimization in the processing of base and precious metals.
Jan 1, 2013
-
Transforming Flow Sheet Design with Inert Grinding – the IsaMill
By K. E. Barnes
"The IsaMill was developed for fine-grained ores that required at least double the grinding efficiency of ball or tower milling to be economic. This was achieved, but in practice, the benefits of usin
Jan 1, 2006
-
An agent-based framework for open pit mine planning
By K. Awuah-Offei
Long-term production scheduling optimization has been a challenging issue for the mining industry because of the size and complexity of the problem. The current planning algorithms have limitations in
Jan 1, 2008
-
Applications of Oxide-Dispersion-Strengthened Aluminum Alloys in Organic-Cooled Power Reactors
By D G. Boxall
As an alternative to heavy water cooling, reactors cooled by organic liquids are being actively developed in Canada under the sponsorship of Atomic Energy of Canada Limited. One of the areas in which
Jan 1, 1965
-
Burr Project Potash Mine Development
Burr Mineral Resource has: ?Grade / Thickness / Tonnage ?Dry Caprock ?Low Carnallite ?Low Clay / Insolubles ?Flat & Continuous Deposit ?Proper depth
May 1, 2009
-
Commercial Aspects of Gold Applications : From Materials Science to Chemical Science
By Christopher W. Corti
A major aim of the GOLD 2003 conference, is to promote new gold related science and technology with a view to developing new useful industrial applications for gold. Current industrial uses have provi
Oct 1, 2003
-
Barrick Goldstrike Roaster Facility Engineering and Construction of the Goldstrike Roaster Facility
By Ray Walton, Ron Colquhoun, Ken Thomas, Dwayne Fentie, Barney Burke
"The new Roasting Facility at Barrick’s Goldstrike Mine in Nevada, U.S.A. was developed to process 12,000 tons per day of refractory gold ore. The process consists of crushing, dry grinding, roasting,
Jan 1, 2001
-
Recent Developments of Laser-Induced Breakdown Spectroscopy for Real-Time Measurement and Control of Mineral Processing
By Alain Blouin, Mohamad Sabsabi, Aissa Harhira, Paul Bouchard, Greg Lithgow
"The objective of this study was to demonstrate the application of Laser-Induced Breakdown Spectroscopy (LIBS) to the continuous analysis of online monitoring of Al, Mg, Ni, Mn, Si and Fe in nickel or
Jan 1, 2016
-
Diamond Exploration Targets, Michipicoten Greenstone Belt, Wawa, Ontario
By A. C. Wilson
In 1991, local prospector C. ?Mickey? Clement recovered at least three alluvial diamonds from the Michipicoten River. Two of these stones were sent to the Department of Mineralogy, Royal Ontario Museu
May 1, 2003
-
Evolution of Direct Coupled Pinion Drive Technology for Grinding Mills
By K. Lim, J. Sobil, L. Galarza Castillo, F. Tozlu
"For mining operations globally, the scale and criticality of the grinding mill drive has meant that selection of the correct mill drive technology is paramount. With so much depending on the successf
Jan 1, 2016
-
A Review of the Geology of Gold in Nova Scotia
By Milton C. Graves, Marcos Zentilli
"Gold has been reported from most geological environments in Nova Scotia; however, virtually all production (circa 2,000, 000 troy ounces; circa 60 tonnes) has come from that part of the province to t
Jan 1, 1982
-
Measurement of Ball Size Distribution in a 8 m x 5 m Primary Mill of Sarcheshmeh Copper Mine
By M. Pourkani, M. Karga, Samid Banis, Andre Laplante, G. Langari-Zadeh
"The Sarcheshmeh mine processes 40,000 t/d of ore grading 0.9% Cu and 0.035% Mo. Grinding is effected in single stage ball mills using 80 mm forged steel balls, with an average consumption of 850 g/t.
Jan 1, 1999
-
Silver in Canada in International Perspective
By J. G. George
A brief review of the silver industry is presented to set the stage for the analysis of the distribution of silver production by source from various types of mines in Canada and of the changing relati
Jan 1, 1977
-
Pipe Ore Processing Developments in the Thompson Mill
By P. G. Claridge, R. A. Tenbergen
"Pipe Open Pit ore is delivered by rail to the Thompson Mill at a rate of 34,000 tons per week. Ore is milled at a rate of 220 tons per hour.Characteristics of the serpentinised peridotite host rock a
Jan 1, 1975
-
Training and industry -Another Gap!
By J. E. Terry
This paper outlines the steps that are being taken to close the gap between training and industry and indicates areas in which more work needs to be done. Although based on experience in the Maritime
Jan 1, 1970