Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Intelligence for Grouting Balance

    By J. A. López-Molina, S. García, V. Castellanos-Pedroza

    "Grouting aims to reduce the permeability of rock mass below a predetermined value and has been widely used in rock engineering field for a long time. However, the injection procedure needs several em

    Jan 1, 2015

  • CIM
    Les Terrains Auriferes Site -Site Closure and Rehabilitation, Conceptual to Construction

    By R. Knapp, R. Firlotte

    "Les Terrains Auriferes (LIA) Property, formerly the Malartic Goldfield (Goldfield) mine, ceased its remaining milling operations in the fall of 1994. During the early years of mining, the mill proces

    Jan 1, 1997

  • CIM
    Grinding media evaluation at Brunswick Mining

    By R. Grant, C. Bazin

    "Brunswick Mining has investigated grinding media optimization for the purpose of improving the flotation feed and regrind product size distributions to enhance metal recoveries. This paper presents t

    Jan 1, 1994

  • CIM
    Using Laboratory Scale Flotation Testing to Predict Pilot Scale Flotation Performance

    By E. Amini

    "While methods exist to allow the simulation and optimization of existing flotation operations, there is a deficit in the ability to predict the performance of a new ore type pre-processing. A laborat

    Jan 1, 2009

  • CIM
    Aspects of Operational Mine Safety Assurance at the 4 South Mine, Quinsam Coal Mining Operation

    By Paul Krivokuca

    Outline Quinsam Coal Mine ?? Location ?? Mine History ?? Safety ?? Production ?? Hiring 4S Mine ?? Depillaring design ?? Structural mapping, Risk assessment ?? Rock Bolt Design Selection ??

    May 1, 2008

  • CIM
    Real-time Assisted Driving System in Open Pit Mining Operations using Google Earth

    By E. J. Sun

    The ADS system was developed to reduce accidents related to haul trucks operating under low visibility conditions in surface mining and construction sites, which is based on the GPS, mesh-wireless net

    Oct 1, 2009

  • CIM
    Developing Breakthrough Solutions to Complex Metallurgical Problems

    By B. K. Gorain

    "Mining of low grade deposits along with the necessity to design and operate process plants requiring high throughputs presents unique metallurgical environmental and sustainability challenges that ne

    Jan 1, 2015

  • CIM
    The Use of End Members for Grind – Recovery Modeling, Tonnage Prediction and Flowsheet Development at Raglan

    By L. Boyd, A. Charland, G. Potts, D. Fragomeni, N. O. Lotter

    "The Raglan orebody and concentrator has been the subject of study in Process Mineralogy at Falconbridge since 1998. (Lotter and Tuzun, 1998) The orebody is classified into three distinct textural gro

    Jan 1, 2005

  • CIM
    The Union Bay Platinum Prospect, SE Alaska, a Hydrothermal PGE Deposit

    By C. J. Van Treeck

    PGE concentrations of 18 g/t occur in the pyroxene rich rocks at the Union Bay Alaskantype complex. This PGE enrichment is hosted in magnetite veins. These veins cross magmatic layering and have an ir

    May 1, 2003

  • CIM
    How the Mining Industry is Responding to Pressures for Change in the Management of Mine Waste

    By Don Welch

    Pressures for change ?Land use constraints ?Project financing ?Local communities ?Environmental issues ?Sustainability requirements ?Stricter regulatory procedures ?Technical excellence ?Reduc

    May 1, 2010

  • CIM
    Design, Construction, and Start-up of Stillwater Mining’s East Boulder Concentrator

    By P. Lefebvre, J. Sargent, K. Major, B. Darnton

    "Stillwater Mining commenced mining operations at Nye, Montana in 1987 for the recovery of platinum and palladium. Exploration identified that the J-M Reef extended for 43 km. In 1998 Stillwater Minin

    Jan 1, 2003

  • CIM
    Shaft hoisting system for Olympic Dam

    1. Scope of project In South Australia, the Western Mining Corporation operates the underground copper and uranium mine Olympic Dam. The deposits concerned are enormous (approx. 570 million tons) and

    May 1, 2003

  • CIM
    Gyratory Crusher Wear Monitoring Using Laser Technology

    By Persio P. Rosario

    Crushing has proven to be of fundamental importance in mine mill integration at Highland Valley Copper (HVC). Highland Valley Copper has achieved large throughput and good quality control through the

    May 1, 2002

  • CIM
    Dust Control at Steep Rock Iron Mines Pelletizing Plant

    By P. S. Capper

    "Generally speaking, the most intensive efforts at dust control in the mining industry have, in the past, been concerned with underground operations and where uranium ore or high silica material is pr

    Jan 1, 1976

  • CIM
    Advantages of Tailing Disposal by Thickened Discharge

    By E. I. Robinsky

    "This paper describes a new, proven approach for tailing disposal. Not only is the disclosed system less damaging to the environment, it is also less costly to operate, to close down and maintain in p

    Jan 1, 1976

  • CIM
    Tyrethane for Screening Fabrication

    By S. L. Aaroe

    "TYRETHANE PRODUCTSTyrethane® is the family brand name which has been adopted by The W. S. Tyler Company of Canada, Limited to identify its polyurethane products. Since we have been manufacturing Wove

    Jan 1, 1976

  • CIM
    Kairos Mining: A Comprehensive Approach to Sustained Long-Term Benefits in Copper Processing Plant Automation

    By Luis Castelli, Aldo Bonomelli, Giselle Schifferli, Claudio Zamora

    "This paper introduces the operational concept and the description of a multi-site Remote Support Center for knowledge management and long-term process performance improvement.This centralized Support

    Jan 1, 2010

  • CIM
    Geomechanical Studies for Optimal Design of Post Pillars and Crown Pillar for Cut and Fill Mining in 124 OB at Birchtree Mine

    By D Reddy Chinnasane

    Outline Location of BirchtreeMine and Layout of 124 OB Cut and Fill Mining Background Purpose of the Studies Methodology Results and Analysis Conclusions and Recommendations

    Oct 1, 2010

  • CIM
    Improving Fine Particle Gravity Recovery through Equipment Behavior Modification

    By Claude Deveau

    "Studies on the performance of Falcon batch type concentrators treating ultrafine tantalum at Tanco have revealed that very fine heavy minerals are concentrated within certain areas of the concentrate

    Jan 1, 2006

  • CIM
    Aerophine® 3418A Promoter – The Canadian Collector – 50 Years of Improved Metallury in Various Applications

    By F. Bruey, T. Bruce, D. R. Nagaraj, W. Thomas, P. Riccio, E. Guitard

    "AEROPHINE® 3418A Promoter is a flotation collector that has been an industry standard in the Canadian mineral processing industry since its first commercial use at the Kidd Creek concentrator in 1980

    Jan 1, 2015