Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Sherrgold MacLellan Mill Design and Operation

    By R. A. Ozerkevich, R. J. Voisey

    "SherrGold's MacLellan V ne is located about five miles south east of Lynn Lake immediately to the east of the Keewatin River. (Figure # 1)The property is accessible by an all weather road, leading no

    Jan 1, 1987

  • CIM
    Industry-scale knowledge management\u2014RISKGATE and Australian coal operations

    By D. Sprott, P. A. Kirsch, J. Harris, D. Cliff

    This paper details the work of RISKGATE, the largest Australian Coal Association Research Program (ACARP) occupational health and safety initiative to date. The program is an interactive online risk m

    Jan 1, 2014

  • CIM
    Pneumatic Flotation as Key for the Ultra Fine Flotation of Different Ores and Minerals

    By Lutz Markworth, Evren Ören

    "The worldwide demand of ores and the depletion of the high-purity deposits make it necessary to recover ores in increasingly finer size fractions in the feed material. The flotation technology of mor

    Jan 1, 2009

  • CIM
    Review of 2004 JORC Code and Comparison with National Instrument 43-101

    By Patrick R. Stephenson

    The current version of the JORC Code was issued in 2004 and since that date the Australian Securities Exchange, in collaboration with JORC, has issued a number of companies? updates to provide guidanc

    May 1, 2010

  • CIM
    Development of Copper/Nickel Separation at INCO

    By P. Wells

    "In the past decade, there have been many developments in processing of nickel/copper sulfide ores. Improved pentlandite/pyrrhotite flotation selectivity with the use of new reagents, fine regrinding

    Jan 1, 2004

  • CIM
    Mitigating Brown Field Project Risks Using Advanced Simulations

    By S. Bellec, A. Berton

    "Usually, steady state mass balances are used for the design of mineral processing plants. However, this tool does not take into account the impact of process inputs variability nor does it evaluate p

    Jan 1, 2015

  • CIM
    Leaching Of Copper Flash Furnace Dusts with Weak Acid Bleed and Arsenic Precipitation as Scorodite and Arsenical Jarosite

    By A. Roca, G. Ríos, I. Ruíz, M. Cruells

    Flash Smelting Furnace (FSF) hot dust-laden is cooled in a waste heat boiler (WHB) and then dedusted in electrostatic precipitators (ESP’s) before being treated, together with the Peirce Smith Convert

    Jan 1, 2019

  • CIM
    X-Ray Tomography Study on the Effect of Porosity on Fatigue Crack Initiation and Propagation in AM60 Die Casting

    By Zhuofei Yang, Jidong Kang, David S. Wilkinson

    The fatigue behavior of AM60 high pressure die casting magnesium alloys was studied in a straincontrolled manner. The fatigue test was interrupted every 2,000 cycles for X-ray tomography scanning. The

    Jan 1, 2014

  • CIM
    In-track assessment of premium and intermediate grade rail steels

    By K. J. Griffin, G. W. Rosval

    "In our increasingly competitive market, attempts to improve productivity by increasing axle loads have placed more severe demands on rails. CP Rail thus requires stronger, tougher, and more wear-resi

    Jan 1, 1988

  • CIM
    Retention of Small Grinding Media inside Ball Mills

    By Jocelyn Bouchard, Claude Bazin, Sami Makni, Rolando Quispe

    "Finely disseminated minerals in ores require intensive size reduction to achieve sufficient liberation for the subsequent concentration process. The use of small grinding media in conventional ball m

    Jan 1, 2015

  • CIM
    Column Flotation in an Oilsand Application

    By Kim Wiwchar, Elizabeth Mbaja, Lynne Dang, Jim Furey, Anita Marks

    "Suncor Energy Inc., located north of Fort McMurray, Alberta, commenced pilot scale operation using a CPT 4’ diameter flotation column in March 2003. This larger scale trial follows two previously suc

    Jan 1, 2004

  • CIM
    Materials Challenges in Mine, Mill, and Smelters

    By N. Behnood

    "This paper describes how material selection, quality assurance, and failure investigation play important roles in the efficiency and safety of mining and metallurgical operations.INTRODUCTION Materia

    Jan 1, 2015

  • CIM
    Development of a 3D Modeling System For the Monitoring of the Daniel-Johnson Dam

    By Vincent Roy

    Numerous on going activities at the Daniel-Johnson Dam : ? Surveillance / monitoring ; ? Structural investigations & evaluation ; ? Injection work ; ? Crack mapping ; ? Instrumentation management

    Aug 1, 2013

  • CIM
    The Geological Setting, Mineralogy, and Paragenesis of Gold-Bearing Polymetallic (Cu+Co+Ag+Au+Bi±Pb±Ni±U) Veins of the Merico-Ethel Property, Elk Lake, Northeastern Ontario, Canada

    By I. Campbell, P. C. Jones, E. G. Potter, R. P. Taylor

    "The Cobalt embayment is a large domain of Paleoproterozoic clastic sedimentary rocks that unconformably overlies the Archean Abitibi greenstone belt. Regionally extensive sills and dikes of Nipissing

    Jan 1, 2009

  • CIM
    New trends in underground mine communications

    By Raymond C. Voige

    "The use of current electronic technology in the design of new underground mine communications equipment is providing improved and expanded voice communications which can, in turn, contribute to impro

    Jan 1, 1981

  • CIM
    Teck Corona Operating Corporation, David Bell Mine, Concentrator Operating Highlights

    By K. Meyer

    "INTRODUCTIONThe David Bell Mine Concentrator started production in April 1985. A staff of twenty-seven people operate and maintain the concentrator. The crew is grouped into the following main areas.

    Jan 1, 1989

  • CIM
    Towards Sustainable Mining - Made-in-Canada solution to driving environmental and social performance in mining

    About MAC ? The national organization of the Canadian mining industry ? Mining, smelting and refining of base and precious metals ? Mining of iron ore, diamonds, uranium, oil sands, coal and

    Aug 1, 2013

  • CIM
    Start-Up and Early Optimization of the New Afton Concentrator

    By C. O’Hara, S. Roy, K. Swedburg, J. Katchen

    "New Gold Inc.’s New Afton concentrator commenced operation in June 2012, producing a copper-gold-silver concentrate. During the first two years of operation, various optimization efforts have improve

    Jan 1, 2015

  • CIM
    Automation Technology to Increase Productivity and Reduce Energy Consumption in Deep Underground Mining Operations

    By J. A. Scott, K. Moreau, H. Shang

    "Trials of automated technology at underground mine sites around the world have reported increased production and the potential for lower energy consumption. Autonomous mining eliminates a range of de

    Jan 1, 2019

  • CIM
    Geologic Setting, Geochemistry of Alteration, and U-Pb Age of Hydrothermal Zircon from the Silurian Stog’er Tight Gold Prospect, Newfoundland Appalachians, Canada

    By G. R. Dunning, M. R. Wilson

    "Abstract - The early Paleozoic accretionary tectonic regime that was established along the Laurentian margin of the Newfoundland Appalachians provided a favorable setting for shear-hosted gold minera

    Jan 1, 2000