Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Chrysotile Asbestos: Relationship of the Surface and Thermal Properties to the Crystal Structure

    By Edward Martinez

    Due to its unique properties, chrysotile asbestos is used in many diversified applications. In recent years, a better understanding of the structure and properties of chrysotile has evolved due to the

    Jan 1, 1966

  • CIM
    Carbothermal Upgrading of the Awaso Bauxite Ore using Waste Polypropylene as Reducing Agent

    By F. Awotwe-Appiah, P. Koshy, A. Y. Fosu, J. Dankwah, J. R. Dankwah

    Ghana currently exports its bauxite raw without any value addition. Gradual depletion of high grade bauxite (with high alumina content) and the emergence of low grade bauxite (with high iron oxide con

    Jan 1, 2015

  • CIM
    Metallogenic Concepts in Gaspé

    By R. Marleau, R. Assad, J. Dugas

    "A study of the geological features of known occurrences of mineralization in Gaspe is the basis for a classification. Nickel, chromite, asbestos and some copper are pre-or syn-Taconic, whereas the mo

    Jan 1, 1969

  • CIM
    Operational Characteristics of the TankCell® 300 at Codelco's Chuquicamata Concentrator

    By S Grönstrand, C. Perez, A. B. Yañez, F. Coddou, P. Morales, H. Elgueta

    "The TankCell® 300 forced air flotation cell designed and built by Outotec, with active volume of over 300 m3, was installed at Codelco’s Chuquicamata concentrator in September 2008. After that, a pro

    Jan 1, 2010

  • CIM
    Shear Strength Assessment of a Footwall Slab Using Finite Element Modelling (8b2e89dc-c0b3-4744-93cc-ccc49b155f5c)

    By N. Bahrani

    Photogrammetry surveys were used to document a footwall slab failure that occurred at a surface coal mine located on the eastern slope of the Rocky Mountains. Photographs taken before and after the fa

    Jan 1, 2009

  • CIM
    Use of X-Ray Computed Tomography to Quantify the Diffrences in Cracks and Pores of Sphalerite Ore Particles when Comminuted using an HPGR and Cone Crusher for Heap Leach Feed Preparation

    Particles for heap leaching in conventional circuits are prepared using Cone crushers. Cone crushers are used to crush the ore to the size range between 12-25 mm for heap leaching operations. Leaching

    Jan 1, 2012

  • CIM
    Recent Changes in Milling Practice at Britannia

    By W. G. Hatch

    Introduction In November, 1927, a paper was presented at the Annual Meeting of the British Columbia Division by H. A. Pearse(l), in which he described the milling practice at Britannia and set forth

    Jan 1, 1932

  • CIM
    The Practice of Mining and Inclusive Wealth Development in Developing Countries

    By Frederick Bird

    This paper is based upon a review of studies of mostly Canadian mining companies in Chile, northern Canada, Tanzania, Guatemala, Ghana, Sierra Leone, and the Democratic Republic of Congo. In spite of

    Aug 1, 2013

  • CIM
    A geological appraisal of the coal resources of Nova Scotia

    By Peter A. Hacquebard

    Recent drilling programs have shown that the in-situ coal resources of Nova Scotia are very substantial. The grand totals of the measured, indicated and inferred categories amount to 232 m, 646m and 9

    Jan 1, 1979

  • CIM
    Increase of Productivity in a Magnesite Flotation Operation by Means of Selective Milling

    By A. P. Yovanovic, P. Bonadia, M. N. Moraes, C. F. Matos

    "The magnesite flotation operation of Magnesita Refractories, in Brumado – Brazil, has four parallel ball mills working in closed circuit with hydrocyclones to grind the ore for the reverse flotation

    Jan 1, 2016

  • CIM
    A New Approach to Accessing Gold in Arsenopyrite

    By R. Barbaroux, J. -M. Lalancette, D. Lemieux, K. Nasrallah, G. Garcia Curiel

    "Arsenic released from the lithosphere by mining and metallurgical activities is a growing global environmental concern. Dundee sustainable technologies (“DST”) has developed a processing technology t

    Jan 1, 2017

  • CIM
    Convert Hot Slag Directly Into Glass-Ceramics by Hot Slag Modification Process

    By Da-Qiang Cang, Qingde Wang, Wei Wang, Wen-Bin Dai, Min Guo, Yu Li

    Utilization of both slag and its heat for hot slag is a great challenge for iron and steel industry. Many methods of hot slag modification for directly converting hot slag into value-added materials w

    Jan 1, 2015

  • CIM
    Beneficiation of the Clear Hills Ironstone

    By T. H. Etsell, P. Kerr

    Over the past 50 years, there have been a number of geological, mineralogical and metallurgical studies carried out on the Clear Hills ironstone deposits in northern Alberta, Canada. Due to the low gr

    Jan 1, 2015

  • CIM
    Mine Ventilation From a Manager's Standpoint

    By Louis Frost

    MINE ventilation has for many years been the subject of intensive study by numerous investigators who have presented their findings in forms that are understandable to the average mining man, and all

    Jan 1, 1941

  • CIM
    Reducing Copper Losses In The Mitsubishi Process: A Pyrometallurgical Approach

    By F. Tanaka

    Copper losses to discard slag have long impacted on the profitability of copper smelters. Businesses based on the treatment of secondary materials have also revealed that copper losses are indices of

    Jan 1, 2007

  • CIM
    The Concentration of Barite-Fluorite Ores from the Lake Ainslie District, Nova Scotia

    By E. Lee Cameron

    The old mine workings on four barite-fluorite veins of the Lake Ainslie district, Nova Scotia, were opened recently and channel sampled. The samples were then forwarded to the Ore Dressing Laboratorie

    Jan 1, 1945

  • CIM
    Production of Thorium Concentrate from Egyptian Monazite

    By A. M. Abdel-Rehim

    The present work reports a study of production of thorium concentrate from Egyptian monazite by decomposition of ammonium carbonate solutions containing ammonium thorium and uranyl carbonate complexes

    Jan 1, 2004

  • CIM
    Derivation of Geotechical Parameters for Cut Wall Design at Banora Point, NSW Australia

    By N. T. Oo, L. D. Hutton

    "The Banora Point Upgrade Project is a 2.5km long six-lane divided freeway in northern New South Wales, Australia. The geology at the project area comprises a volcanic succession of variably weathered

    Jan 1, 2015

  • CIM
    Finite Element Simulation of Anisotropic Damage Around Pressurized Boreholes in Prefractured Shale

    By C. Arson

    "Optimizing hydraulic fracture injection parameters in order to maximize hydrocarbon extraction and to avoid extensive borehole spalling is still an open issue. In this paper, the Differential Stress

    Jan 1, 2015

  • CIM
    Precipitation Kinetics of an AlSi7cu3.5Mg0.1 Alloy with Zr and V Additions

    By Francis Breton, Daniel Larouche, Pierre Heugue, Rémi Martinez

    "Nowadays, in order to fit environmental restrictions, automotive markets are demanding cast aluminum alloys working at high temperature (180–300°C). New generations of alloys are required for higher

    Jan 1, 2018