Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Development Problems and Techniques in the Fort St. John Natural Gas Area

    By F. G. Vetsch, F. A. Ronaghan

    "Introduction1N THE FALL of 1951, Peace River Allied Fort St. John No. 1 well was drilled in Lsd. 1, Section 9 Township 83, Range 18, West of the 6th Meridian, on the flats of the north side of Peace

    Jan 1, 1954

  • CIM
    Making better use of carbon: Part II - The co-production of iron and liquid fuels

    By John H. Walsh

    "ForewordPart I of this paper, published in the March 1992 issue of the CIM Bulletin, surveyed the probable consequences of a limitation on the emissions of carbon dioxide to the atmosphere for the st

    Jan 1, 1992

  • CIM
    Flowsheet Development and Integrated Pilot Plant Testing for a Pyrochlore Bearing Carbonatite Ore

    By S. Kelebek, B. Ingram, C. Gibson, T. MacNeil, M. Aghamirian

    "The beneficiation and upgrading of pyrochlore from its ores is carried out through flotation. In industrial practice, upgrading is conducted in a two-stage flotation process in which pyrochlore flota

    Jan 1, 2016

  • CIM
    An evaluation of the recovery of free and unliberated mineral grains, metals and trace elements in the concentrator of Brunswick Mining and Smelting Corp. Ltd.

    By William Petruk, J. R. Schnarr

    The behaviour of minerals during flotation of a fine-grained pyrite-rich base metal ore was investigated by studying the feeds. concentrate and tailings from every flotation cell in the mill of Brunsw

    Jan 1, 1981

  • CIM
    Experimental and Modelling Research of Slag Properties in Nickel Laterite Smelting

    By Peter Hayes, Evgueni Jak, Taufiq Hidayat, Gary O’Connell, Denis Shishin, Jeff Chen, Francis Letarte

    "Knowledge of slag properties is required for the optimisation of smelting operations. The phase equilibria and viscosities of the Al2O3-CaO-FeO-Fe2O3-MgO-MnO-NiO-Cr2O3-SiO2 slags at conditions of int

    Jan 1, 2017

  • CIM
    Role of Technical Innovation on Production Delivery at the Polokwane Smelter

    By F. Stober, D. Wanblad, J. Ndlovu, L. R. Nelson, L. P. S. de Villiers

    The single six-in-line furnace of the Polokwane Smelter is the largest installed high-intensity furnace for platinum group metals (PGM) base metals sulphide smelting in the world. The furnace employs

    Jan 1, 2005

  • CIM
    Design of Backfill and Grouting Systems Used as Support in Polish Mines

    By J. Palarski

    In the Polish coal mining industry, the use of mine waste in underground backfill has been the most common means of providing ground support to minimize surface subsidence, increasing extraction ratio

    May 1, 2007

  • CIM
    Iron Ore in Canada: A Symposium

    By John Convey

    "IRON ORE was first smelted in Canada about the year 1736 at Les Forges, Quebec -a most appropriate name for such a historic locale. During these early years of the 18th, 19th, and first quarter of th

    Jan 1, 1955

  • CIM
    Operating Cost Budgets for Mines

    By Leonard Kellogg

    Introduction The Mine Manager or Superintendent is a man faced with a difficult problem. He must direct the activities of his mine in such a manner that, over a period of time, the greatest possible

    Jan 1, 1952

  • CIM
    Computer predictions of coal cleaning performance

    By Brian L. Beninger

    This paper discusses the application of the computer to coal preparation process predictions. In broad terms, the computer is used to perform two main functions. Firstly, the given float-sink analysis

    Jan 1, 1979

  • CIM
    Evaluation of Phospho-Gypsum for Gypsum Products Manufacture

    By R. K. Collings

    "This paper summarizes research that was done at the Mines Branch, Ottawa, to evaluate samples of phosphogypsum for gypsum products manufacture. The samples were from phosphate fertilizer facilities a

    Jan 1, 1972

  • CIM
    International mineral development a banker's view

    By P. D. Waters

    "Mineral deposits are where you find them; they have no allegiance to territorial boundaries. Over the past decade much of the new investment in mining has been outside of continental North America, l

    Jan 1, 1986

  • CIM
    Aerial Tramway Construction and Operation

    By Dale L. Pitt

    Introduction In opening up a new country, one of the most vital problems is that of transportation Without roads, railways, or water routes, development is very slow because these are the arteries

    Jan 1, 1930

  • CIM
    Construction of Headframe and Surface Plant: No. 1 Shaft, Jeffrey Mine, Canadian Johns-Manville Co., Limited

    By K. V. Lindell

    Introduction This paper describes a recent innovation in the design and construction of mine headframes. A reinforced concrete headframe was built by using sliding forms. A concrete headframe of

    Jan 1, 1948

  • CIM
    Cretaceous clay and sand deposits in central Nova Scotia

    By RALPH R. STEA, John H. Fowler

    Clay, quartz sand and lignite deposits overlie Carboniferous rocks in central mainland Nova Scotia. Recent evidence indicates that these deposits are fairly extensive. Sands consist of almost pure ang

    Jan 1, 1984

  • CIM
    Galvanic Interaction in Self-Heating of Sulphide Mixtures

    By J. E. Nesset, F. Rosenblum, J. A. Finch, R. Payant

    ABSTRACT Under certain conditions of moisture and oxygen, sulphides can spontaneously self-heat. We tested a hypothesis that galvanic interaction between some sulphides can promote self-heating. Galva

    Jan 1, 2012

  • CIM
    Anode Furnace Off-Gas NOX Emissions Improvements at Rio Tinto Kennecott

    By Arsenio Enriquez, Adrian Deneys, Ryan Walton, Jenny Esker

    NOx emissions at the Rio-Tinto Kennecott Copper (RTKC) smelter, near Salt Lake City, Utah, are regulated to a compliance emission limit at the Main Stack of 15.9 kg/hr on an annual rolling average. Th

    Jan 1, 2019

  • CIM
    Banking/Financing Viewpoint: Beyond the Feasibility Study

    By David Laing

    Completion of a Feasibility Study represents a major milestone in the development path of a mine, and one which typically triggers a need for project financing. Obtaining funding for construction reli

    May 1, 2010

  • CIM
    Distribution and Solubility of Platinum Group Metals in Slags

    By K. Yamaguchi

    "This Precious metals content copper scrap is treated with a copper smelting process, and copper and precious metals are recovered. The precious metal lost in the slag is increasing with increasing of

    Jan 1, 2012

  • CIM
    Engineered Completions Increase Oil Recovery

    By R. W. Coburn

    The results of field experiments on wells which required stimulation indicated that engineered well-completions will cause an increase in ultimate recovery at reduced costs. Techniques and tools have

    Jan 1, 1960