Search Documents

  • AUSIMM
    Optical Computing Systems Applied to Engineering and Geological Fabric Analyses

    An optical computing system was used to determine spacings and frequencies in geological fabrics and engineering joint fabrics.Three-dimensional arrays of joints were plotted on an equal-area net. Dir

    Jan 1, 1970

  • SAIMM
    An expert system approach in rock engineering risk assessment

    By A. V. Z. Brink

    Rock engineering risk is defined in this paper as a function of the potential ground motion; the vulnerability of the workplace; exposure of people; and a general term – quality of information. The pa

    Jan 1, 2003

  • DFI
    Some Developments On Laterally Loaded Piles With Particular Reference To P-Y Subgrade Reaction Method - Resume:

    By A. L. Garassino

    Dans cet article on parle sortout de l'approche de calcule pour les pieux charges horizontalement avec particuliere reference aux curbes p-y et è une solution semi-empirique qui prende en conside

    Jan 1, 1994

  • NIOSH
    OFR-211-83 Recommendations For Human Factors Research And Development Projects In Surface Mining

    By Ernest J. Conway

    Seventy-four human factors research and development projects were identified for possible Bureau funding. The projects were based on (1) literature surveys, (2) reviews of accident statistics and repo

    Jan 1, 1982

  • AUSIMM
    Risky Business: The Essential Blending of Financial and Scientific Skills in the Modern Resources Sector

    Modem mineral exploration and development takes place within a data-rich context underpinned by a wide range of data acquisition, processing and interpretation technologies. This leads to requirements

    Jan 1, 1997

  • NIOSH
    RI 7202 Comparison Of Trip Lights And Reflectors

    By R. H. Oitto

    To determine whether reflectors could substitute for the trip lights referred to in the Federal Mine Safety Code, the Bureau of Mines studied trip safety devices under simulated haulageway conditions.

    Jan 1, 1968

  • SAIMM
    The ROMA Project (Resource Optimization And Recovery In The Material Industry) ? A Typical Cooperation Project In Norway

    By M. Tangstad

    Keywords: Pyrometallurgy, ROMA, Norway, furnace, fines The ROMA project is a competence project on optimizing the usage of raw materials and energy in the ferromanganese, silicon, and aluminium in

    Jan 1, 2011

  • SAIMM
    The Impact Of Mixed Fleet Hauling On Mining Operations At Venetia Mine

    By J. Krzyzanowska

    Paper written on project work carried out in partial fulfilment of Bachelor of Engineering-Mining Venetia Mine, an open-pit diamond mining operation in the Limpopo Province of South Africa, current

    Jan 1, 2007

  • RMCMI
    MSHA of the Future

    By Laura E. Beverage

    The Changes 2008 Brought -MSHA recently posted a PowerPoint to its website which shows statistical performance information for fiscal years 2000 to 2008. -Interesting statistics: Fatality rat

    Jan 1, 2009

  • ISEE
    Sappington Bridge: An Opportunity for Strengthening Research and Demolition Training

    By J. Baird

    The Sappington Bridge, a steel arch span bridge constructed in 1904 over the Meramec River, was demolished due to its advanced state of deterioration. The demolition was a project to benefit Crawford

    Jan 1, 2003

  • CIM
    Recovery of Lanthanides from Apatite Phosphogypsum

    By Cz. Mora, A. Pawelczyk, D. Hreniak, P. Nowak, A. Dyonizy, S. Strek, W. Strek, K. Grabas, A. Ostrowski

    Globalization and a growing demand for limited raw material resources have forced changes in the approach to the supply chain. This is particularly true in the case of rare earths, which are regarded

    Jan 1, 2014

  • AIME
    Extractive Metallurgy Division - Debismuthizing of Lead

    By T. R. A. Davey

    The fundamental principles by which bismuth may be removed from lead by pyrometallurgical processes are enumerated. Qualitative discussion of the phase diagrams concerned is followed by presentation o

    Jan 1, 1957

  • SME-ICGCM
    Analytical Investigation of Shaft Damages at West Elk Mine

    By Tim Ross

    Several shear failures were observed in Shaft #1 at the Mountain Coal Company, LLC, West Elk Mine, after mining longwall Panel 23, 1,100 ft to the east of Shaft #1. It was speculated that this shear

    Jan 1, 2006

  • ISEE
    Portable, Multi-Channel and Continuous Velocity of Detonation Recorders (122b6f71-61a6-4f23-afba-c5878df1df8c)

    By Jackson R. Pressley, Bruce Vandenberg

    The knowledge of how and when your explosives go off can help you make intelligent decisions regarding future application of explosives thus removing some of the black magic associated with blasting.

    Jan 1, 1992

  • SME
    Technology News – Atlas Copco Wagner Announces Improved 10-t LHD

    Atlas Copco Wagner launched its ST1010 Scooptram load haul dumper. The ST1010 replaces the company’s Wagner ST-1000 Scooptram. The improvements to the Wagner ST1010 include increased reliability, ea

    Jan 1, 2000

  • DFI
    Experiences From The Italian High Speed Rail Network AV Construction

    By Vincent Jue

    In December 2009, the Italian High Speed Rail Network AV began running over the full 1000 km system length from Turin, at the foothills of the Alps to Salerno, on the seacoast south of the volcano Mt.

    Jan 1, 2010

  • SME
    Design And Construction Challenges Of Hard Rock TBMS At The Gotthard Base Tunnel

    By Michael Rehbock-Sander

    The Gotthard Base Tunnel (GBT) is 57 km (35 miles) long and consists of two par-allel single-track tubes with an ex-cavation diameter ranging from 8.8 to 9.5 m (28.8 to 31.2 ft). These are interlinked

    Jan 1, 2012

  • SME
    Seismic Upgrades of the Claremont Tunnel

    By Bill Cain, R. John Caulfield, D. Scott Kieffer

    The East Bay Municipal Utility District is undertaking seismic upgrades of the Claremont Tunnel in the San Francisco Bay area. The tunnel carries treated water across the active Hayward Fault to suppl

    Jan 1, 2001

  • AUSIMM
    Numerical Modelling of Monorail Support Requirements in Decline Development

    This paper discusses support requirements for the proposed monorail system to be used in decline development. The monorail drilling and loading systems are systems that move on the rail (monorail) ins

    Dec 6, 2010

  • ISEE
    Field Applications and Quantification of Electronic Detonator Technology (f6aba4f2-0ecc-4a09-a9b0-132d9c5ded54)

    By Douglas Bartley, Brian Wingfield, Robert McClure

    Recent studies and limited tests indicate favorable results utilizing high accuracy electronic detonator technology over conventional non-electric pyrotechnic systems. This study discusses the applica

    Jan 1, 2000