Search Documents

  • SME
    Mine Preplanning

    By Christopher J. Bise

    INTRODUCTION Before a mine is planned in detail, a preliminary analysis is often conducted. This preplanning permits the mining engineer to make a rapid assessment as to whether or not a particula

    Jan 1, 1986

  • AUSIMM
    The Port Hedland FINMET« Project - Fluid Bed Production of High Quality Virgin Iron for the 21st Century

    By Mayfield P. L J, Honeyands T. A

    BHP's two million tonne per annum nominal capacity Hot Briquetted Iron (HBI) plant at Port Hedland in the Pilbara region of Western Australia is based on FINMET¦¦ direct reduction technology. T

    Jan 1, 1999

  • AUSIMM
    The Research on Refined Gold Bullions Surface Upgrading

    The Research on Refined Gold Bullions Surface Upgrading

    Sep 13, 2010

  • AUSIMM
    Water Treatment at Waikato North Head Mine Site

    By B Orchard

    New Zealand SteelÆs Waikato North Head mine, situated at the mouth of the Waikato River, supplies approximately 1.2 million tonnes per annum of titanomagnetite concentrate to the Glenbrook steel mill.

    Jan 1, 2002

  • SAIMM
    The Impact Of Platinum Production From Ug2 Ore On Ferrochrome Production In South Africa

    By J. Basson, L. R. Nelson, L. A. Cramer

    The South African based platinum mines produce the world?s majority of platinum metal that is used in autocatalysts and jewellery. As the platinum market is forecast to grow at healthy rates into the

    Jan 1, 2004

  • SAIMM
    Tensile Strength Testing Of Thin Spray-On Liner Products (TSLs) And Shotcrete

    By H. Yilmaz

    Tensile strength testing has been one of the most common physical property testing methods of thin spray-on liner (TSL) products worldwide. However, the variety of products tested has been insufficien

    Jan 1, 2010

  • DFI
    Soil Improvement Using Soil Mixing – An Alternative Way for the Indian Market

    By Franz-Werner Gerressen

    "The use of soil improvement to utilize areas, which are not suitable for foundation purpose, has a long tradition. Due to the increasing demand of foundation works in areas of unsuitable soils, the i

    Jan 1, 2017

  • IOM3
    Prediction of drill-bit performance using multi-variable linear regression analysis

    By A. Ersoy, M. D. Waller

    The principal factors which require consideration in predicting drilling rates are the bit-type, the bit operating parameters and the characteristics of the penetrated rock. A single index is not a su

    Aug 1, 1995

  • CIM
    Humus and till geochemistry over the Doyon, Bousquet and Williams gold deposits

    By C. F. Gleeson, D. G. Sheehan

    "The results of humus and overburden geochemical surveys over the Doyon, Bousquet and Page-Williams gold ore deposits are presented.These studies show that humus sampling for gold gives negative resul

    Jan 1, 1987

  • AUSIMM
    The Autogenous Fine Grinding Kelsey Axial Displacement (KAD) Mill

    The Autogenous Fine Grinding Kelsey Axial Displacement (KAD) Mill The marginal improvements which continue to be made to fine grinding practices have exposed the limits of conventional technologies a

    Sep 13, 2010

  • SME
    An Analysis Of Subsidence Movements Associated With An Abandoned Shallow Room-And-Pillar Coal Mine

    By Yoginder P.

    ACKNOWLEDGEMENTS Authors sincerely appreciate the interest, cooperation and technical support of the coal company management and staff in conducting the study. Without their assistance this study

    Jan 1, 1986

  • AUSIMM
    The Geology of the Pilbara Block, Western Australia

    The Pilbara Block is a nucleus of Archaean rocks which lies in the North West Land Division of Western Australia, and it constitutes a mineral province that has been divided into two areas-the West Pi

    Jan 1, 1965

  • SAIMM
    Pirometallurgical Treatment Of Titanomagnetite Ore From The Ural Region

    By A. V. Roschin, V. E. Roschin

    Composite ores are more often used for production of iron in connection with reserve depletion of traditional ore crude in the regions with developed metallurgy. In particular, the majority of perspec

    Jan 1, 2007

  • AIME
  • AUSIMM
    The Development of the Dudley Seam at Burwood Colliery

    A brief review is given of the history of the Colliery to date together with the reasons for the development of an additional seam.Investigations into the quality of the coal ami its suitability for t

    Jan 1, 1958

  • AUSIMM
    A Simulation Approach for the Comparison of In-Pit Crushing and Conveying and Truck-Shovel Mining Methods

    In-pit crushing and conveying (IPCC) is being increasingly considered as an alternative to traditional truck-shovel mining methods. The move towards IPCC is driven by a number of factors including the

    Dec 6, 2010

  • SME
    Solution Mining of Nahcolite at American Soda’s Yankee Gulch Project

    By Charlie Yates, Max Ramey, Kurt Nielsen, Michael Hardy

    The Yankee Gulch sodium minerals project (YGP) is a solution mining project operated by American Soda. The mine operates on a federal lease administered by the U.S. Bureau of Land Management (BLM).

    Jan 1, 2003

  • AUSIMM
    Element abundance data for Australian oil shales

    By Fardy J. J

    Abundance data are presented for a comprehensive range of elements in oil shale samples from deposits located in Queensland. The techniques of instrumental neutron activation analysis and spark source

    Jan 1, 1986

  • CIM
    Energy Initiatives Ontario Operations

    Ontario Operaations Mining Garson Stobie Copper Cliff North Copper Cliff South Creighton Mcreedy East Milling Clarabelle Mill Smelting Smelter Matte Processing Anode Casting Refining Co

    May 1, 2007

  • SME
    Analysis of the Controlled Deformation in Rock and Soil (A.DE.CO.-RS)–Tunneling Approach Performance of an Alternate Tunneling Approach in the Construction of 100 Kilometers of Tunnel for the Bologna to Florence High Speed Rail Line

    By Silvano Morelli, Giovanna Cassani, Renzo Bindi, Antonio Nicola

    More than 70 km of main line and service tunnels have been excavated to date for crossing the Apennines between Bologna and Florence. A new design and construction approach, known as Analysis of t

    Jan 1, 2003