Search Documents

  • CIM
    Rejection of Uranium from a Copper Gold Ore by Flotation (1d1c391d-4ab9-408d-ad31-42faa02f60e9)

    By F. Ford, J. Dong

    "Laboratory and miniplant testwork was carried out to reject uranium from an Iron Oxide Copper Gold (IOCG) deposit that contains an average of 60-70 ppm uranium with high variability. The dominate cop

    Jan 1, 2017

  • IIMP
    Uso de la Geosoft en la prospección geoquímica regional

    By Jorge Chira

    INGEMMET realizó el proyecto “Estudio de los Recursos Minerales del Perú” con el objetivo de identificar las áreas prospectivas para propiciar actividades de exploración minera por parte de la empresa

    Aug 25, 2002

  • CIM
    Development of the SII “Mission” Mineral Sands Project

    By D. Settles, R. Rose, P. L. Dunn

    "A new mineral sands operation is being developed in Georgia by Southern Ionics, Inc. (SII). Prevailing mineralogy and certain design constraints required detailed testing and circuit analysis to cre

    Jan 1, 2015

  • SAIMM
    Implementation Of An Alternative Matte-Level Measurement Solution At Lonmin Marikana Smelter Division For Improved Process Monitoring

    By T. J. Goff

    Keywords: accurate control, matte level, smelting operations, process control, tapping, sounding bar, electromagnetic measurement [ ] Accurate control of matte levels during primary matte smelting

    Jan 1, 2011

  • SAIMM
    Blast fragmentation optimization at Tarkwa Gold Mine using 6 Sigma methodologies

    By A. Amiel

    Tarkwa Gold Mine is owned by Gold Fields Ghana, IAMGOLD and the Government of the Republic of Ghana in a 71%, 19% and 10% ratio. The mine is operated by Gold Fields Ghana. This large, low-grade, open

    Jan 1, 2008

  • AUSIMM
    BHP Iron Ore Protocol for Mine Closure

    By Hillis R

    As part of BHP Iron Ore's policy and goal of achieving a high standard of environmental management within its operations, a protocol for mine closure has evolved. The need to demonstrate sound

    Jan 1, 1996

  • DFI
    Lake Champlain Temporary Ferry Dock Fast-Track Design And Construction Challenges And Successes

    By John E. Lens

    Minutes after the Friday afternoon October 16, 2009 announcement that the 80 year old Lake Champlain Bridge was closed to traffic out of concern for public safety, emergency detour planning started at

    Jan 1, 2011

  • NIOSH
    OFR-10-72 A Mathematical Model Simulating Flow Of Methane And Water In Coal ? Introduction

    By H. S. Price

    This report discusses the development of a mathematical model that describes the flow of methane only and methane and water in a coal bed during mining operations. Because of the complex geometry, bou

    Jan 1, 2012

  • NIOSH
    RI 7328 Coal Investigations Using Laser Irradiation

    By F. S. Karn

    Conditions necessary to obtain optimum yield of useful products when coal is rapidly heated to extreme temperatures by laser irradiation were determined by the Bureau of Mines. Product distribution an

    Jan 1, 1970

  • IIMP
    Modelo conceptual de desarrollo del proyecto minero Antapaccay - Xstrata Tintaya S.A.

    By Edgardo Orderique

    El presente texto describe el modelo de desarrollo del proyecto minero Antapaccay, de forma que cada etapa en el proceso de determinación de reservas, sea rigurosamente evaluada y estimada. La secuenc

    Sep 9, 2007

  • AUSIMM
    A batch elutriation technique for the density-based fractionation of iron ore

    By D M. Hunter, S M. Iveson, K P. Galvin

    For low density materials such as coal, density-based fractionation of particles via the sink-float method is relatively simple due to the availability of liquids of suitable density; however, for hig

    Jul 24, 2017

  • NIOSH
    An Assessment Of Engineering Noise Controls At A Talc Processing Plant

    By E. R. Spencer, E. Reeves

    National Institute for Occupational Safety and Health (NIOSH) researchers conducted an investigation to quantify sound levels and to determine the amount of sound reduction provided by engineering noi

  • ISEE
    Rotary Drilling--An Analysis of the Equation Drill+Drill Steel=Productivity

    By Nils Heinke, Stephen M. Collinsorth

    To anyone who is responsible for the production of blast holes, who is looked to on a daily basis for drill maintenance and performance, whose bottom line may depend on the survival of the mine itself

    Jan 1, 1998

  • NIOSH
    IC 8197 Methods And Costs Of Exploration And Pilot Plant Testing Of Ilmenite-Bearing Sands, Lakehurst Mine, The Glidden Co., Ocean County, N. J.

    By Richard Quirk

    This report describes methods and techniques employed by The Glidden Co. of Cleveland, Ohio, in explorating an ilmenite-bearing sand deposit in Ocean County, New Jersey, during 1960 to determine ore r

    Jan 1, 1963

  • NIOSH
    OFR-41-84 Recommended Guidelines For Oxygen Self-Rescuers -Volume IV -Underground Non-Coal Mining

    By D. Randolph Berry

    The United States Bureau of Mines (USBM) awarded a contract to Foster-Miller, Inc. to develop guidelines for the storage and use of Self-Contained Self-Rescuers (SCSRs) in underground non-coal mines.

    Jan 1, 1983

  • ISEE
    Calibration of a Fragmentation Model for a New Mining Operation

    By Cristian Rodriguez, Tom BoBo, Maria Rocha, John Kemeny

    Blast fragmentation depends on many factors. First of all, it depends on the specific blast design, which includes the amount and type of explosive, the blasting pattern, the timing and sequencing, an

    Jan 1, 2014

  • NIOSH
    RI 8761 Effect of Asymmetric Wear of Point Attack Bits on Coal-Cutting Parameters and Primary Dust Generation

    By Wallace W. Roepke

    The Bureau of Mines conducted a series of experiments using Illinois No. 6 coal to determine the effect of asymmetric wear on airborne respirable dust (ARD), specific energy, cutting force, and normal

    Jan 1, 1983

  • SME
    Underground Mine Stream Crossing Assessment: A Multidisciplinary Approach

    Underground mine designs typically try to avoid extraction beneath streams and rivers of any significant size, especially when the overburden rock thickness between the stream bed and the mine is thin

    Jul 28, 2020

  • SME-ICGCM
    Load Determination For Long Cable Bolt Support Using Computer Aided Bolt Load Estimation (CABLE) Program

    In this paper a numerical formulation is presented for determination of the axial load along a cable bolt for a prescribed distribution of rock mass displacement. Results using the program CABLE indic

    Jan 1, 1996

  • SME-ICGCM
    Characteristics of Coal Bursts in the North Fork Valley of the Gunnison River Valley, Colorado

    By Christopher Mark

    A coal burst is defined as the sudden, violent ejection of coal or rock into a mine opening. Coal mines in the North Fork Valley (NFV) of Colorado?s Gunnison River have a long history of coal bursts i

    Jan 1, 2012