Search Documents

  • NIOSH
    OFR-162(2)-83 Mining In Low Coal - Volume II: Anthropometry

    By M. M. Ayoub

    This volume is the second of three volumes comprising the final report of the research project "Biomechanics of Low Coal." It covers only the anthropometric study of low coal miners. Volume I summariz

    Jan 1, 1982

  • SME
    Characterization Of Coal And Quartz Dust In Interior Basin Coal Mines

    By Y. Paul Chugh

    NIOSH and the Illinois Clean Coal Institute are funding studies on characterization of coal and quartz dust in Interior Basin mines since 2009. Coal dust characteristics vary significantly and, are vi

    Jan 1, 2011

  • CIM
    Raw Water Supply: The Experience of Cerro Verde

    By Ken Wood

    "A reliable source of water of an acceptable quality is vital to the success of any mineral processing plant using wet methods. For Cerro Verde, a new 108,000 t/d copper mill in southern Peru, the mai

    Jan 1, 2008

  • CIM
    Salitre Project Brazil

    By Roberto Busato Belger

    - Fertilizer Business Overview - Supply -Demand Balance in the World - Supply -Demand Balance in Brazil - Brazilian Market Growth Opportunities - Fosfertil Operations - Fosfertil Expansion Plan

    May 1, 2010

  • NIOSH
    OFR-53-76 Properties Of Coal-Water Slurries

    By R. R. Faddick

    Properties of coal-water slurries were studied in two separate phases: a rheological phase and a pipeline phase. The purpose of the study was to investigate the rheology of fine coal slurries to deter

    Jan 1, 1974

  • NIOSH
    OFR-25(2)-74 Improved Sensors And Fire Control Systems For Mining Equipment - Phase II - Final Report - Executive Summary - I. Introduction, Summary, And Results - Introduction

    U.S. Bureau of Mines contract H0122053, "Improved Sensors and Fire Control Systems for Mining Equipment", was an investigative effort involving: ? Study of the fire problem on large mobile mining e

    Jan 1, 1973

  • NIOSH
    OFR-30-84 Influence Of Rock Discontinuities On Coal Mine Subsidence

    By Kevin M. Connor, O&apos

    This report documents-the process of literature review, site selection, instrument installation, data acquisition, and preliminary data reduction performed to evaluate the influence of rock mass disco

    Jan 1, 1983

  • AUSIMM
    Estimation for Engineering Design Purposes of the Principal Stress Directions in Rocks Containing Residual Strains

    Unrelieved residual strains can influence the states of stress in rock masses. If cheap, stable structures are to be constructed in Tock in which large pressures are exterted by unrelieved residual st

    Jan 1, 1964

  • CIM
    Study on the Impact of Using Cyclones Rather than Screens in the Grinding Circuit at Niobec Mine

    By Y. Sasseville

    "Niobec has been using vibrating screens and screw classifiers as a double stage classification in its grinding circuit since the very beginning of its operation in St-Honoré. Most of the other minera

    Jan 1, 2015

  • NIOSH
    Dangers of Toxic Fumes from Blasting

    By Richard J. Mainiero, James H. Rowland III, Marcia L. Harris

    This paper reviews the potential hazards posed by the toxic fumes produced by detonating explosives in surface mining and construction operations. Blasting operations produce both toxic and nontoxic g

  • NIOSH
    OFR-41(2)-74 Detection And Location Of Entrapped Miners By Seismic Means: Methods And Computer Programs - Volume II

    By S. J. Duda

    Procedures for detecting and locating seismic sources are adapted to the case of entrapped miners. During an emergency the entrapped miner is likely to generate seismic signals, by knocking against th

    Jan 1, 1973

  • SME
    Exploration (2303cc71-ebf3-44eb-bd90-42769f9f3467)

    By D. R. Wilburn

    The worldwide budget for nonferrous, nonfuel mineral exploration was expected to increase by 58 percent in 2004 from the 2003 budget, according to Metals Economics Group (MEG) of Halifax, Nova Scotia.

    Jan 1, 2005

  • CIM
    Replacement of Classification Screens with Cyclones in the McArthur River Uranium Mine Grinding Circuit

    By Ken Dyck, Chuck Edwards

    "Cameco's McArthur River is the world's largest high grade uranium mine. Production started in late 1999. Cameco carried out the engineering design and construction management for the McArthur River p

    Jan 1, 2004

  • AUSIMM
    Recent Advances in Porphyry Copper Geology and Their Exploration Utility

    By R H. Sillitoe

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. Geological concepts are employed routinely in porphyry copper exploration at the area selec

    Mar 18, 2015

  • NIOSH
    OFR-16(1)-80 Three-Dimensional Finite Element Analysis Of Crosscut And Entry Intersection Of A Double - Entry Coal Mine

    By M. B. Balachandra

    A three-dimensional finite element analysis was performed of an instrumented section of a double-entry coal mine in order to provide a comparison between field measurements and existing analytic techn

    Jan 1, 1976

  • SAIMM
    Limestone quarry quality optimization for a cement factory in Turkey - Synopsis

    By A. H. Onur

    Many factors govern the size and shape of an open pit, and these must be properly understood and used in the short and long-term planning of any open pit and quarrying operation. The importance of eac

    Jan 1, 2008

  • CIM
    Rougher Flotation Improvements at P.T. Freeport Indonesia’s Grasberg Operation

    By Harry Siewert

    "The commissioning of the 4th concentrator (C4) at Freeport Indonesia in early 1998 increased total mill throughput from 130k to 230k tonnes per day. The C4 flowsheet consists of a single 38 ft diamet

    Jan 1, 2001

  • AUSIMM
    The System of Costs Keeping at the Broken Hill Junction North Mine

    By Ross R

    Although mining is an old industry its management is quite a new science, and its complications are now being recognised as demanding expert knowledge in many branches of technical and professional ed

    Jan 1, 1912

  • AUSIMM
    Grinding Mill Operation and Maintenance - Central to Asset Management

    Grinding Mill Operation and Maintenance - Central to Asset Management Since 2005, RME has pursued a vision for a new grinding plant operational paradigm, made possible by RME's latest Mill Relin

    Sep 13, 2010

  • DFI
    Caisson Design And Construction, Upstream Guide Wall, Locks And Dam No. 26

    By E. C. Demsky

    This paper describes the large diameter caisson foundation for the upstream guidewall at the Lock and Dam No. 26 (Replacement) Project. The guidewall is supported on two rows of 1.8-m diameter concret

    Jan 1, 1989