Search Documents

  • NIOSH
    IC 8050 The Pacific Northwest Ferroalloy Industry ? Introduction And Summary

    By Gary A. Kingston

    Low-cost hydroelectric energy in the Pacific Nortnwest has been an important factor in the development of a ferroalloy industry. Eleven companies, employing approximately 1,000 persons, produce about

    Jan 1, 1962

  • IOM3
    Oxidation of silver-copper selenide matte in copper-anode slimes smelting

    By G. G. Barbante

    The oxidation behaviour of selenide matte with a substantial Cu content and low Ag differs significantly from that of high-Ag matte. Low-Ag selenide mattes display a large oxygen solubility and the up

    Jun 19, 1905

  • AIME
    Mining - Mechanics of Rock Slopes

    By D. H. Trollope

    In engineering in general, close agreement between theoretical predictions and structural performance is rare—this is particularly true in rock slopes. Since the complexity of natural arrangements mak

    Jan 1, 1961

  • AUSIMM
    Prediction of Subsidence Over Partial Extraction Systems in Coal

    This paper reviews the current techniques employed in the prediction of subsidence and how they have been applied to partial extraction systems. The method using influence functions to describe the sh

    Jan 1, 1991

  • AUSIMM
    The Ediacara Mineral Field (8ccd4256-9862-4469-8844-6bf46021794c)

    The Ediacara mineral field is classified as a Mississippi Valley type deposit with stratiform mineralization near the base of the Cambrian beds. Mineral deposition was contemporaneous with sedmentatio

    Jan 1, 1963

  • AUSIMM
    Applied Mineralogy of the Kevitsa Nickel-Copper-PGE Deposit, SodankylS, Northern Finland

    By F Gervilla, J Laukkanen

    The Kevitsa Ni-Cu-PGE deposit in northern Finland contains disseminated Ni-Cu-Fe sulfides, and platinum-group minerals (PGM). The 2.05 Ga-old ultramafic-mafic, funnel-shaped intrusion is intruded into

    Jan 1, 2008

  • NIOSH
    IC 8932 Costs And Effects Of Environmental Protection Controls Regulating U.S. Phosphate Rock Mining

    By Ronald F. Balazik

    This Bureau of Mines study identifies and examines the costs of Federal, State, and local environmental protection controls on domestic phosphate rock mining, The costs include the expenditures needed

    Jan 1, 1983

  • AUSIMM
    Long-term Stability of Mine Tailings, Macraes Mine, Otago: Comparison to a Geological Analogue

    By D Craw

    Bulk ore tailings from the Macraes gold mine gold extraction process are stored in a large (ca 0.6 km2, 80 m deep) mixed tailings impoundment whose pH is maintained near 8 by natural rock neutralizing

    Jan 1, 2000

  • SAIMM
    The Distribution Of Metallic Elements In Granulated Nickel Converter Matte Phases

    By E. L. Thyse

    Keywords: Pyrometallurgy, converter, nickel, matte, distribution Metallic elements occupy a wide range in granulated nickel converter matte phases. The distribution of these metallic elements, pa

    Jan 1, 2011

  • AIME
    Part II – February 1969 - Communication - Nickel Activity Data in the Nickel-Aluminum System at 1000°C

    By A. U. Seybolt, R. E. Honnemon

    THE purpose of this communication is to present activity data of nickel in the Ni-A1 binary system that was obtained for oxidation studies in this system. This data has been calculated from previous

    Jan 1, 1970

  • AUSIMM
    Copper Reduction from Solution With Copper Sponge

    The observation of lower-than-predicted Fe/Cu ratios in the cementation of copper on iron in tests at elevated temperatures indicated that some other reaction was contributing to the reduction of cupr

    Jan 1, 1974

  • SAIMM
    Underground storage in Sydney, some uncommon rock mechanics features of an uncommon project in Australia

    By N. Gatelier, T. You, J. C. Kandel

    ABSTRACT: Underground hydrocarbons storage is a very specific domain for the designer. He is usually free to adjust the section, shape and layout to cope with the geological and geotechnical condition

    Jan 1, 2003

  • TMS
    Effect of Refractive Index on the Determination of Layer Thickness of 4H-SiC Homo-Epitaxial Films

    By Zhiyun Li

    Room temperature infrared reflection spectra of 2 n-type homo-epitaxial epifilms have been measured in the work. The effect of the refractive index on the determination of layer thickness using tradit

    Jan 1, 2010

  • SAIMM
    Improved Understanding Of Explosive?Rock Interactions Using The Hybrid Stress Blasting Model ? Synopsis

    Since 2001, the Hybrid Stress Blast Model (HSBM) project members have developed a software suite to model the complete blasting process from non-ideal detonation to muck pile formation. To preserve th

    Jan 1, 2012

  • AUSIMM
    Large Excavations in Weak Mudstone for the Porgera Mine Plant Development

    The plant and processing site at Porgera has been built on a levelled mudstone ridge about lkm E of the mine. Excavation of 7xl06m3 of soil and rock was necessary to achieve the required area. The

    Jan 1, 1991

  • AUSIMM
    Thermodynamic and Phase Diagram of the Lead-Lead Sulphide Binary System

    The published liquidus data on the Pb-PbS system have been correlated on the basis of one-coefficient Margules equations. Thermodynamic properties of the components of this system have been obtained,

    Jan 1, 1972

  • SME
    Effects Of Joint Persistence On Jointed Rock Masses

    By W. G. Pariseau

    Equivalent elastic properties of discontinuously jointed rock masses are computed using a non-representative volume element(NRVE) approach within a three dimensional finite element program. Joint pers

    Jan 1, 2003

  • TMS
    Hoboken Converter Performance Improvements At The Phelps Dodge Miami Smelter

    By Ovidiu Pasca

    The Phelps Dodge Miami Smelter utilizes four Hoboken converters to process molten matte from the Isasmelt vessel. This paper presents past and present improvements in operation, maintenance and proce

    Jan 1, 2005

  • SAIMM
    Large-scale infrastructure projects. Application of rock mechanics in geotechnical engineering to avoid delays in constrution time and increases of costs—case studies

    By W. Wittke

    SUMMARY: Geotechnical problems often lead to an increase of construction time and costs for large highway and railway projects. Some reasons, which have led to failures and thus to a delay of construc

    Jan 1, 2003

  • AUSIMM
    Mining Methods at Mount Morgan Limited, Mount Morgan, Queensland

    By Patterson B. G

    The small party of mining men who formed the original Mount Morgan Syndicate in 1882, commenced operations on the top of the mountain with what were practically nothing more than small hillside quarri

    Jan 1, 1939