Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Numerical Modeling of the U1A Complex at the Nevada Test Site: Model Development and Comparison of Different Drift Mining Options (9c46cc37-c6f9-43fc-b6b3-b63cc79f203c)

    By R. Karl Zipf

    Stress analysis programs such as MULSIM/NL, LAMODEL, MinSim 2000, and EXAMINE TAB are used in the mining industry to analyze stresses and displacements in coal mines, platinum mines, gold reefs, and t

    Jan 1, 2003

  • SME-ICGCM
    Development of CAN Manipulator

    By Brian E. Perrine

    Underground mining requires a variety of specialized equipment. With ever-changing mining conditions and methods, some mines have had to resort to purchasing existing industrial equipment and adapting

    Jan 1, 2013

  • SME-ICGCM
    Entry Design For Optimum Stability In A Multi-Seam Environment

    By Mohummad Akram

    Statistical analysis of multi-seam mining case studies demonstrated that geologic structure and lithological type and sequencing were predominant factors in entry failures. Finite element analysis was

    Jan 1, 1993

  • SME-ICGCM
    Ground Control Worker Safety During Extended Cut Mining

    By Roy H. Grau

    The trend in underground room-and-pillar cod mining is to employ remote-control continuous mining machines to take extended cuts of 40 A or more. Roof fall safety hazards to the mine worker associated

    Jan 1, 1997

  • SME-ICGCM
    Research And Application Of Combined Reinforcement System

    By Binchuan Zhang

    The combined reinforcement system (CRS) combines the strengths of roof' bolting, resin-anchored cable bolt, and chemical grouting to effectively control the deformation of the strata surrounding

    Jan 1, 2001

  • SME-ICGCM
    Empirical and analytical design of large openings at a proposed national underground science laboratory

    By Karl Jr. Zipf

    The famous Homestake gold mine in Lead, SD. closed recently alter 125 years of operation. However, the mine may receive a new lease on life as a National Underground Science Laboratory (NUSL) supporte

    Jan 1, 2002

  • SME-ICGCM
    Development Process for a Greater Capacity Propsetter® System

    By Christopher J. Brown

    "Proper ground stability in gate roads has been a critical aspect of success in longwall mining. In particular, the tailgate has proven to be one of the more active mine areas that needs to be managed

    Jan 1, 2017

  • SME-ICGCM
    Roofbolting In The Cape Breton Development Corporation's Phalen Colliery

    By B. Macdonald

    In 1991, roofbolts were introduced as a primary support for inseam retreat longwall entries at CBDC's Phalen Colliery. Increasing mine depth (+550 m) necessitated replacing conventional inseam st

    Jan 1, 1994

  • SME-ICGCM
    Application of Various Probing Methods for Rock Characterization in Boreholes Drilled for Roof Bolting

    By Ali Naeimipour

    Availability of accurate geological information about the rock mass surrounding a tunnel or mine working is the key to enhance and optimize the required ground support measures. Various approaches hav

    Jan 1, 2014

  • SME-ICGCM
    Ground Control in the Underground Coal Mines of Colombia

    By Christopher Mark

    Colombia is 11th largest coal producing nation in the world, and the world?s fifth largest coal exporter. But while most of Colombia?s coal is mined at large modern surface mines located near the Cari

    Jan 1, 2014

  • SME-ICGCM
    New Developments in Self Drilling Rock Bolt Technology

    By Stephen C. Tadolini, Peter A. Gray, Robert Hawker, Andrew Sykes

    "Self-drilling rock bolts (SDRBs) that use pumpable cement grout to anchor bolts have been used successfully in the tunnelling and civil engineering industries for many years. Pumpable cement grout of

    Jan 1, 2010

  • SME-ICGCM
    Design Concerns of Room and Pillar Retreat Panels

    By Morgan M. Sears, lhsan B. Tulu, Ted M. Klemetti

    "Why do some room and pillar retreat panels encounter abnormal conditions? What factors deserve the most consideration during the planning and execution phases of mining and what can be done to mitiga

    Jan 1, 2016

  • SME-ICGCM
    Potential Problems Related To Mining Under Or Adjacent To Flooded Workings

    By Stanley J. Michalek

    Good planning is critical to operating a safe and efficient mining operation. As the shallow coal scams become depleted, attention turns toward deeper mineable seams or remnant coal reserves. It is be

    Jan 1, 2000

  • SME-ICGCM
    A New Rockbolt Axial Load Measuring Device

    By Hani Mitri

    A new monitoring device called SAFEBOLT (Stress And Force Evaluator in Bolts) has been recently developed. The device SAFEBOLT, essentially replaces the load cell, it permits the monitoring of bolt a

    Jan 1, 2001

  • SME-ICGCM
    Study of Ground Movement Over a Longwall Mine

    By A. W. Khair

    This paper presents an analysis of ground movements recorded from longwall operations in the Northern Appalachian region in West Virginia. The site chosen for the investigation was selected due to var

    Jan 1, 1987

  • SME-ICGCM
    Effect of Vertical Discontinuities on Roof Stability and Ground Control Challenge: A Case Study

    By Li Yang, Andre Cezar Zingano, Alberto Fronza

    "Immediate roof control is very important to the security and stability of entries in coal mining. It is also the highest cost in the coal mining operation, and roof spalling is directly responsible f

    Jan 1, 2017

  • SME-ICGCM
    New Methods and Technologies of Roofbolting in Australia Coal Mines

    By Mictck Rataj

    Methods of rock reinforcement in Australian coal mines are being advanced progressively through the better understanding of rock failure mechanisms around roadways and the-development of improved bolt

    Jan 1, 1997

  • SME-ICGCM
    The Application Of Rock Mass Classification Principles To Coal Mine Design In UK Conditions

    By David J. Reddish

    Longwall systems are inflexible in layout, intolerant of disruption and represent a substantial investment. It is therefore essential drat all understanding of the likely strata behaviour and support

    Jan 1, 2000

  • SME-ICGCM
    Evaluation Of Existing Predictive Methods For Mine Subsidence In The U. S. (1ec2d374-5864-4775-9b19-24759c4f95be)

    By Vladimir Adamek

    Two existing predictive methods were chosen for evaluation; an influence function (Gals Theory) and a profile function (hyperbolic). These were applied to several field measured subsidence pro¬files o

    Jan 1, 1981

  • SME-ICGCM
    Analysis of Global and Local Stress Changes in a Longwall Gateroad

    By Esterhuizen S. Gabriel, Su W. H. Daniel, Tulu B. Ihsan, Klemetti M. Ted, Mohammed M. Khaled, Gearhart F. Dave

    "A numerical-model-based approach was recently developed for estimating the changes in both the horizontal and vertical loading conditions induced by an approaching longwall face. In this approach, a

    Jan 1, 2017