Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Technical Planning and Control"Chairman: Professor J. de V. Lambrechts Rapporteur: Mr R. HempPapers:Computer-aided design of a flash smelting installation by M. A. T. Cocquerel, R. T. Gates and L. A. GreenPlanning of mine ventilat
Jan 1, 2014
-
A study of UG2 pillar strength using a new pillar databaseBy D. F. Malan, T. E. Oates
A recent experimental pillar extraction project at a UG2 bord-and-pillar mine presented a unique opportunity to compile a new pillar database. Currently, the South African hard rock bordand- pillar mi
May 3, 2023
-
Application of Rock Mass Classification and Blastability Index for the Improvement of Wall Control: A Hardrock Mining Case StudyBy G. Segaetsho
"Conventional blasting rules of thumb used to develop blast designs are based on parametric ratios, with insufficient consideration of the rock mass factors that influence the achievability of final w
Jan 1, 2018
-
Exploratory development of a rotary offset crusherBy T. Nghipulile, M. Moys, M. Bwalya, H. Simonsen
The quest for efficiency in comminution is an ongoing concern as comminution usually constitutes a major cost component in the metal production industry. Such improvements can be made by circuit optim
Jan 1, 2021
-
Numerical modeling of a repeated fault slipBy S. J. Webber
This paper reports on the use of the MINSIM-D stress-analysis program for the modeling of two large seismic events that occurred on the same fault eleven years apart. It was found that the first event
Jan 1, 1990
-
Field Validation of Estimated Primary Fragment Size Distributions in a Block Cave MineBy S. Annavarapu
"Fragment size distributions play an important part in the design and planning of block cave mining operations. Though several methods have been proposed for estimating fragment size distributions in
May 1, 2019
-
A finite-element method model for a ferromanganese and silicomanganese pilot furnaceBy V. K. Risinggård, M. Sparta
We report on the development of a finite-element method model for a pilot furnace for the production of manganese alloys. The model is a multiphysics model that addresses material flow, electrical con
Apr 16, 2024
-
The absorption of gold cyanide onto activated carbon. II. Application of the kinetic model to multistage absorption circuitsBy M. J. Nicol, G. Cromberge, C. A. Flemming
A relatively simple rate equation for the kinetics of the absorption of gold from cyanide solutions onto activated carbon was lI5ed as the basis in the development of a model for multistage carbon-in-
Jan 1, 1983
-
Conditioning in the flotation of gold, uranium oxide, and pyriteBy F. J. N. Stassen
SYNOPSIS The effect of conditioning energy on the flotation of gold, U308, and pyrite was investigated in the range 0,1 to 100 kWh per tonne of dry ore for various combinations of conditioning time a
Jan 1, 1991
-
An integrated approach to panel width, fleet size, and change-out time optimization in room-and-pillar minesBy E. Córdova, A. Anani, W. Nyaaba
Optimization of panels, haulage fleet, and waiting area involves deterministic and low-fidelity methods and experiential knowledge. The process is challenging because coal recovery and operational cap
Apr 2, 2022
-
Spontaneous combustion of carbonaceous shale at an iron ore mine, South AfricaBy B. Genc, C. Gous
Spontaneous combustion during coal mining operations is a major problem that affects the health and safety of workers and causes environmental problems. The phenomenon is associated with the presence
Jun 5, 2023
-
Guide to using gravity in the detection of underground voidsBy P. Linzer, L. M. Linzer
The gravity method is often applied in mining-related scenarios such as geological and mineral exploration, detecting subsurface cavities and voids (“receptacles”) that may become sinkholes, siting of
Sep 1, 2025
-
IT concept design for a mid–size construction company in Poland APCOM 2021By S. F. Böde, K. Böde
This paper focuses on developing a comprehensive and pragmatic information technology (IT) strategy for low-margin construction activities. This forms part of the realignment of the general business s
Sep 1, 2021
-
Costs and benefits of fit-for-purpose sampling solutionsBy T. Bruce, R. C. A. Minnitt
Mining operations are generally reluctant to install high-cost sampling systems at operations that have been functioning for many years. The principal objection to installing appropriate equipment to
Jul 2, 2022
-
Analysis of rope load sharing on multi-rope friction windersBy S. R. Grobler, S. Bilessuris, M. E. Greenway
Ensuring that all the head ropes on a multi-rope friction winder share the load equally has been a design and maintenance issue since they were first developed. Accurate machining of the rope grooves
Sep 1, 2021
-
A New Bubble Pick-Up Technique as a Rapid Flotation Test MethodBy A. F. Lee
Dr E. C. Hanekom (Visitor): Two years ago we used the bubble pick-up technique as developed at Anglo American Corporation for screening candidate flotation agents prepared in our laboratories. It was
Jan 12, 1969
-
Investigation of the mechanism for fireside corrosion in coal-fired boilers in South AfricaBy J. W. van der Merwe, K. G. Moloko
Furnace wall tubes from 600 MW subcritical boilers at three coal-fired power stations were sampled and the fireside deposits examined to determine the mechanism of fireside corrosion. This involved an
Jun 1, 2021
-
Prediction of silicon content of alloy in ferrochrome smelting using data-driven modelsBy S. Swanepoel, A. V. Cherkaev, Q. G. Reynolds, M. Erwee
Ferrochrome (FeCr) is a vital ingredient in stainless steel production and is commonly produced by smelting chromite ores in submerged arc furnaces. Silicon (Si) is a componrnt of the FeCr alloy from
Mar 14, 2024
-
Optimization of shift cycles in the South African mining sectorBy J. Pelders, F. Magweregwede, S. M. Rupprecht
Increased depths of conventional gold and platinum mines, longer travelling times as working places move further from the shaft, and ancillary activities taking place in the mining cycle reduce the us
Aug 1, 2021
-
Back analysis of LG6/LG6A chromitite pillar strength using displacementn discontinuity modellingBy D. F. Malan, P. J. Le Roux
Almost no work has been published on the strength of pillars in mines exploiting the LG6/LG6A chromitite bands in the Western Bushveld Complex. The strength of these pillars is unknown, and the hard r
Nov 27, 2024