Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Ultimate Uplift Capacity Of Single And Group Piles In Clay ? Synopsis

    By B. M. Das

    Several laboratory model test results for the determination of the ultimate uplift capacity of single and group metal piles embedded in near-saturated clay have been presented. Based on the uplift tes

    Jan 1, 2010

  • DFI
    Practical Soil Nail Wall Design And Constructability Issues

    By Walter G. Kutschke

    Four significant soil nail wall projects in the eastern United States were recently completed with a combined area of 175,000 square feet of finished shotcrete surface. These projects required the us

    Jan 1, 2007

  • DFI
    Bell Bottom Cast-In-Place Piling By Reverse Circulation Drill ? Synopsis

    By T. Soejima

    In recent years, there has been a tendency in the field of foundation piling works to utilize piles of greater bearing capacity in order to meet increasing height and weight of modern building as a me

    Jan 1, 2010

  • DFI
    Technical Note Evolution Of Top Of Pile Measurement Techniques In Deep Foundation Static Load Testing

    By Jon Sinnreich

    Ensuring the accuracy of collected data during deep foundation static load tests is of paramount importance. Typically, pile head displacements are measured relative to a purpose-built reference syst

    Jan 1, 2009

  • DFI
    Uncertainty And Bias In Evaluation Of LRFD Ultimate Limit State For Axially Loaded Driven Piles

    By James A. Schneider

    Selection of resistance factors within Load and Resistance Factor Design (LRFD) requires accurate assessment of uncertainty and bias in load and resistance. To date, many studies have focused predomin

    Jan 1, 2009

  • DFI
    Construction Of Long Tubular Column Foundations Under Deep Water ? Synopsis

    By C. L. Liao

    The chief experiences for constructing deep tubular columns foundation under deep water are as follows: 1. P.C. tubular columns were sunk inside the caisson. 2. P.O. tubular columns of 3.6 M. diameter

    Jan 1, 2010

  • DFI
    Prediction And Performance Of Drilled Shafts Constructed Under Slurry

    By Clyde N. Baker

    The paper describes procedures used to predict the settlement performance of drilled shafts constructed under slurry through water bearing deposits to a dense bearing strata, considering both side res

    Jan 1, 1991

  • DFI
    The Use Of Micropiles In Estonia

    By T. Ruben

    Micropiles have been used for the last forty years to strengthen building foundations. This article gives information about the technology and capacity of micropiles.

    Jan 1, 2000

  • DFI
    Excerpts From Drilled Shafts: Construction Procedures And Design Methods - General Approach

    By L. C. Reese

    ? Good construction and inspection presumed. ? Capacity-computation factors are independent of construction method. ? To account for variable or uncertain site conditions, anticipated construc

    Jan 1, 1988

  • DFI
    Statnamic Load Testing Of High Capacity Marine Foundations

    By Mike Muchard

    STATNAMIC load testing augmented with embedded instrumentation has been successfully used to obtain structural and geotechnical design information on large diameter spun cast concrete cylinder piles o

    Jan 1, 2005

  • DFI
    Experiences With Base Grouted Drilled Shafts In The Southeastern United States

    By Steven D. Dapp

    The use of base grouting (tip grouting) to enhance the axial capacity of drilled shaft foundations can achieve improvements in economy and reliability for many types of projects and soil profiles. Rec

    Jan 1, 2006

  • DFI
    Modelling For Consolidation Around The Pile Tip

    By Emöke Imre

    A point-symmetrical linear coupled consolidation model with displacement boundary condition is suggested for the description of the consolidation around the pile tip after pile penetration. Analytical

    Jan 1, 2002

  • DFI
    Kinematic Response Characteristics of a Piled Raft Foundation

    By Ramon Varghese, A. Boominathan, Subhadeep Banerjee

    Pile raft foundation system has been accepted as an economic foundation design for high rises and heavily loaded structures. Seismic response analysis of PR foundation systems involves complex pile-so

    Jan 1, 2018

  • DFI
    Capacity Of Slender Steel Piles

    By J. Wennerstrand

    Slender steel piles have found an increased use in Sweden in resent years. These piles are often driven throw soft normally consolidated clay to refusal in till or at the rock surface. In contrast to

    Jan 1, 1989

  • DFI
    Drilled Piers With Base Preloading By Grouting - 1. Introduction

    By Boleslaw A. Klosinski

    Drilling of a pier hole is accompanied with stress releasing in the surrounding soil and often with loosening of soil at the pier base. In effect the drilled piers are more deformable than driven pile

    Jan 1, 1995

  • DFI
    Drivability Of Piles By Vibration

    By Don C. Warrington

    This paper is a survey of the various methods and research efforts by which the drivability of piles is determined. First, a brief outline of the basic theory and the important parameters for driving

    Jan 1, 1989

  • DFI
    The Design And Construction Of Large Diameter Base Grouted Piles In Thanet Sand At Blackwall Yard, London

    By J. A. Yeats

    This paper describes the loading to 25MN of a 1.2m diameter bored cast-in-situ test pile founded in the Thanet Sand which was base grouted. The pile was sleeved over the major portion of its length to

    Jan 1, 1989

  • DFI
    Foundation Design And Construction In Variable Rock

    By Joel Moskowitz

    A new office complex is being constructed within 25m of the Hudson River in New Jersey. The project, about 140 m by 100 m, will include 4 basements under the entire footprint. The perimeter was to be

    Jan 1, 2002

  • DFI
    Quality Control For Augered Cast-In-Place Piles In Texas And Louisiana - 1.0 Introduction

    By Timothy L. Roberts

    For many years practicing geotechnical and structural engineers in Texas and Louisiana were reluctant to include augered cast-in-place (ACIP) piles as a viable deep foundation alternate. Three primary

    Jan 1, 1998

  • DFI
    Soldier Pile Installation Light Rail Rapid Transit Buffalo, New York - Project Description

    By Daniel J. Rider

    In 1980 the Niagara Frontier Transportation Authority contracted for three miles of cut and cover box structure and station construction in Main Street, Buffalo, New York. Project depths ranged from

    Jan 1, 1987