Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    Comparison Between Statnamic And Static Load Testing Of Drilled Shafts In Varved Clay

    By Carl Ealy

    Static and STATNAMIC (STN) rapid load test (RLT) was performed on 3-drilled shafts. The purpose of the RLT part of the study was to obtain data in support of FHWA research on innovative load testing m

    Jan 1, 2002

  • DFI
    Case Studies/case Histories In Geotechnical Engineerin: Enhancing The Practice In An Interactive Learning Environment

    By Waddah Akili

    This paper describes the steps taken in planning, developing, and executing a case study/ case history course in geotechnical/ foundation engineering at an international university. The paper sheds li

  • DFI
    Applying The Carbon Hierarchy To Geotechnical Contractors

    By J. E. De Waele, J. J. Lee, M. J. Mulheron, Luke R. Deamer

    There is increasing demand for geotechnical contractors to commit to carbon reduction, net zero or science based targets. A lot of focus has therefore been placed on using low carbon materials and low

    May 1, 2022

  • DFI
    Construction of the Tailings Storage Facility Freshet Management Embankment Cut Off Wall at Mount Polley Mine

    By Terry Eldridge, Keith MacKay, David Siddle, Luke Moger

    On August 4th, 2014, a breach occurred in the Perimeter Embankment of the Tailings Storage Facility (TSF) located at the Mount Polley Mine, releasing approximately 10.6 million m3 of supernatant water

    Jan 1, 2016

  • DFI
    Seismic Design for the I-30 Crossing Project in Little Rock, Arkansas

    By David S. Graham, Benjamin Turner, Paul J. Axtell

    Seismic challenges were at the forefront of design for two parallel replacement bridge structures over the Arkansas River as part of the I-30 Crossing Project in Little Rock, Arkansas. Although not an

    Sep 8, 2021

  • DFI
    Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KY

    By Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba

    "Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in

    Jan 1, 2015

  • DFI
    Piles through Soft Clay for a Metro Project

    By Sanjay Gupta, Sorabh Gupta, Ravi Sundaram, Abraham Varghese

    "Geotechnical investigation for the Kochi Metro revealed a critical section of the Viaduct near Ernakulam Junction Railway Station. Four piers, located over a 220 m stretch, were passing through an ar

    Jan 1, 2015

  • DFI
    Liner Piles Used As Support To Kentledge For Initial Compression Load Test

    By Venugopal B, M Kumaran, Thomas John, Vetriselvan A

    The initial pile load tests are conducted to ensure the geotechnical capacity of the pile in a particular site condition. Normally kentledge method is adopted for the compression pile load tests. In t

    Nov 1, 2022

  • DFI
    Deep Soil Mixing Trials at Porto Alegre Airport, Brazil

    By A. Ortigão, M. Felix, E. Falk, T. Koehler

    "Ground improvement techniques such as vibro-replacement or deep soil mixing are fairly young products in the Brazilian geotechnical market. Soft soils in this country are deep, very soft, have low se

    Jan 1, 2015

  • DFI
    Subsurface Component Design and Construction for a High-Rise in a Dense Urban Environment: A Case History of the 181 Fremont Tower

    By Kirk Ellison, Eric S. Lindquist, Peter Faust, Stephen M. McLandrich

    "The 181 Fremont Tower will be an 800-foot high-rise with a 60-foot deep basement located in a dense urban part of downtown San Francisco. The design and construction methods of the subsurface element

    Jan 1, 2017

  • DFI
    CPT Methods for Helical Pile Design

    By Howard A. Perko, Margaret Dring, Gerald Verbeek, Scott Slaughter

    Helical piles have become a widely used deep foundation system in recent years due to their many inherent advantages. The cone penetration test (CPT) is commonly used in geotechnical practice to evalu

    Sep 8, 2021

  • DFI
    3D FEM Modelling of a Ground Improvement Solution

    By Yazen Khasawneh, Osvaldo P. M. Vitali, John E. Agee, Mohammad Nassim

    A 3D FEM modeling of a ground improvement solution for an ice rink slab with stringent differential settlement limits is presented. Due to the complexity of the geotechnical conditions and strict defo

    Sep 8, 2021

  • DFI
    Deep Soil Mixing Ground Improvement for the U.S. Federal Courthouse in Downtown Los Angeles, California

    By Roberto A. Lopez, Eric Lindquist, Jon Bussiere, Dean Iwasa

    "The new 11-story U.S. Federal Courthouse building in downtown Los Angeles demanded a cost effective foundation system capable of attaining a strict total settlement criterion of 0.5 inches (12 mm) un

    Jan 1, 2015

  • DFI
    Load Distribution for Underpinning System Using Inherent Rigidity of Concrete Dam

    By Rick Deschamps, Amanda Blank, Matthew W. Drewek, Michael P. Walker

    The Prairie du Sac Dam, located on the Wisconsin River, northwest of Madison, Wisconsin, was constructed 1912-1914. The spillway is an Ambursen-type, consisting of a series timber pile supported pier

    Sep 8, 2021

  • DFI
    Trouble In Paradise: Micropiles As A Solution To Challenging Geotech And Steep, Rugged Terrain On The Island Of Oahu

    By Steve Davidow, Scott Tunison

    As the demand for electric power grows and generation facilities are constructed in more remote areas, the industry faces an increasing number of foundation construction challenges. The importance of

  • DFI
    Ground Improvement By Means Of Stabilising Columns

    By Georg Breitsprecher

    The technique of Stabilising Columns (product names are for example "Stabilisierungssaulen" (STS) or "Coplan Stabilisierungs-verfahren" (CSV)) is gradually becoming well accepted for ground improvemen

    Jan 1, 2006

  • DFI
    Cutter Soil Mixing Solutions at the Leixões Cruise Terminal

    By Xavier Pita, Alexandre Pinto, António Cristovão, Rui Tomásio

    "The cutter soil mixing technology was been applied in Portugal since the last seven years. The aim of this paper is to present the main design and execution criteria, related with both the cofferdam

    Jan 1, 2015

  • DFI
    Improvement Of Bearing Capacity Of Bored Piles By Grouting Method

    By Andrzej Tejchman

    A method of improvement of a subsoil under bored pile base by injection is presented. The method employs a special chamber attached to the reinforcement at the bottom of the drilled borehole. The cham

    Jan 1, 2002

  • DFI
    Adaptive Design and Contractual Approaches to Address Geotechnical Uncertainties in a Design-Build Ground Improvement Project

    By Kalyani Devabhaktuni, Mike Minton, Mark T. Howe, Yan Zhang

    During the procurement phase of a Design-Build (DB) project, design-build contractors must often commit to a fixed price based on limited or incomplete geotechnical information. This lack of informati

    Jan 1, 2019

  • DFI
    Cement Deep Soil Mixed Walls/Grout Plug for Groundwater Cut Off and Excavation Support at the Bart Warm Springs Extension

    By Harry Schnabel, Mitchell L. Fong, Douglas R. Jenevein, Thomas S. Lee

    "The Warm Springs Extension (WSX) is one of a series of projects that will eventually extend the Bay Area Rapid Transit System (BART) from Fremont to San Jose, California. A cut and cover tunnel was u

    Jan 1, 2015