Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Jolu Gold Mine Low Cost Gold Recovery Configuration

    By J. Kazakoff

    "The success of gold recovery at the Jolu gold mill depends on many variables. The most important ones are the people, the ore body, plant design parameters, equipment selection and cost control. This

    Jan 1, 1990

  • CIM
    Lac Minerals Development of Hemlo

    By C. Patel, George H. Hope

    "INTRODUCTIONThe Hemlo area is located in Northern Ontario, some 350 km east of Thunder Bay along highway 17. Hemlo is Canada's largest, recent discovery of gold ore. Three companies, Lac, Noranda, an

    Jan 1, 1985

  • CIM
    Commissioning and Testing of Thickener Feed De-Aeration Cyclones at the Xstrata Nickel Raglan Operation

    By Colin Hardie, Simon Pelletier, Rakan Rhabani, Guy Comeau

    "In order to improve the nickel concentrate thickener operation at Raglan Mine, two pulp deaeration cyclones were installed. These units obtained from Outotec Pty Ltd, also called the FrothBuster®, ha

    Jan 1, 2008

  • CIM
    Typical Reproducibility of Metal Balances in Flotation Plants

    "Each and every flotation plant must produce daily/weekly/monthly production reports in which metal balances for payable and penalising elements are presented. Several factors including ore heterogene

    Jan 1, 2016

  • CIM
    Circuit Consolidation at Pine Point Mines Limited Pine Point, N.W.T.

    By R. E. Jones

    "INTRODUCTIONCominco Limited, one of the free world's largest producers of lead and zinc having majority ownership in Pine Point Mines Ltd., operates a mining and concentrating complex on the south sh

    Jan 1, 1982

  • CIM
    CIM Environmental, Social and Governance Guidelines for Mineral Resource and Mineral Reserve Estimation

    By CIM Environmental, Social Responsibility Society

    Within the mining industry, the pathway from exploration, to planning, construction, operation and closure has become more complex over the last few decades. The current financial, environmental and s

    Sep 8, 2023

  • CIM
    Cone Crusher Operaitonal Variables

    By A. J. Magerowski

    Energy consumption is a main component of operational costs for the comminution of mineral bearing ores. Reduction of energy consumption has continually been addressed by mill operators and equipment

    Jan 1, 1986

  • CIM
    Improving Fine Lead and Silver Flotation Recovery at BHP-Billiton’s Cannington Mine

    By Glenn Clarke, Ben Holloway, Barry Lumsden

    "BHP-Billiton’s Cannington mine in Northwest Queensland produces a silver-rich lead concentrate and a zinc concentrate. The plant has the capacity to treat 3.1 mta and for the year to June 2006 mean f

    Jan 1, 2008

  • CIM
    Multiparameter Petrophysical Characterization of an Orebody: An Exploration Case History

    By E. Bongajum

    We present results from petrophysical studies to characterize a Zn-Pb-Ag deposit in Nash Creek, New Brunswick. The measurements are part of an integrated study that includes geological and geophysical

    May 1, 2009

  • CIM
    Thermodynamic Modeling of Copper Chloride-Containing Systems in High Temperature Processes

    By P. Taskinen, D. Lindberg, H. Viitala

    The formation of copper chlorides in flue dust or deposits in heat recovery boiler of copper smelters or waste-fired boilers may lead to formation of corrosive partially molten deposits on walls and h

    Jan 1, 2019

  • CIM
    Pilot Plant Testing for Column Flotation Circuit Design

    By G. A. Kosick, G. S. Dobby, O. Matwijenko

    "A 100 kg/hr portable flotation pilot plant has been operated at Kidd Creek Mines with the objectives of:(a) determining performance expected by column flotation circuits on primary zinc and copper cl

    Jan 1, 1990

  • CIM
    Failure Mechanisms of Pillars Under Shear Loading

    By Joseph J. Mgumbwa

    Pillars are any structures left between two or more underground openings. The stability of pillars is normally considered to depend on shape (defined by width to height ratio), rock mass strength, ext

    Oct 1, 2010

  • CIM
    A New Tool for Sag Hardness Testing

    By Glenn Kosick, John Starkey, Glenn Dobby

    "A practical new test has been developed for SAG hardness determination. Using two kilogram samples of minus one inch diamond drill core or crushed muck samples, the Starkey SAG Test has been shown to

    Jan 1, 1994

  • CIM
    Frother Analysis: Procedure and Plant Experiences

    By James A. Finch, Stéphanie Gélinas

    "A colorimetric technique, originally developed for methyl iso butyl carbinol (MIBC) based on the Komarowsky reaction, has been extended to a wide range of common mineral flotation frothers. The proce

    Jan 1, 2007

  • CIM
    Subaqueous Tailings Disposal: A Promising Method for the Effective Control of Reactive Waste Materials: An Overview of the Practice with Case Studies

    "It is projected that the reactivity of acid generating tailings and waste rock can be minimized by reducing the access of oxygen by placing these materials under water in natural or manmade lakes. A

    Jan 1, 1992

  • CIM
    Analytical Solution for a Deep Tunnel Excavated in a Porous Elasto-Plastic Material Considering the Effects of Seepage Forces

    By R. E. Barbosa

    Seepage forces generated during tunnel excavation affect the ground response and may cause severe instability problems, including total ground collapse and flooding into the tunnel. This paper present

    May 1, 2009

  • CIM
    Developments and New Applications for Biogenic Sulphide Reagent in Hydrometallurgy and Mineral Processing

    By R. W. Lawrence

    "In the past year, BioteQ Environmental Technologies Inc. have initiated design and construction of new plants to add to an existing list of plants that utilize the BioSulphide® and ChemSulphide™ proc

    Jan 1, 2007

  • CIM
    An Alternative Approach to Estimating the Composition of Existing Waste Rock Facilities

    By Matthew P. Wickham

    The use of existing mine records in conjunction with an appropriate classification scheme can be used successfully to identify and characterize the composition of existing waste rock facilities where

    May 1, 2002

  • CIM
    Strain Distribution in the Bending-Under-Tension Test

    By D. K. Uko

    In the stretch-bend or bending-under-tension test, a strip is rigidly clamped and restrained at each end and bent by central transverse loading using a radiused punch: The strip deflection at failure

    Jan 1, 1977

  • CIM
    Concentrator upgrade program at the Iron Ore Company of Canada, Carol Lake Concentrator: concentrator upgrade testing program; concentrator flowsheet development

    By Martin Nevens

    "In 1998, the Iron Ore Company of Canada initiated an aggressive program to improve the performance of its Carol Lake Concentrator located in Labrador City, Newfoundland. This program was termed the C

    Jan 1, 2002