Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Throwing the Switch - The Planning, Process and Challenges of a Ventilation System Changeover

    By Arsalan Talebzadeh

    Construction -Surface ?First two intake fans constructed in 2007; third fan added in 2008 to reduce resistance in the system. 450 HP fans. ?Excavation for exhaust fans started in 2008. ?In parallel

    Oct 1, 2010

  • CIM
    Variable filling fluid couplings for mining applications

    By J. Elderton

    "The combination of A C induction motor and flu id coupling, of either the fixed or variable filling type, constitutes a simple, low cost, highly reliable drive unit, with many applications in the min

    Jan 1, 1986

  • CIM
    Coarse Size Pre-Concentration of Low Grade Copper Ores by Dense Medium Separation

    By Y. Hou, E. Arinaitwe, L. Tong

    A series of dense medium separation (DMS) tests were performed on four low-grade copper ores from Mount Polley mine in order to determine their amenability to pre-concentration. The tested ores contai

    Jan 1, 2014

  • CIM
    Simulation as a Tool to Enable World’s Best Mill Relining Practice (aafeded2-af45-4edf-b535-58771fc04187)

    By Peter Rubie

    "For many years, optimising the relining of hard rock grinding mills has been complicated by:?? the large number of variables;?? the low frequency of relines (slow feedback loop);?? the potential econ

    Jan 1, 2012

  • CIM
    Performance improvement at the Bell Mine

    By M. C. Ethier, A. L. Laramie

    "The Granisle and Bell Copper mines were officially put into production in 1966 and 1972, respectively. The Granisle Mine was purchased in late 1979by Noranda and the two operations were amalgamated a

    Jan 1, 1990

  • CIM
    New Method for Cyanide Destruction in Gold Mill Effluents and Tailing Slurries

    By G. J. Borbely, E. A. Devuyst, V. A. Ettel

    "A new method for oxidative destruction of cyanide in industrial waste waters and slurries, such as gold mill barren liquors, tailing slurries and flotation tailings has been developed at the Inca res

    Jan 1, 1982

  • CIM
    Innovative Use of Advanced Technology in Mining

    By Craig Dirk

    Agenda Applications of ?GPS ?Drill Navigation ?Cycle time monitoring ?UDS / Boom Stress monitoring ?Payload systems ?Laser Surveying Future Applications

    May 1, 2006

  • CIM
    Study on Feasibility of Columnar Jointed Basalt as a High-Arch Dam Foundation

    By Wei Yun-Jie

    Columnar jointed basalt is a fractured rock, with a lot of small spacing structural planes and poor integrity of the rock mass. On the basis of the comprehensive study of the columnar shape of Columna

    May 1, 2009

  • CIM
    Use of Placer Gold Characteristics to Locate Bedrock Gold Mineralization

    By Jeffrey S. Loen

    "Abstract - The size, morphology, surface texture, per cent mineral inclusions, and bulk chemistry (Ag and trace elements) of placer gold particles vary systematically according to transport distance

    Jan 1, 1995

  • CIM
    The Identification of Poorly Crystalline Scorodite in Uranium Mill Tailings at the McClean Lake Operation

    The uranium ore processed by the McClean Lake Operation is co-mineralized with niccolite, rammelsbergite and gersdorffite (nickel arsenides). During the strong acid leach process, the majority of the

    Aug 1, 2010

  • CIM
    Aging of Reduced Arsenic Minerals in Uranium Mill Tailings at the McClean Lake Operation

    The primary arsenic minerals in the uranium ore processed at the McClean Lake Operation are rammelsbergite, niccolite and gersdorffite. During processing, a large fraction (80 - 95%) of these reduced

    Aug 1, 2010

  • CIM
    Use of Placer Gold Characteristics to Locate Bedrock Gold Mineralization (4c0ccac0-3cd3-4508-98f2-639f49cc534a)

    By Jeffrey S. Loen

    "The size, morphology, surface texture, per cent mineral inclusions, and bulk chemistry (Ag and trace elements) of placer gold particles vary systematically according to transport distance from source

    Jan 1, 1995

  • CIM
    Post-magmatic Remobilization of Platinum-Group Elements in the Kelly Lake Ni-Cu Sulfide Deposit, Copper Cliff Offset, Sudbury

    By Peter C. Jones, Wanda M. Carter, David H. Watkinson

    "Abstract - Pyrrhotite, chalcopyrite, and pentlandite are the dominant sulfide minerals in the 740 zone of the Kelly Lake orebody (Inco Ltd.), Copper Cliff Offset, Sudbury. Petrographic and quantitati

    Jan 1, 2001

  • CIM
    Some Geochemical Considerations for Platinum-Group-Element Exploration in Layered Intrusions

    By A. E. Boudreau

    Abstract-It has long been recognized that platinum-group-element (PGE) deposits in layered intrusions preferentially occur in intrusions that crystallized from high-Mg parent magmas. Recent studies su

    Jan 1, 1995

  • CIM
    Comparison of Ore Reserve Grades with Mill Head Grades Using Statistics in Two Gold Mines, Sudbury District, Ontario (7ca5ee8d-4f87-46b6-ae68-732b4e5e2c31)

    By Elaine Ellingham, Francis T. Manns

    "The Orostar and Scadding were two small gold mines owned and operated by Orofino Resources Limited. Conventional statistical treatment indicates an identical arithmetic mean grade of 0.22 oz/T Au for

    Jan 1, 1992

  • CIM
    Failure Mechanism of Resin-Anchored Rebar in Potash

    By D. Neely, D. Milne, L. R. Feldman

    "Resin-anchored rebar is commonly used for rock support in mining. The rock properties and environment determine the average bond strength, allowing mine engineers to select the appropriate length and

    Jan 1, 2016

  • CIM
    An Investigation into the Regrinding Circuit Efficiency at Miduk Copper Complex

    By R. Shamsodini, A. Poor Zaeif Doost, H. Haji Amin Shirazi, M. R. Garmsiri

    "With columns being installed in rougher section at Miduk Copper Complex, the rougher feed mainly reports to rougher-scavenger cells. To evaluate the efficiency of regrinding circuit, we conducted flo

    Jan 1, 2012

  • CIM
    Extraction of radium from uranium tailings

    By Desmond M. Levins, Reginald K. Ryan

    "Removal of radium from uranium tailings would substantially lessen their environmental impact because it would eliminate, or greatly reduce, the hazards arising from radon emanation, leaching of radi

    Jan 1, 1980

  • CIM
    Motor insulation considerations for variable speed AC drives

    By M. E. Stutt, R. H. Rehder

    "The mining industry is taking advantage of the increased performance resulting from the use of variable speed A C drives for large motors. This technology provides increased efficiency under the vari

    Jan 1, 1995

  • CIM
    Some Geochemical Considerations for Platinum-Group-Element Exploration in Layered Intrusions (538dc986-ca54-4e8c-8b54-af3cdab56d86)

    By A. E. Boudreau

    It has long been recognized that platinum-group-element (PGE) deposits in layered intrusions preferentially occur in intrusions that crystallized from high-Mg parent magmas. Recent studies suggest tha

    Jan 1, 1995