    RAF Copper Production Process Improvement at the Caletones Smelter

    By J. Font

    The RAF or copper fire refining process at the Caletones smelter of CodelcoChile consists of several pyrorefining stages that successively lowers the levels of S, Fe, Pb, As, Sb, Te, Se and to some ex

    Jan 1, 2007

  • CIM
    Investigation of Anisotropy in Compressive Elastic Modulus of the Montney Shale

    By S. A. R. Keneti

    Predicting the geomechanical response of the shale gas material during hydraulic fracturing operation in the field needs better understanding of their geomechanical behaviour under laboratory testing.

    Jun 1, 2012

  • CIM
    Falconbridge Ltd. - 60 years in a century

    By Gerald A. Crawford

    "1880s - Unmasking the Sudbury Basin Falconbridge Ltd. turned 60 in 1988 but its roots go back more than a century to the discovery and development of the mineral resources of the Sudbury Basin. Nicke

    Jan 1, 1999

  • CIM
    Behaviour of Rooms and Pillars in Deep Potash Mines

    By Dennis Z. F. Mraz

    "Because rock salt and pot ash formations contain particles capable of elastic deformation, the material has usually been compared with various rheological models containing elastic elements. Extensiv

    Jan 1, 1973

  • CIM
    Managing Complex Ore and Waste Delivery Restrictions at CNRL with Wenco Survey-Grade GNSS and Dispatching Solutions

    By G. F. Trainor

    The complex ore body at CNRL?s Horizon mine presents some unique challenges in managing ore and waste delivery. With 25m x 25m ore blocks shovels often take bucket loads from multiple blocks to fill o

    May 1, 2013

  • CIM
    CIM: Using International Construction Project Management Techniques in the Mining Industry

    By Willie van Niekerk

    As mining projects get larger and more complex there is a need to examine the use of project management techniques developed for large construction projects in order to ensure completion of the projec

    May 1, 2009

  • CIM
    Royal Canadian Mint Silver Electrorefining Bleed Treatment

    By V. Aprahamian, G. B. Harris, C. W. White, M. Tangen

    "In 2005, the Royal Canadian Mint (RCM) commissioned a new silver electrorefining circuit. This circuit was intended to operate with a minimal electrolyte bleed for the control of copper. However, by

    Jan 1, 2016

  • CIM
    Performance of Iron Ore Pellets During Reduction in Rotary Kilns

    By Erik Q. Dahl

    The strength of green and sintered pellets during reduction under various conditions in a laboratory kiln has been investigated. Equipment and test methods are described, together with the results obt

    Jan 1, 1966

  • CIM
    Ross Mine

    By W. A. Jones

    "The Ross mine, a subsidiary operation of Hollinger Consolidated Gold Mines, Limited, is near the north end of lot 1, con. II, Hislop tp., Ontario. The property comprises the north half of lot 1, con.

    Jan 1, 1954

  • CIM
    On the Carrying Capacity Limitation in Large Flotation Cells

    By J. B. Yianatos, F. A. Contreras

    Mineral carrying rates across the pulp-froth interface in the range of 1.4-3.2 tph/m2 and bubble surface coverages between 7 and 22 %, have been determined in large rougher flotation cells operated un

    Jan 1, 2009

  • CIM
    Simple Graphical Method of Evaluation of the Noise Exposure Index and the Equivalent Continuous Sound Level

    By M. Savich

    A graphical method has been developed for the evaluation of the U.S. Occupational Safety and Health Act Noise Exposure Index and the Equivalent Continuous Sound Level. The method makes use of a noise

    Jan 1, 1978

  • CIM
    Risks Analysis for Ventilation Network Optimisation Processes in Kazakhstan Metal Mines

    By A. Karzhau, B. Aldamzharov, Y. Tussupbekov

    "This case study produced for the metal mine operating in Kazakhstan, which has ventilation controlled manually and working continuously at maximum speed to keep air flowing through each part of the m

    Jan 1, 2019

  • CIM
    Milling Practice at the Britannia Mines Howe Sound, B.C .

    By A. C. Munro

    The concrete work on the new Britannia mill was started in April, 1922. The erection of steel commenced on July 10th, following. The installation of wood work and machinery , began on November 4th of

    Jan 1, 1923

  • CIM
    Moisture Content’s Effect on Fracture Development in Coal under Microwave Irradiation

    By G. Hu, P. Chang

    "As hydraulic fracturing is forbidden in some countries due to its accompanying environmental pollutions, microwave fracturing was proposed as a substitute technology to enhance coal seam permeability

    Jan 1, 2019

  • CIM
    Rapid Development in Canada: Myth or Reality? An Underground Mining Contractor’s Perspective

    By P. Hickey, G. Hubert, P. Healy

    "J. S. Redpath Limited, an underground contractor with a worldwide presence, has implemented innovative techniques in various projects in Canada to shorten the development cycle. Conventional methods

    Jan 1, 2016

  • CIM
    Comparison of Two Failure Criteria for the Assessment of Haulage Drift Stability Using Stochastic Analysis and Numerical Modelling

    By Wael Abdellah

    Mine haulage drifts are the primary access to the mining blocks of an orebody in a multilevel mining system of a tabular ore deposit. The stability and functionality of haulage drifts are thus crucial

    Jun 1, 2012

  • CIM
    Aging effects in 319 alloys

    By N. R. Andrade-Gonzalez

    The present work was performed on four alloys containing Al-6 2 wt pct Si-3 5 wt pet Cu, with magnesium in the range of 0.02-0 40 wt pct, and strontium in the range of 0-165 p p m Tensile bars were ca

    Jan 1, 2004

  • CIM
    Effect of Curing Time on Copper Leaching From Chalcopyrite

    By A. Roca, V. A. Quezada, O. A. Benavente, M. Cruells

    The leaching pretreatment of copper ores is widely used in the Chilean mining industry. Agglomeration and acid curing have been identified as the most useful pretreatments. Of these, acid curing was r

    Jan 1, 2019

  • CIM
    An Update On The Arsenic Speciation In The Jeb Tailings Management Facility At Mcclean Lake Saskatchewan Via X-ray Absorption Near-edge Structure (Xanes) Spectroscopy

    By J. Warner, K. A. Hughes, P. E. R. Blanchard, J. Esslifie-Dughan, J. W. Reid

    Tailings management plays an important role in reducing the environmental impact of Orano Canada’s uranium mining operations in Northern Saskatchewan. Uranium ores mined from Northern Saskatchewan are

    Jan 1, 2020

  • CIM
    Wall Control Techniques at Inco's Pipe Open Pit

    By J. Janeson

    Wall control at the Pipe Open Pit is of primary importance in ensuring the long-term stability of the operation, while keeping costs to a minimum. Blasting techniques have been adapted to the variatio

    Jan 1, 1979