Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    A Moveable Mineral Processing Miniplant

    By P. Wells, P. Quinn

    "A moveable flotation miniplant was designed and constructed at the research laboratory of Inco Technical Services Ltd. to address the need for flowsheet development with a limited amount of ore (such

    Jan 1, 2003

  • CIM
    Optimizing performance of AG/SAG mills – A design approach

    By Sanjeeva Latchireddi, Travis Orser

    "Today’s high capacity semiautogenous grinding (SAG) mills expend vast amounts of energy and in doing so consume tons of shell liners and steel balls, while processing ore. The energy efficiency of th

    Jan 1, 2005

  • CIM
    Paste Backfill Strength Behaviour Using Different Binding Agents and Binder Combinations

    By Philip A. Dirige

    This paper presents the variability of responses of paste backfill specimens that have been prepared with varying binding agent and binder combinations, when subjected to uniaxial compressive strength

    May 1, 2006

  • CIM
    Process design considerations for the fluidized bed technology applications in the nickel industry

    By K. Adham, C. Lee

    Over the last forty years, a number of specific fluidized bed applications in nickel extraction have been developed for commercial use. Five important processes have gained particular acceptance, name

    Jan 1, 2004

  • CIM
    Innovative Technologies for Copper Smelting and Electric Slag Cleaning and Matte Settling Furnaces

    By A. Esterhuizen, S. Essack, H. Joubert, N. Fowler

    Tenova Pyromet has developed innovative technologies for copper smelting and electric slag cleaning furnaces. Based on client feedback and requirements, innovative designs have been developed to addre

    Jan 1, 2019

  • CIM
    Engineered Membrane Separation® (EMS®) Systems for Hydrometallurgical Applications

    By Larry A. Lien

    "A brief summary of the different membrane separation options currently available to the mining industry will be presented and discussed. The processes described involve operating membrane plants on t

    Jan 1, 2010

  • CIM
    Fluid Inclusion and Stable Isotope Study of the Buffalo Gold Deposit, Red Lake Greenstone Belt, Northwestern Ontario, Canada

    By G. Chi, A. Solomon, J. Lai

    "The Buffalo gold deposit is a small deposit consisting of auriferous quartz-tourmaline veins within a granodiorite stock in the Red Lake greenstone belt. This study aims to characterize the mineraliz

    Jan 1, 2009

  • CIM
    Economic Recovery and Upgrade of Metals from Middling and Tailing Streams (c573bdd5-90fc-4072-9ce3-2caa48051cb4)

    "As mine head grades decline and orebodies become more complex, traditional mineral processing techniques and flowsheets to achieve saleable concentrate become more difficult to design and construct.

    Jan 1, 2017

  • CIM
    Forecasting Potential Slope Failure in Open Pit Mines -Contingency Planning and Remediation

    By Nick D. Rose

    Outline ?Background ?History of inverse-velocity for failure prediction ?Methodolog ?Case Histories ?Three case examples of predicted slopefailure to actual date of occurrence ?One case example

    May 1, 2006

  • CIM
    Some Insights into the Process Design of Ferronickel Smelters

    By S. Mostaghel, S. Nicol, M. Y. Solar

    Once upon a time, the process engineer developing the design criteria for a new saprolite ferronickel smelter had it easy: most ores were around 2.5% Ni, with a Fe/Ni ratio of 4 to 5 and a SiO2/MgO ra

    Jan 1, 2014

  • CIM
    Haldor Topsoe’s Catalytic Advances Result in Dramatically Lower So2 Emissions

    By Patrick Polk

    For many years, sulfuric acid producers all over the world have been forced to meet ever more strict environmental regulations to reduce SO2 emissions. The sulfuric acid industry has implemented new s

    Jan 1, 2014

  • CIM
    Energy Savings and Improved Recovery with Small Grinding Media

    By Michel Brissette

    "To recover more valuable ore and considering the complexity of minerals, the needs to grind finer is increasing. To reach the desired fine grinding targets, using the existing grinding media size, th

    Jan 1, 2009

  • CIM
    Turnagain Nickel Project: Playing a Key Role in the Development of Northwestern BC

    By Ed Beswick

    Resource Update Drilling Program ? Pre-feasibility ? Exploration Metallurgy Program ? Grindability ? Metallurgical Optimization ? Hydrometallurgical Options Preliminary Mine Development Design

    May 1, 2008

  • CIM
    Effect of Operating Variables in Knelson Concentrators: A Pilot-Scale Study

    By Sunil Koppalkar, A. R. Laplante

    "A Pilot Plant was installed in one of the grinding circuits of the Dome Mill, Ontario, Canada. Tests were conducted on a KCCD12 Knelson Concentrator to systematically analyze the effect of operating

    Jan 1, 2007

  • CIM
    Control of Bias and Level in a Laboratory Flotation Column

    By André Pomerleau, Michel Grégoire, René del Villar

    "The operation of industrial flotation columns requires the control of at least two variables, the interface position and the bias rate, by manipulation of some appropriate operating variables. Proble

    Jan 1, 1999

  • CIM
    The Boseto Copper Project

    By Brad Sampson

    Project Ownership ?Discovery Metals Limited ?ASX (DML), BSX (DML), AIM (DME) ?Market Cap AUD 195M ?Key assets ?Boseto Cu ?Dikoloti Ni The Boseto Copper Project ?Location ?Setting ?History

    May 1, 2010

  • CIM
    Environmental Regulation and Compliance - A Summary

    By S. W. Stogran

    "A brief summary of the environmental testing and analyses required to ensure and maintain compliance of mining properties will be discussed. Programs for new and existing properties and for propertie

    Jan 1, 1992

  • CIM
    Design, Construction and Commissioning of Gold Tailings Plant at Mazowe Mine, Zimbabwe

    By Peter Makuvise, Alain M. Bantshi

    "The Mazowe Gold Mine is managed by Metallon Gold (Zimbabwe) and is situated in the west-central part of the Harare greenstone belt. Orebodies here generally comprise shear zones which are in-filled w

    Jan 1, 2017

  • CIM
    Design, Testing and Performance of the World?s First Fuelcell Mine Vehicle, a Production Locomotive

    By Marc C. Bétournay

    A mine production locomotive, the world?s first applied industrial fuelcell vehicle, has been designed and tested in the context of a number of proof-of-concept projects supported by the Fuelcell Prop

    May 1, 2003

  • CIM
    Evaluation of the Efficiency of Several Airborne Electromagnetic Systems: Exploration Implications

    By D. Bois, P. Keating, J. Lemieux, M. A. Vallée, M. Allard, R. S. Smith, L. Z. Cheng, M. Chouteau, K. Fountain

    "A comparison of data from INPUT, GEOTEM, and MEGATEM airborne electromagnetic (AEM) systems over the Aldermac deposit, Québec, Canada, was undertaken to evaluate the relative ef¬ficiency of these sys

    Jan 1, 2009