Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Starting Koala North — North America’s first underground diamond mine (3411bd0a-cb31-4972-a1b8-9d78990f23d8)

    By P. Harvey

    "Following initial discovery in 1991, BHP Billiton Diamonds Inc. opened Canada’s first diamond mine, the EKATI Diamond Mine (EKATI) in the Northwest Territories on October 14, 1998. Four short years l

    Jan 1, 2005

  • CIM
    Life-of-Mine Ventilation Planning at Diavik

    By R. D. Clarke, E. De Souza

    "A framework for ventilation planning, with a focus on planning to the end-of-mine life, was developed for the Diavik Diamond Mine, Northwest Territories. This framework was successfully used by Diavi

    Jan 1, 2018

  • CIM
    The mineralogy of silver and its significance in metal extraction

    By Claudia Gasparrini

    "Silver occurs in about 200 minerals in variable amount s. Silver ores usually have 5 or 6 and in some instances as many as 10 species of silver minerals. All these minerals may have different flotati

    Jan 1, 1984

  • CIM
    Use of Coal for Treatment of a Pulping Waste

    By F. Daniel Rosenkranz, Peter L. Silveston

    Experiments investigating the treatment of a ground wood white water waste from an Ontario pulp and paper mill by an HVCB coal are reported. Adsorption capacity for the waste, with a soluble COD contr

    Jan 1, 1970

  • CIM
    Peat Moss -A Natural Adsorbing Agent for the Treatment of Polluted Water

    By J. M. Janssens, Van Quach Tinh, M. Ruel, R. Leblanc

    "Microscopic studies of peat moss indicate a highly porous material. In view of using this natural product as an adsorbing agent for the treatment of polluted water, studies of its adsorbing power for

    Jan 1, 1971

  • CIM
    The Influence of Shales on Slope Instability

    "Shales play a major role in the stability of slopes, both natural and engineered. This paper attempts to provide a review of the state-of-the-art in shale slope stability. The complexities of shale t

    Jan 1, 2015

  • CIM
    Concentration of Tantalum .from the Bernie Lake Pegmatite Deposit, Manitoba

    By D. Raicevic

    Interest has recently been revived in the recovery of tantalum from the Bernie Lake pegmatite deposit. A gravity concentration process was developed to give satisfactory recovery and concentrate grade

    Jan 1, 1968

  • CIM
    Ventilation Cost Savings Using Localized Haul Truck Power Reduction

    "An innovative concept is proposed whereby the operating power for haul trucks in certain areas of an underground mine are reduced in order to lower ventilation costs. Airflow that must be provided fo

    Jan 1, 2017

  • CIM
    Geology of the Asbestos Hill Area

    By Ralph V. Stewart

    "The asbestos orebody is contained within ultrabasic rocks of Precambrian age, being located in the continuous permafrost zone of the Quebec Ungava Peninsula, some 300 miles north of the tree line at

    Jan 1, 1976

  • CIM
    Sinking of Two Freeze Shafts Using Shaft Boring Roadheader (SBR) Technology for the Slavkaliy Nezhinsky Potash Mine in Belarus

    By Frank Otten, Jochen Greinacher

    "In July 2017, Deilmann-Haniel signed a contract with IOO Slavkaliy to sink two 750 metre (m) deep freeze shafts for the Nezhinsky Potash mine in Belarus. This is the second shaft project where this t

    Jan 1, 2019

  • CIM
    Some Major Structures of the Canadian Shield

    By J. Tuzo Wilson

    Abstract A division of part of the Canadian Shield into provinces believed to represent former mountain belts is attempted, special emphasis- being laid upon radioactive age determinations, the rel

    Jan 1, 1949

  • CIM
    Penasquito Project ?Achieving Success in Challenging Times

    CHALLENGES TO SCHEDULE/BUDGET Shortage of people (contractors, vendor support, engineering, staff) 2007 projects off the shelf Increase in metals prices Shortage of large tires Reserve increase

    May 1, 2010

  • CIM
    Lucky Friday’s No. 4 Shaft - Ten Years from Concept to Completion

    By David Berberick

    "Hecla Limited’s No. 4 Shaft at the Lucky Friday Mine is the largest capital expenditure in the corporation’s 128-year history and is considered the deepest shaft in the United States. This paper will

    Jan 1, 2019

  • CIM
    Bibliography and Index of Coal in Saskatchewan and Adjoining Provinces & States

    By Carol A. Pilon

    "IntroductionRECENTLY, the Saskatchewan Research Council (Saskatoon ) marked the completion of one of its coal-related projects with the publication of the Bibliography and Index of Coal in Saskatchew

    Jan 1, 1977

  • CIM
    The Geology of Parts of Lots 11 and 12, Range IX, Calumet Island, Quebec

    By John Gittins

    Lots 11 and 12, Range IX, Calumet island, are underlain by a Grenville metamorphic complex into which sills of tourmaline granite pegmatite have been injected. The pegmatite has an average mode-potash

    Jan 1, 1956

  • CIM
    Improving the Performance of the Hardy Cross Algorithm for Large Ventilation Models

    "The Hardy Cross algorithm offers a reliable method of solving network systems of fluid flow and has become widely used for solving water and ventilation flow networks. A limitation is that computatio

    Jan 1, 2019

  • CIM
    Quality of working life in the mining industry-a physician's prescription

    By Ian M. F. Arnold

    "Occupational health programs and their role in improving the quality of working life in the mining industry are discussed. Attention is directed to some problems peculiar to the Canadian mining indus

    Jan 1, 1983

  • CIM
    Synthesis of Magnetic Shell/Core Composites for Applications in Hydrometallurgy: Pyrite/Magnetite

    By G. Viramontes-Gamboa, A. Encinas-Oropesa, S. Velázquez-Roque, L. A. Ibarra-Bracamontes

    Some industrially relevant applications for pyrite nano/micro-particles have been proposed in the literature, such as the catalysis of chalcopyrite leaching, the removal of As(III), As(V) and Cr(VI) f

    Jan 1, 2014

  • CIM
    Sinking and equipping the Kidd Creek No.2 Shaft

    By D. L. Mckay

    "Texasgulf's 25-foot-diameter Kidd Creek No. 2 Shaft is situated next to the company's No .1 Shaft, so that both shafts can share common surface and underground facilities. Shaft constructio

    Jan 1, 1981

  • CIM
    Elk River Colliery

    By W. C. Whittaker

    COMPLETED in November, 1943, at a cost of over $1,500,000, Elk River colliery of the Crow's Nest Pass Coal Company, Limited, has been laid out and equipped for an ultimate annual production of 1,

    Jan 1, 1944