Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    MODERN SEAFLOOR HYDROTHERMAL DEPOSITS - OCEAN RIDGES - Diffuse-flow Hydrothermal Field in an Oceanic Fracture Zone Setting, Northeast Pacific: Deposit Composition

    By James R. Hein, Jane Reid, Robert W. Embley, Se-Won Chang, Randolph A. Koski

    "Abstract - This is the first reported occurrence of an active hydrothermal field in an oceanic fracture zone setting. The hydrothermal field occurs in a pull-apart basin within the Blanco Fracture Zo

    Jan 1, 1999

  • CIM
    An Elasto-Viscoplastic Anisotropic Damage Model for Frozen Soil and its Damage Analysis

    By Xing-Liang Sun, Xian-Min Han, Zheng-Guo Zhu

    The study on the material properties of frozen soils in China was being developed quickly in the past decades of years, because of the increase of the engineering constructed in frozen soil regions on

    Jan 1, 2015

  • CIM
    Automated Shovel Tooth Wear Monitoring with Machine Vision

    By Matthew A. Baumann

    Tooth wear on mining shovels presents a challenge for productivity. A shovel with worn teeth suffers from increased digging forces, longer fill times, and an increased likelihood of lost or broken tee

    May 1, 2011

  • CIM
    Vision Zero ? The New Global Strategy for Safe Mining

    By Helmut Ehnes

    Over 330 million accidents at work happen world wide every year, only counting those leading to more than four days absence. More than 350,000 end fatal. Two million people more die every year due to

    Aug 1, 2013

  • CIM
    Effect of welding speed on Nd:YAG laser weldability of ZE41A-T5 magnesium sand castings

    By H. Al-Kazzaz

    The 2-mm butt joints of ZE41A-T5 sand castings were laser welded using 1.6 mm EZ33A-T5 filler wire and a continuous wave Nd:YAG system at a power of 4 kW, surface defocusing and various welding speeds

    Jan 1, 2005

  • CIM
    Development of manufacturing process of wrought magnesium alloys by semi-solid roll strip casting

    By H. Watari

    In 1998, a voluntary agreement was reached between the European Commission and the European Car Manufacturers Association (ACEA) to reduce average carbon dioxide emissions of new cars to 25% below 199

    Jan 1, 2005

  • CIM
    Mechanism of Scorodite Formation at Ambient Temperature as Determined by Tem Analysis

    By H. Itou

    A mechanism of scorodite formation at ambient pressure was investigated using transmission electron microscopy (TEM). Several types of iron arsenate were obtained from Fe/As solutions (Fe/As = 1.0 and

    Jan 1, 2006

  • CIM
    Benefits of the Presence of Iron in Uranium Processing

    By E. Özberk

    Uranium minerals are often associated with iron minerals, and during the hydrometallurgical processing of the uranium ores, iron plays several significant roles. The presence of Fe(III) in solution pr

    Jan 1, 2006

  • CIM
    The Pursuit of Environmental Friendly Operations in Canadian Sulphide Smelting Torstein Utigard Symposium on Pyrometallurgy 54th Annual Conference of Metallurgists Held in Conjunction with AMCAA-America’s Conference on Al Alloys

    By S. W. Marcuson, P. J. Mackey

    The Canadian non-ferrous mining and metallurgical industry has made great strides in environmental protection during the past half century. The path taken by the copper-nickel smelting industry in rea

    Jan 1, 2015

  • CIM
    Principles and Practice of Metallurgy at Falconbridge

    By A. Gronningsater

    Introduction As is well known, the fight between the blast furnace and the reverberatory furnace in copper smelting during the second decade of the century ended with a victory for the latter, a resu

    Jan 1, 1934

  • CIM
    Practical rock engineering in the optimization of stope dimensions – application and cost effectiveness

    By J. W. Bawden, J. Nantel

    "The mine operator has two prime objectives when he operates a mine: (l) the mine must be safe, and (2) the mine must operate with the lowest possible costs. The operator constantly faces a dilemma; i

    Jan 1, 1989

  • CIM
    Heap leaching-a low-cost recovery method for small gold deposits in northwestern Ontario

    By R. C. Beard

    "Heap leaching, currently being applied in the treatment of low-grade ores in the south western United States, is shown to have potential for use in north western Ontario. The history and operation of

    Jan 1, 1983

  • CIM
    Stabilization and regeneration of Ce02 and Ce02/Zr02 based Pt catalyst for the water gas shift reaction

    By R. M. S. Häggblad

    The article deals with stabilisation and regeneration of Ce02 and Ce02/Zr02 based Pt water gas shift catalysts, subject to high initial deactivation. The reaction gas species effect on the catalyst de

    Jan 1, 2005

  • CIM
    Mineralogy And Modelling – Predicting Uranium Leach Extraction At Olympic Dam

    By B. Pewkliang, K. Ehrig, E. Macmillan, M. Smith, V. Liebezeit, Y. Li

    The Olympic Dam iron-oxide copper-gold (IOCG) uranium-silver deposit is the largest publicly declared uranium, fifth largest copper and third largest gold resource. Currently, the operation consists o

    Jan 1, 2020

  • CIM
    Some Factors in 'Freezing' in Naphtha-Producing Wells in Turner Valley

    By W. P. Campbell

    Foreword At the outset, it should be stated that this paper does not pretend to present a panacea for the ills that 'frozen' wells are heir to, but rather is an attempt to bring to the at

    Jan 1, 1930

  • CIM
    Pilot Test Of The Permeable Reactive Barrier For Removing Uranium From The Flooded Gunnar Pit

    By D. Kong, A. Klyashtorin, L. McGilp, I. Wilson

    This work reports on applying iron oxide coated sands media in an experimental permeable reactive barrier to remove uranium species from uranium containing water. A field experiment was conducted at t

    Jan 1, 2020

  • CIM
    Obtaining Maximum Value from Metallurgical Projects - Avoid Throwing it Away

    By A. Eltringham

    Operations downstream of mining and beneficiation are still being subjected to increasing scrutiny as highly capitalized projects have been either slow to achieve their targets or have actually failed

    Jan 1, 2011

  • CIM
    Modeling of the Direct-to-Copper Flash Smelting Process

    By M. Kucharski

    The model of the Outokumpu direct-to-copper process deals with a steady-state process the parameters of which do not depend on time. To give a prediction for the process outcome, "a modified black box

    Jan 1, 2007

  • CIM
    Solubility of MgO in High Cu2O Slags in Equilibrium with Cu Metal

    By T. Crivits

    "Phase equilibria in the ‘Cu2O’-‘Fe2O3’-SiO2 system, the base slag system in copper production, were recently determined. However, the addition of MgO, commonly present in the slag, drastically change

    Jan 1, 2014

  • CIM
    Iron Reduction in Copper Leach Liquors Using Controlled Precipitation of Sulfate Species during High Temperature Pressure Oxidation of Base Metal Ores

    By J. C. Gathje

    Newmont's Phoenix Project is located near Battle Mountain, Nevada and is scheduled to produce copper concentrates containing high precious metal values. High temperature pressure oxidation (PDX)

    Jan 1, 2006