Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Achieving Reliability from Data at Cerrejón Coal

    By Gerardo Vargas

    Without an adequate data sample there can be no Reliability Analysis (RA). Without analysis there can be no systematic, verifiable improvement in reliability or in operational economy. A sample is a c

    May 1, 2011

  • CIM
    Optimum Equipment Management through Life Cycle Costing (c0e511d8-44ab-43ca-828c-72662e49cf23)

    By Jessica Barber

    Problem ? Mining operations consistently need equipment that is available, and able to perform to its maximum potential ? The most difficult part of a Maintenance Manager?s job is often a lack of kn

    May 1, 2008

  • CIM
    Seismic source parameters used to monitor rockmass response at Brunswick mine (5a673da7-13e1-42d4-880a-c4441be71d76)

    By B. Simser, V. Falmagne

    "Noranda’s Brunswick mine is a 10 000 t/d producer of lead-zinc-copper-silver ore that has been in operation since 1964. Mining of this multiple lens deposit is primarily by blasthole stoping techniqu

    Jan 1, 2004

  • CIM
    Seismic source parameters used to monitor rockmass response at Brunswick Mine

    By B. Simser

    Noranda?s Brunswick mine is a 10 000 t/d producer of lead-zinc-copper-silver ore that has been in operation since 1964. Mining of this multiple lens deposit is primarily by blasthole stoping technique

    May 1, 2004

  • CIM
    A Novel Approach to Recover Precious Values from Low-Grade Canadian Ores

    By V. I. Lakshmanan, D. A. Mackie

    "1. INTRODUCTIONIn the past two decades, low-grade gold and silver ore bodies in the United States have been exploited by heap leaching, primarily with sodium cyanide solutions. This method has proven

    Jan 1, 1989

  • CIM
    Adapting to Ore Characteristics at Lac des Iles Mine

    By Erin N. Legault-Seguin

    The Lac des Iles Mine (LDI) is located approximately 100 km northwest of Thunder Bay, ON. The mine has been in operation since 1993. The initial mine production was 2,300 mtpd and increased to 15,000

    May 1, 2009

  • CIM
    The Seabee Gold Mine Uncommon Accomplishment

    By Neil McMillan

    "By any measure of common practice, Claude Resources' Seabee Gold Mine in Northern Saskatchewan should not now be operating. Not because reserves dwindled, or grade dropped or prices weakened or techn

    Jan 1, 1998

  • CIM
    Prospecting the Future: Meeting Human Resources Challenges in the Canadian Minerals and Metals Industry

    By Ryan Montpellier, Paul Hebert

    "Prospecting the Future: Meeting Human Resources Challenges in Canada's Minerals and Metals Sector is a comprehensive sector study of the short- and long-term human resource issues and challenges faci

    Jan 1, 2007

  • CIM
    Backfill Practice at Copper Cliff North Mine (CCNM)

    By Ike Isagon

    Backfilling has become an integral process in underground mining operations, with varying cost-effective forms of application. This study is a part of an overall investigation into the backfill practi

    May 1, 2011

  • CIM
    The Polaris Process Barge (413f976a-6a5f-4235-9531-1db4119721bb)

    By J. K. Gowans

    "INTRODUCTIONTo bring a mining property into production in the Canadian High Arctic a company must deal with the harsh environment, the short shipping season and the high cost of labour. In trying to

    Jan 1, 1983

  • CIM
    Low-Grade Cu-Au Deposits: Predicting the Relationship between Copper and Gold Performance in Flotation and the Potential for Gravity Gold Recovery

    By Jan E. Nesset, Phillip J. Mackey, Joo Y. Kim, Giovanni Di Prisco, André R. Laplante

    Understanding the appropriate gold recovery to associate with copper recovery when assessing laboratory testing on porphyry deposits is often complicated by several factors including variable and/or c

    Jan 1, 2005

  • CIM
    Energy/GHG Management Assessment Using TSM Indicators

    By Lauri Gregg

    Key Message Energy focused Change Management Process that engages operations managers is the missing tool needed to build capacity for energy/GHG management

    May 1, 2007

  • CIM
    Estimation of Iron Ore Resources Integrating Diamond and Percussion Drillholes

    By Jacques Deraisme

    The technology of percussion drilling is well mastered. The lower cost of percussion drilling allows more holes to be drilled for the same budget. However significant differences are often observed be

    Oct 1, 2009

  • CIM
    A review of binder materials used in stabilized backfills

    By J Petrolito

    "To improve the economic and environmental performance of underground mining operations, it is common practice to return the metallurgical waste material underground as backfill. This is called hydrau

    Jan 1, 2005

  • CIM
    Cyclone Modelling - Case Studies

    By R. N. Murarka

    "Hydrocyclone modelling and selection procedure is illustrated. Computerized procedure for hydrocyclone cut size determination for grinding and non-grinding applications is described.A standard proced

    Jan 1, 1992

  • CIM
    Fuelcell Versus Diesel Loader Operation: Cost-Benefit Analysis Study

    By Marc C. Bétournay

    Under the requirement to define the economic advantages of using hydrogen fuelcell vehicles, a broadscoped project was initiated to quantify the costs associated with operating fuelcell vehicles and d

    May 1, 2003

  • CIM
    The Role of Oxygen Demand in the Flotation of a Complex Sulphide Ore (7422717d-0c76-4628-a6fb-8038409d5379)

    By C. Carlson, W. Muir

    "The oxygen demand of the complex lead-zinc-iron feed at the Cyuro Anvil concentrator was determined denendent on the cyanide ion con-contration of the pulp. By redistribution of the cyanide [ ] the g

    Jan 1, 1976

  • CIM
    Use of the Enviro-Clear Thickener at Quirke Mill

    By H. Ewaschuk

    "INTRODUCTIONRio Algom's involvement with the Enviro-Clear thickener began in May 1975, when tests on a laboratory waif were carried out by our Research and Development group. Commencing in June, furt

    Jan 1, 1977

  • CIM
    Integrated Grinding and Flotation Simulations for the Improvement of Circuit Performance at BHP-Billiton’s Minera Escondida

    By H. E. Urtubia, C. W. Bailey

    "BHP-Billiton’s Minera Escondida Limitada is one of the world’s largest copper producers. It treats a combined 88 million tons of copper ore per year through its two concentrators: Los Colorados and L

    Jan 1, 2007

  • CIM
    White Pass and Yukon Route

    By C. J. Brown

    "Access to the outside world is supplied by the Alaska Highway to continental Canada and the United States, the Haines Highway, and by the White Pass & Yukon Route to Skagway and Vancouver. Communitie

    Jan 1, 1973