Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    The Effect of Highly Saline Ground Water on the Gold Adsorbing Capacity of Ion-exchange Resins

    By Browner R, Kyle J

    The adsorption of gold cyanide by the weak base ion exchange resins, PAZ-4¦ and Duolite A-7C, the neutral polymeric adsorbent, Amberlite XAD7¦, and the strong base resins, PAZ-8~a and IRA-400 have b

    Jan 1, 1991

  • AUSIMM
    Adoption of an Integrated Mine Water Management Approach Provides Environmental, Social and Economic Benefits

    By R Vleggaar

    In addressing a short-term operational need for the relocation of a tailings storage facility reclaim pond, a mine has achieved a host of water management objectives. Through effective planning and ad

    Jan 1, 2006

  • AUSIMM
    Rare Earth Element Mobility in Arc-Type Volcanic Rocks

    By Smith IEM

    Some samples from arc-type volcanic suites collected in northern New Zealand and southeastern Papua New Guinea show rare earth element (REE) and Y abundances which are enriched relative to the those t

    Jan 1, 1990

  • AUSIMM
    Redistribution of Gold in the Oxidized Zone of some Western Australian Deposits

    Solution transport of gold and silver has occurred as a result of the chemical weathering of many Western Australian epigenetic gold deposits. Evidence for the remobilization of gold exists in the for

    Jan 1, 1984

  • AUSIMM
    Chemistry of Coal Utilisation in Flash Smelting

    By Okura T, Hino J

    Coal utilization for copper flash smelting in Japan was initiated due to the sudden upheaval in the price of oil in the last ten years. A major portion of the heavy fuel oil has already been repla

    Jan 1, 1987

  • AUSIMM
    Errors in Sampling Rock Fragmentation from Images

    The basic purpose of blast design is to produce rock in a size range which is within the requirements of the materials handling system. Once this is achieved, one would like to find the fragmentation

    Jan 1, 1976

  • AUSIMM
    Formalised Blasting Rules: A Case-Specific Approach

    By D Nourry

    Optimising the blast is a major issue in the blasting business. It generally means acting on the blasting pattern (drilling, charging, detonating) in order to get a given æresultÆ. This result may eit

    Jan 1, 2001

  • AUSIMM
    Predictive Assessment of Surface Blast Vibration

    By A J. Moore

    Predictive assessment of surface blast vibration requires the identification and quantification of significant factors, and the summation of their combined effect. Methods available for the prediction

    Jan 1, 1999

  • AUSIMM
    Cenozoic Tectonic of North Sumatera with Particular Reference to the Sumateran Fault System

    The application of modern sciences prior to nineteenseventies have resulted in the placing of Continental Drift theory into broader concept of Plate Tectonics. The concept is applied to explain the Ce

    Jan 1, 1990

  • AUSIMM
    Gold Mineralisation along the Nam Xiang Fault, Vieng Kham Project, North-east Laos

    By M J M Cunningham, M Greentree, J H Liu

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Palaeozoic rocks of north-eastern Laos are an attractive target for gold explorers due

    Mar 18, 2015

  • AUSIMM
    Biological Column Leaching of Chalcocite Ore

    A biological column leach testwork program was undertaken on a chalcocite ore. Three tests were conducted in all, using 65 in x 100 mm columns in three sections. The tests were started with varying

    Jan 1, 1994

  • AUSIMM
    Selection of an Ore Haulage System for Telfer Deeps

    By P J. Ellen

    The selection of the ore haulage system is a key decision made in the development of an underground mine. The haulage system is one of the components that define a mineÆs ability to respond to changes

    Jan 1, 2005

  • AUSIMM
    The Modelling and Control of Refrigeration Plant Used in Cooling System on Deep South African Gold Mines

    Many of the large refrigeration plants used in, the cooling systems on deep South African gold mines are situated on surface where they are exposed to seasonally and diurnally varying climatic conditi

    Jan 1, 1985

  • AUSIMM
    Estimation and Reporting of Copper Ore Reserves at Mount Isa Mines Limited

    In line with the recommendations of The AusIMM/AMIC Joint Committee Report in 1981 Isa Mine ore reserves are quoted in proven and probable categories (recoverable ore reserves). Internal reporting

    Jan 1, 1987

  • AUSIMM
    Chalcopyrite Flotation and Liberation Characteristics Before and After Autogenous Grinding at Mount Isa Mines Limited

    By Espinosa-Gomez R, Johnson NW

    The Copper Concentrator at Mount Isa Mines Limited treats on average 18 000 tonnes/day of chalcopyrite ore containing typically three per cent copper. The main gangue minerals are iron sulphides (-1

    Jan 1, 1993

  • AUSIMM
    Equivalent Rock Column Design System for Tunnel Liners and Underground Structures Incorporating Rock Restraint

    An approximate rapid design system for tunnel liners and underground structures is presented which permits the effects of structure geometry and stiffness, rock quality in terms of its deformation

    Jan 1, 1976

  • AUSIMM
    Gas Properties of Australian Coal

    By Hargraves A. J

    At 4 MPa gas pres ure and 30°C the sorptive capacity of 10 selected Australian dried coal ranges from 17 to 23 m3/tonne of CH4 and 27 to 36 m3/tonne of CO2. Values for moist coals are about 25 pe

    Jan 1, 1985

  • AUSIMM
    The Impact of Explosive Performance on Quarry Fragmentation

    By Cox N

    Fragmentation control is perhaps the most critical aspect of quarrying operations, potentially impacting on the costs of all down stream processes, and sometimes even on the economic viability of an

    Jan 1, 1995

  • AUSIMM
    Ore Breaking and Handling at The C.S.A. Mine, Cobar

    Parallel lenticular orebodies occurring at the C.S.A. mine of Cobar Mines Pty. Ltd. are mined by mechanized cut and fill stoping over the full strike length. Access is provided for each stope lift fro

    Jan 1, 1969

  • AUSIMM
    Mount Isa Mines Copper Concentrator - An Insight into Current and Historical Practice

    By P Radulovic, W Y. Lui

    The Mount Isa Mines (MIM) copper concentrator at Mount Isa processes both chalcopyrite ore from the MIM underground mine and rotary holding furnace (RHF) slag from the MIM copper smelter. There have b

    Jul 15, 2013