Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Applications of Advanced Remote Sensing Systems during a Mine LifeBy B P. Banerjee, S Raval
In the recent past there have been dramatic advancements in the development of remote sensing platforms (satellite, aircraft and unmanned aerial vehicles – UAVs) as well as sensor systems (multispectr
Jun 28, 2016
-
Applying Controlling Blasting to Minimise the Damage at the Water Dam Ramp 23 at Ensham ResourcesBy I Villalba
The need to continue the development of the Ensham mine has led to blast up to 75 m to the Eastern side of a water dam in the vicinity of Ramp 23. The water dam wall is exposed to blasting over a
Nov 8, 2011
-
The Development of a Procedure for the Inspection of Unlined Rock Service TunnelsBy D Lees, D Gilchrist
Sydney has hundreds of kilometres of sewer tunnels. Many of these are over 50 years old and some have been in service for more than 100 years. The tunnels are predominantly constructed in Hawkesbury S
Sep 17, 2014
-
Historical Challenges, Modern Solutions at Ballarat EastBy M Sykes
Gold was initially discovered at Ballarat in 1851. After initial alluvial mining, underground quartz mining commenced in 1853, continuing until 1918. The historic miners were considered to be capable
Jan 1, 2008
-
Jaguar Base Metals Project Case Study – Has Reality Reflected the Study?By R Jacobs
"The Jaguar project is relatively unique in that it was evaluated, financed, built and operated to completion within the last ten years, providing the opportunity to holistically review and reconcile
Mar 8, 2016
-
Case studies illustrating the role of F-series mine reconciliations in production forecast improvement initiativesBy S J. Loach
F-Series reconciliations are formal comparisons of estimates and measurements of ore quantity and quality made at pre-determined points along the mining value chain. F1 is the ratio of ‘Depleted Grade
Sep 18, 2023
-
Analysis and Adaptability of Belt Filter Presses and Other Technologies for Tailings Dewatering over a Range of Mineral Processes, Plant Designs, Conditions, Regions and Operating PhilosophiesBy M S. Fenzel
Increased environmental regulations and pressures have created changing and new demands for tailings management strategies in a variety of mining applications. Critical among these items is the dispos
Jul 27, 2015
-
Housing Stress and Location Choices in Bowen Basin Mining Communities - A Case Study of MoranbahBy S Lockie, G Ivanova, J Rolfe
One of the consequences of mining expansion in the Bowen Basin region of Central Queensland in Australia has been a substantial increase in demand for housing, with subsequent impacts on housing and r
Jan 1, 2009
-
Measurement of Residual Shear Strength Using a Modified Direct Shear ApparatusBy L Tatnell, R Mackay, A Tolooiyan
The multi-reversal direct shear test (MRDS) method is commonly used to measure the residual shear strength of soils. However, when the standard direct shear (DS) apparatus is used, the MRDS method is
Nov 5, 2014
-
Developments in Tube Bundle Gas MonitoringBy M Watkinson
Tube bundle monitoring systems have come a long way from their first introduction to coal mining in the late 1960s/1970s. Early developments in the United Kingdom (UK) commenced with single gas analys
Aug 31, 2015
-
Learnings from review of drawpoint management across New South Wales minesBy X Hill
Throughout the 2016/2017 financial year, the NSW Resources Regulator conducted an assessment of each underground metalliferous operation across the state to assess how each operation managed the princ
Oct 16, 2017
-
Trials, Tribulations and Triumphs of Unmanned Aerial Vehicle Surveying at St Ives Gold MineBy R Steven
"Surveying, and as a result, surveyors, have been around since the start of time, and it has been said that so has their methodology!The theodolite and tape have been the backbone of a time-tested pra
Nov 15, 2016
-
Probabilistic Slope Design and its Use in Iron Ore Pit OptimisationsThe current economic climate and demand for iron ore has resulted in mine operators being prepared to accept aggressive slope designs and associated failures provided that they can be quantified (ie v
Jan 1, 2009
-
Exploring Optimised Delay Timing for FragmentationBy C K. McKenzie
As more and more mining operations around the world either switch to, or trial, electronic initiation systems, the breadth of knowledge and experience regarding their effective application has widened
Nov 8, 2011
-
Unmanned Aerial Robots for Remotely Operated and Autonomous Surveying in Inaccessible Underground Mine VoidsBy A Grace, C Sennersten, T Taylor, A Davie, R Lyu, D Pentecost, C A. Lindley, J Craig, L De Macedo Camargo
Many underground mine void spaces are not suitable for human entry due to unprotected roofs, instability or having an unknown safety state (eg if they are many decades old). Investigations of these vo
Nov 4, 2015
-
The MRMR Rock Mass Rating Classification System in Mining PracticeBy D H. Laubscher
The in situ rock mass rating system û IRMR - leading to the mining rock mass rating system - MRMR - for jointed rock masses has been used (and abused) in mining operations around the world for the pas
Jan 1, 2000
-
The Challenge of Waterproofing Cross Passages in Segmentally Lined Tunnel Boring Machine TunnelsBy E P. O’Dwyer
Segment and gasket lining in tunnel boring machine (TBM) tunnels; and sheet membrane lining systems in driven tunnels are robust waterproofing systems each with a proven history of performance in Aust
Sep 17, 2014
-
Brave New Mine – Examining the Human Factors Implications of Automation and Remote Operation in MiningBy T Horberry
This paper describes work conducted as part of an overall research project that aims to identify current and emerging trends in the development of automation and remote mining technologies, and to pro
Nov 22, 2011
-
Getting Back in Front – Time for a Step Change in Engagement PracticesBy K Eglinton
The extractive industries response to community engagement due to social and political pressures in the 1980s and 1990s was the starting point of development leading to the modern function of corporat
Nov 22, 2011
-
Not for the Faint-HeartedBy J Whittle
This paper describes what is involved in carrying out a comprehensive optimisation of a long-term operating schedule for a mining complex. It details the data that must be assembled and discusses the
Nov 24, 2014