Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Ventilation Upgrade at the FrogÆs Leg Mine - Case StudyBy A Llewellyn, M Varvari
The ventilation circuit at the FrogÆs Leg Mine was originally designed to permit mining to progress down to 440 m below surface at a maximum production rate of 500 kt/a, as per the feasibility study.
Jul 1, 2013
-
Understanding Ore Characteristics and Equipment SelectionBy K T. Broekman, R L. Koenig
"The Braemar Iron Formation is atypical ore when compared to the current magnetite ores being processed. In attempting to process and economically recover the vast quantities of iron ore stored within
Aug 12, 2013
-
Sustainable production from rehabilitated coal mine pastures in southern Queensland’s Brigalow Region – Acland grazing trial resultsBy J Eberhard, C Paton, J Bennett, C Baillie, A Melland, J F. Clewett, T Newsome
A central aim of rehabilitation is to ensure that disturbed land is returned to a post-mine condition that is safe, stable and self-sustaining. This paper describes initial results from a grazing tria
Jul 25, 2018
-
Flotation launder design and the measurement of critical froth transport parametersBy B Wong, R G. Coleman
In flotation, the selection of the size, number and type of cell for a particular duty depends on two important factors. Firstly, the required flotation residence time and secondly, the physical const
Aug 29, 2018
-
Parametric assessment of tailings liquefaction and earthquake induced embankment deformations using FLACBy B Ghahreman‐Nejad, M Munro
Design of embankment dams often requires seismic analyses, or an assessment of earthquakeinduced ground and dam movements. There are a large number of cases where earthquakes have triggered sliding an
Jul 1, 2021
-
Investigating the Effect of Different Block Dimensions on the Economic Life of Open Pit MinesBy P Moarefvand, M Osanloo
The anticipated economic life of the mine, which defines the rate of mine production, is dictated initially by the design capacity of the mill/concentrator and the production capacity of the mine rela
Sep 26, 2011
-
Best practice in Multiple Indicator Kriging (MIK) – importance of post-processing and comparison with Localised Uniform Conditioning (LUC)By G Zhang, I Glacken
Multiple indicator kriging (MIK) has been used in the minerals industry for some decades. As one of the non-linear estimation methodologies, MIK has advantages related to resolving multiple or mixed p
May 24, 2023
-
Airborne contaminant monitoring strategy and technologyBy J H. J Holtzhausen
Never has there been more focus on the health, safety, and well-being of our employees at the workplace. Ever evolving expectations of individuals, companies and clients are shaping regulatory reviews
Oct 12, 2022
-
Improved mining recovery with bulk ore sorting and MR technologyBy C Beal, S Singh
Sensor-based bulk ore sorting is a form of preconcentration that autonomously measures and physically separates discrete bulk ‘pods’ of run of mine (‘ROM’) or primary crushed material. This case study
Nov 10, 2020
-
Knelson Continuous Variable Discharge Concentrator: Analysis of Operating VariablesBy I Grewal, B Klein
The Knelson Continuous Variable Discharge (CVD) is a continuous centrifugal gravity concentrator for high-mass yield recovery applications. It has four operating variables that enable control of mass
Jan 1, 2001
-
Design and Construction of the Access Tunnels for the New Top Ryde City Shopping Centre, Northern SydneyBy Q Yang
This paper describes the design and construction of three 7.2 m span access ramp-tunnels to the three level underground car park of the newly redeveloped Top Ryde City Shopping Centre in northern Sydn
Mar 8, 2011
-
Characterisation of pore pressure in tailings dams and the implications for designBy D Johns, L Murray
This paper discusses pore pressures in the embankments of tailings dams by comparing real world data with common design assumptions. Assessment of pore pressures has implications on material behaviour
Jul 23, 2018
-
SBRE framework – application to Olympic Dam depositBy D Clarke, I Minniakhmetov
This paper describes the application of the SBRE framework to model the Olympic Dam deposit, one of the largest copper and uranium deposits in the world. Geostatistical simulations are the best practi
May 24, 2023
-
Design and Construction of Sydney’s South West Rail Link Hume Highway UnderpassBy B Chapman, R Nievergelt, J Hill
A major component of Sydney’s new South West Rail Link project is the Hume Highway Underpass (HHU), an 80 m long twin track mined tunnel excavated at a depth of just 5 m below the pavement of the Hume
Sep 17, 2014
-
Lump Ore Properties and Their Impact on Value-in-use in IronmakingBy T Honeyands, L Jelenich
We are currently witnessing large fluctuations in the relative price of ironmaking raw materials brought on by changes in the dynamics of supply and demand, market conditions, environmental regulation
Jul 13, 2015
-
Dilution optimisation in sublevel open stoping operationsBy A Vakili
Dilution is associated with considerable direct and indirect costs in underground open stoping operations. As shown in previous works, an improved ability to predict dilution enables the economic risk
Mar 29, 2023
-
Optimisation of the Sepon Copper Milling CircuitBy A Jakowetz
OxianaÆs Sepon Copper Operation (part of the combined Sepon Gold and Copper Operation) is located in Savannaket Province, in southern central Lao PDR. The site is relatively remote, being some five ho
Jan 1, 2006
-
Washability modelling and estimation techniques used to improve coal handling preparation plant beneficiationBy P J. Handley
"Predicting how coal seams will be beneficiated through the coal handling processing plant (CHPP) has long been challenging within BHP Coal. Various coal seams from different areas are mined and stock
Sep 20, 2017
-
A Phased Approach to Test Programs to Meet Feasibility Study RequirementsBy E Williams
The role and importance of a well designed test work program during the development of an orebody is often underestimated. A test work program should be tailored to deliver very specific answers to re
Oct 5, 2011
-
Construction of the Seven Thousand Tonne per Day – Big Gossan Production ShaftBy N Herault
PT Freeport Indonesia recently completed preproduction development and construction of the Big Gossan underground copper and gold mine, located in the Ertsberg mining district of Papua, Indonesia. Pro
Mar 21, 2011