Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Standardising the Reconciliation Factors Required in Governance Reporting

    By J Centofanti, D Conti, R Riske, C Morley, A Cook

    Why is it so difficult? Why are there differences throughout the resources industry in how reconciliation factors are reported and calculated? Why is there no standard formula to use? These are common

    Jan 1, 2009

  • AUSIMM
    Designing and Delivering Explosives Systems and Solutions for the Underground Massive Mining Industry: The Next Five Years with Dyno Nobel

    The extraction of world-class mineral deposits using massive underground mining techniques is not an entirely new theme to world mining companies and experts. Previous MassMin conferences have helped

    Jan 1, 2000

  • AUSIMM
    R&D roadmaps in mining and water management – a design-led approach to driving sustainability and innovation

    By M Yadav, K Clode, S Daykin

    The mining industry faces numerous challenges related to sustainability and circular economy principles, necessitating strategic approaches to innovation and resource management. As demands for minera

    Sep 1, 2024

  • AUSIMM
    Derivation of a Backfilling Strategy for Tabular, Deep, Scattered Mining on Vaal Reefs

    By J J. Laas, A J. S Spearing

    Considering the capital outlay, running costs and inherent difficulties of backfilling operations at depth the benefits need to be clearly established, quantified and then exploited. Expansion of Vaal

    Jan 1, 1998

  • AUSIMM
    Glass Earth's Greenfields Gold Discovery Strategy Using Multi-Faceted Airborne Geophysical Surveying is Poised to Rewrite the Geology Of Central Otago

    By S Henderson

    The Otago Goldfield has produced approximately 8 million ounces of alluvial gold and over 2.5 million ounces of hard rock gold and is currently home to New ZealandÆs largest producing gold mine. In th

    Jan 1, 2007

  • AUSIMM
    The critical pool levels for the Yallourn Mine determined using the MGRI approach

    By N Patel, S Narendranathan, T Mok, J Lowe

    The Hazelwood Mine (HM) commenced operations in the 1950s and was originally operated by the State Electricity Commission of Victoria (SECV) prior to it becoming privatised. ENGIE, the current owners

    Aug 2, 2023

  • AUSIMM
    Derivation of a Backfilling Strategy for Tabular, Deep, Scattered Mining on Vaal Reefs (Minefill '98)

    By Laas JJ, Spearing AJS

    Considering the capital outlay, running costs and inherent difficulties of backfilling operations at depth the benefits need to be clearly established, quantified and then exploited. Expansion of Va

    Jan 1, 1998

  • AUSIMM
    Synergistic defoaming/anti-foaming in zinc leaching with surfactant and silicone based defoamers

    By Q Zhou, H Nordberg, W Wang-Geissler

    Efficiently controlling foam/froth within mineral processing continues to pose a challenge to the mining sector. The foaming characteristics of aqueous solutions for two-phase systems of air/liquid ar

    Aug 24, 2022

  • AUSIMM
    Excavating the First Underground Gyratory Crusher at the Deep Mill Level Zone Mine, PT Freeport Indonesia

    By E Hernandez, I Agustian, W Kusumohastuti

    PT Freeport Indonesia is completing the first underground gyratory crusher excavation at their Deep Mill Level Zone (DMLZ) mine located in the mountains of Jayawijaya, District of West Papua, Indonesi

    Mar 24, 2014

  • AUSIMM
    Three Decades of Gold Production at the Newmont Tanami Operations

    By A Cranley, A Giblett, S Thacker

    The Newmont Tanami Operations are located in the Northern Territory, approximately 550 km north-west of Alice Springs. The Granites process plant commenced operations in 1986 as a 300?000 t/a ball mil

    Sep 1, 2014

  • AUSIMM
    Case Study of Iron Ore Value Chain Optimisation

    By J Foo, T Kleinschmidt, B Reynolds, K Kennewell

    The consideration of complex supply chains often highlights multiple system bottlenecks that are localised and dynamic – they shift depending on what variability last influenced the system. Using the

    Jul 13, 2015

  • AUSIMM
    The influence of the strain rate and pre-static stress on the dynamic mechanical properties of medium sandstone

    By S Yang, J Wang, J G. Ning

    A series of conventional dynamic uniaxial compression (CDUC) tests and coupled static-dynamic loading (CSDL) tests were conducted using a split Hopkinson pressure bar (SHPB) system to explore the dyna

    Nov 29, 2022

  • AUSIMM
    Backfilled Pits – Laboratory-scale Tests for Assessing Impacts on Groundwater Quality

    By C Linklater, J Chapman, A Watson

    Closure options under consideration at some sites include backfilling mined-out pits with waste rock. Backfill may include mineralised and non-mineralised waste rock. Following groundwater rebound, fl

    Jun 28, 2016

  • AUSIMM
    Creep properties and energy evolution characteristics of weakly cemented rock under step loading

    By C X. Zhang, W K. Ru, S C. Hu

    To study the creep properties and the energy evolution characteristics of the weakly cemented rock (WCR) in western China, the creep deformation damage law of weakly cemented mudstone (WCM) under grad

    Nov 29, 2022

  • AUSIMM
    Sensors and Systems for the Measurement of Tunnel Movements During and After Construction

    By W Ward, J Clegg, R Barnes, T Zhong

    This paper provides an overview of methods for measuring tunnel deflection and construction’s effects on the surrounding environment during and post construction. It will also review illustrative case

    Sep 17, 2014

  • AUSIMM
    Virtual Reality Scientific Visualisation – A Solution for Big Data Analysis of the Block Cave Mining System

    By J Tibbett, A Colebourn, B Hebblewhite, F Suorineni

    The concept of Big Data refers to data sets that are so large, variable and/or complex that traditional data processing applications struggle to integrate the data for effective investigation, analysi

    Nov 4, 2015

  • AUSIMM
    A Practical Approach to Truck Dispatch for Open Pit Mines

    By D M. Silva, J C. Alves

    According to the literature, material transportation represents 50 per cent of the operating costs for an open pit mine. In this context, this paper proposes a multistage approach for dynamic truck di

    Sep 26, 2011

  • AUSIMM
    Genesis of the Large-sized Fozichong Lead-zinc Polymetallic Deposit, Guangxi, South China – Constraints from the Sulfide Mineralogy, Fluid Inclusions and Isotope Geochemistry

    By H Q. Zhang, M C Chai, W Fu, H Y Chen, L M. Wei, Q J. Yang

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Fozichong deposit – located in the south-western segment of the giant Qinhang metalloge

    Mar 18, 2015

  • AUSIMM
    Design of Equipment for Dynamic Burden Measurements

    By D Johansson, A Nordqvist, D Mihaylov, N Petropoulos, M Wimmer

    The flowability of the caved rock masses in the sublevel caving (SLC) mining method is of great importance. During the blasting process of a SLC-ring, the caved rock mass in front of the ring is compa

    Aug 24, 2015

  • AUSIMM
    The Operation of the LAROX PF-50 Pressure Filter at 'Ellatzite-Med' Flotation Plant, Bulgaria

    The Operation of the LAROX PF-50 Pressure Filter at 'Ellatzite-Med' Flotation Plant, Bulgaria The implementation of Larox pressure belt filter, type Larox PF-50 provided within 6˜8% moistur

    Sep 13, 2010