Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Prefeasibility Testing of Gold Ore Samples Prior to CIP Plant Design

    By K B. Quast

    During the prefeasibility stage of the mining cycle for a gold deposit, an evaluation of the ore leaching characteristics from various defined areas is essential prior to plant design. There are a num

    Jan 1, 1998

  • AUSIMM
    Characterisation of Glassy and Heterogeneous Cementing Phases of Municipal Solid Waste of Incineration (MSWI) Bottom Ash

    By R Badreddine, J Rose, L De Windt, P Chaurand, L Raimbault

    Municipal solid waste of incineration (MSWI) bottom ashes are recycled as aggregates in civil engineering. These heterogeneous materials are composed of crystalline and glassy solid phases which conta

    Jan 1, 2008

  • AUSIMM
    An Integrated Economics Model for In Situ Resource Utilisation in Support of a Mars Colony

    By C Tapia Cortez, A G. Dempster, R Fradet, S Saydam, T de Roche, R Shishko, J Coulton

    Human ventures into space are entering a new phase in which missions formerly driven by government agencies are now being replaced by those led by commercial enterprises – in launch, satellite deploym

    Nov 4, 2015

  • AUSIMM
    Optimising a Mineral Supply Chain under Uncertainty with Long-term Sales Contracts

    By J Zhang, R Dimitrakopoulos

    A two-stage stochastic mixed integer non-linear program is formulated for a mining complex to optimise strategic and tactical plans. The objective is to find the near optimal decisions for a mineral s

    Nov 24, 2014

  • AUSIMM
    Relationship between thermal conductivity and structure of alkaline earth (Ca, Mg) aluminoborosilicate melts

    By H Aoki, A Nakayama, K Morita, S Yamada

    The thermal conductivity of mold flux is crucial for optimising the productivity and quality of steels. This study investigates the thermal conductivity of molten oxides, including CaO-BO1.5-AlO1.5 (C

    Aug 21, 2024

  • AUSIMM
    High-Resolution Pit Water Quality Model for the Highway Reward Mine, Queensland, Australia

    By B G. Lottermoser

    Field and laboratory data combined with computational modelling have been used to predict the pit water quality for the Highway Reward mine. Open pit mining of the Highway Reward copper-gold deposit h

    Jan 1, 2003

  • AUSIMM
    Recent Development in Geoscience Research and Professional Education to Meet the Demands of Australia's Mining Industry

    The Research Centres Program initiated by the Federal Government and supported by the mining industry has had a major impact on geoscience research and education during the past five years. Eight m

    Jan 1, 1996

  • AUSIMM
    A New Metaheuristic Algorithm for Long-Term Open Pit Production Planning

    By C Niemann-Delius

    The problem of long-term open pit mine planning is a large combinatorial problem, which canÆt be solved easily by mathematical programming models because of the large problem size. In this paper a new

    Sep 26, 2011

  • AUSIMM
    Managing Safety: Management's Role in Preventing Accidents

    An intensive safety campaign at Mount Isa Mines Limited from 1956 to 1966 saw the lost time accident frequency rate fall to half its original level. A review of the safety programme was carried out

    Jan 1, 1975

  • AUSIMM
    The Discovery and Development of Coal in South Australia

    By Kwitko G

    Exploration for coal has been on-going in South Australia for the past 100 years. During this period substantial resources of low rank coal have been delineated throughout the State. These deposits

    Jan 1, 1992

  • AUSIMM
    Gold and Base Metal Mineralisation in the Central Pine Creek Geosyncline

    By Butler I. K, Nicholson P. M

    There are four main types of base metal and gold mineralisation recognised in the central Pine Creek Geosyncline. These are stratiform, polymetallic veins, stockwork/concordant gold-quartz veins and

    Jan 1, 1994

  • AUSIMM
    "Impact of Mineralogical Variation on the Smelting of Cu-Ni-PGM Concentrates"

    By J J. Eksteen

    "In the platinum group metals (PGM) industry, smelters are often perceived as ‘black boxes’ that have to process concentrates of variable mineralogy and originating from multiple mines operating along

    Jun 15, 2016

  • AUSIMM
    Which Way is the Wind Blowing Today? A Control Strategy Which Considers Meteorological Effects on Tunnel Ventilation

    By D J. Gray

    The 4 km long Huguenot Toll Tunnel in the Western Cape region of South Africa celebrated its tenth anniversary on 18 March 1998. At present a single (South) bore with bi-directional traffic flow is op

    Jan 1, 1999

  • AUSIMM
    Selling Australia's Crude Oil Production

    In 1984/85 financial year Australia produced 529 thousand barrels per day (kbd) of crude oil. By far the major contribution (453 kbd) was light waxy oil from offshore Gippsland, Victoria. When the

    Jan 1, 1986

  • AUSIMM
    The Use of Unique Admixture Technologies in Mine Backfill-Technology Description and Case Histories (037359e3-5adb-49ba-a78e-a0ed2db408e1)

    By Karlson R, Rispin M

    Chemical admixtures are not commonly included in the variety of backfill mixes used in the mining industry. This may be attributed to several reasons including, but not limited to: the perceived hig

    Jan 1, 1998

  • AUSIMM
    Mining Safety - The Lessons Learned but not Applied

    By J M TORLACH

    Learning is an iterative process, and we might reasonably expect that after more than a century of mining during an era of sustained technological development, (following a millenium or two of unrel

    Jan 1, 1992

  • AUSIMM
    Evolution of a Structural Framework for High-grade Iron Ore Deposits

    By A R. Cruden, M S. Egglseder

    The formation of banded iron formation (BIF)-hosted high-grade iron ore deposits in the Hamersley Province, Australia has been debated for decades. Although a structural control on their formation is

    Jul 13, 2015

  • AUSIMM
    Drilling and Blasting to Achieve Lower Costs for Deeper Stripping

    By Lemberg D. W, Friday R. G

    Potential means of lowering overall costs to permit deeper stripping include : 1. the use of larger diameter blastholes in highly-fissured strata (to reduce drilling costs); 2. dewatering from semi-

    Jan 1, 1981

  • AUSIMM
    Making Design and Construction Work

    By S Porter

    The Melbourne City Link Project is a privately funded road infrastructure project linking three significant existing freeways in the vicinity of the Central Business District. The State Government, th

    Jan 1, 1999

  • AUSIMM
    A Ventilation System for Large Block Cave Mines

    By M Stephens, T A. Sutra

    Currently, there are several open pit mines with production rates of about 200 000 tpd of ore that are reaching the end of their economic lives. In most cases, the remaining orebody extends to depths

    Jan 1, 2005