Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    Cape Lambert Port B Shiploading, Sampling and Analysis

    By M Graham, R Brunning, C Andringa-Bate, S Westergren

    In 2010, Rio Tinto Iron Ore’s operations commenced the planning and design of a sampling and analysis system for the new 50 Mt/a Cape Lambert Port B (CLB) facility. Current sampling systems at the por

    Jul 29, 2014

  • AUSIMM
    The evolution of structural and lithological domaining on the Spotted Quoll nickel sulfide mineral resource estimate

    By A D. Wulfse, C M. D Barton

    Underground fractured aquifers in the Ernest Henry deposit are to a large extent controlled by deposit scale brittle structures. The underground mine has been subdivided into nine water zones based on

    Mar 22, 2022

  • AUSIMM
    Modelling the Impact of Flash Flotation from Batch Cell Flotation Tests Using Limn

    By P Holtham, R Dunne, D Stoll

    Flash flotation is a process designed to remove coarse, liberated, fast floating minerals from hydrocyclone underflow. Irrespective of liberation, coarse particles would normally remain in a grinding

    Oct 29, 2012

  • AUSIMM
    Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming

    By Y Li, S Ramazan, E Topal

    A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t

    Nov 24, 2014

  • AUSIMM
    Monitoring Design and Data Management for a Multiwell CO2 Storage/Enhanced Coalbed Methane Test in a Stacked Coal Reservoir, Buchanan County, Virginia, USA

    By S J. Schafrik, C Keles, C Schlosser, E S. Gilliland, A K. Louk, N S. Ripepi, S Keim, J Amante, E Diminick

    Three legacy coalbed methane production wells have been converted to injection wells for a one-year carbon dioxide (CO2) injection test to evaluate the potential for CO2 storage in the coal reservoir

    Nov 4, 2015

  • AUSIMM
    The Roy Hill Project

    By J M. F Clout

    The Roy Hill Project is an independent integrated port, rail and mine development in the Pilbara region of Western Australia. The bankable feasibility study for the project was completed in January 20

    Jul 11, 2011

  • AUSIMM
    Bowen Basin Coalmine Spoil Classification for Improved Mine Rehabilitation Outcomes

    By T Baumgartl, J Burgess, B Emmerton, P D. Erskine

    Large-scale open cut mining in the Bowen Basin has been undertaken for over 40 years. During this period, improved mechanical capability and economics have allowed extraction to greater depths, result

    Jun 28, 2016

  • AUSIMM
    The evolution of production blasts at Ernest Henry Mine

    By C te Kloot, Z Liu

    Blast performance and the resulting drawpoint condition and volume of oversize has the potential to impact operator safety and mine productivity. Underground measurements showed that approximately 14

    Oct 16, 2017

  • AUSIMM
    The critical pool levels for the Yallourn Mine determined using the MGRI

    By J Butler, N Patel, S Narendranathan, S Rastogi

    The Yallourn Mine (YM) commenced mining of brown coal in the 1920s under operation by the State Electricity Commission of Victoria (SECV), prior to it becoming privatised in 1996. The present owners o

    Aug 2, 2023

  • AUSIMM
    Uranium Mining, Nuclear Power and Sustainability - Rhetoric versus Reality

    The major greenhouse gas emissions from coal combustion are leading certain people to argue for uranium mining and nuclear power to meet these challenges. Although there is considerable rhetoric aroun

    Jun 1, 2010

  • AUSIMM
    Landform Design for Pilbara Mine Site – Why Plan and Design Waste Rock Dumps for Closure Based on Site-specific Conditions?

    By G Hancock, A Kemp, I Taylor

    The mine site is situated south east of Port Hedland in the Pilbara region of Western Australia. A detailed engineering design was undertaken for six irregularly shaped waste rock dumps at the site. T

    Jul 16, 2014

  • AUSIMM
    Modern X-Ray Diffraction Techniques as a Fast Industrial Analysis Method for Iron Ores - From Exploration to Process Control

    By L Gobbo

    X-ray diffraction (XRD) provides useful information about the composition of an ore sample in terms of quantification of crystalline phases and amorphous content. The use of new, fast detection system

    Jan 1, 2009

  • AUSIMM
    Effective Immersive Visualisation Systems for Mining Applications and Beyond

    By E Widzyk-Capehart, T Bednarz, O Daud, N Cutmore

    The interest of industry, in particular future mining, is pointing towards the use of novel visualisation systems to improve the operational efficiency of user interfaces. While the technologies used

    Nov 4, 2015

  • AUSIMM
    Observations on the Behaviour of a Gold Tailings with Hypersaline Pore Fluid

    By D Reid

    Characterisation of non-plastic segregating tailings presents a number of challenges: the material cannot typically be sampled in an undisturbed state, remoulded samples exhibit different behaviour to

    Jul 27, 2015

  • AUSIMM
    Resource Modelling and Mine Design at Obuasi Mine, Ghana

    By C K. Boafo, J Visser

    Obuasi Mine in Ghana, with more than 100 years of mining history, developed from a surface operation into a deep >2000 m underground gold mine. The challenge is to extract value from narrow veins l

    Jan 1, 2008

  • AUSIMM
    Saprolites, Structures and Slope Angles - Applying Site-Specific Geotechnical and Mining Knowledge to Achieve the Final Design

    By E C. F Hamman

    Sunrise Dam Gold Mine is a large open pit mine 730 km NE of Perth, Western Australia. Contract mining commenced in the open pit in September 1996 in lake clays and saprolites with the first fresh rock

    Jan 1, 2007

  • AUSIMM
    Designing Energy Efficiency Assessments that Work - Thiess Australian Mining û Case Study

    By P Crittenden

    Thiess Pty LtdÆs Australian Mining business unit used 7.6 PJ of energy in the 2007/2008 financial year. This represented more than 85 per cent of Thiess Pty LtdÆs total energy use and therefore meant

    Jan 1, 2009

  • AUSIMM
    Thermal Modelling and Mitigation Measures for the Bogong Power Development

    By D Wimpenny

    The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe

    Mar 8, 2011

  • AUSIMM
    Dilution, Ore Grade and Blast Movement Calculation Model

    By I C. Carrasco, V G. Mirada, J F. D Domingo, F S. Leite

    This paper investigates ore loss and dilution produced by rock movement in bench blasting. A total of four blasts, in which electronic detonators have been used, were monitored in Cobre Las Cruces Ope

    Aug 24, 2015

  • AUSIMM
    Iron Ore Grade Control for Flitch Mining – An Alternative Method for the Hope Downs Operation, Hamersley Province, Western Australia

    By A D. Caccioppoli

    Grade control systems within Rio Tinto Iron Ore have proven to be robust, when mining full benches. The Hope Downs 1 operation hosting two Marra Mamba Iron Formation deposits (North and South Deposits

    Aug 22, 2011